Level 3 early warning processing process
The three-level early warning processing process is as follows:
The flood control and heavy rain prevention leading group proposed specific measures and issued notices to relevant departments and work areas. All relevant departments and work areas must take immediate action in accordance with the spirit of the notice, inspect and implement the various preparations for flood control and heavy rain prevention plans in their respective systems, and be in a state of preparedness. For machinery and warehouses in low-lying areas prone to waterlogging and landslides, relevant units must promptly and safely transfer them according to the division of responsibilities to ensure the safety of people's lives and property.
Relevant departments of the project department must be on duty 24 hours a day, with leaders taking charge. It is necessary to turn on the computer around the clock to ensure smooth communication and maintain contact with various work areas at all times. The front-line rescue supplies and rescue teams in each work area must be fully implemented, and the responsible persons must be in place. Once a danger occurs, they must be available at any time and quickly invest in rescue and disaster relief.
On-site protection measures
1. Prepare emergency rescue materials and personnel according to the requirements of flood control and heavy rain prevention emergency plans.
2. The drainage system in the camp area and construction site should be inspected, rivers should be dredged, and blocked areas should be dealt with immediately.
3. Temporary drainage systems must be provided for roadbed projects.
4. Oil depots and oil tanks at the construction site must be protected from the sun and explosion.
5. The mixing building and bulk cement tanks of the mixing station must have ground anchors buried in the ground and be equipped with wire ropes.
6. Placards posted on site must be removed to prevent damage and the risk of collapse.
7. Temporary buildings at the construction site such as staff dormitories, power distribution rooms, air compressor rooms, steel sheds, etc. must be reinforced.
8. Strengthen the maintenance of construction access roads to ensure smooth and smooth roads.
- Related articles
- How do dry cleaners dry clean clothes?
- What are the seven-character poems about traffic safety?
- Which bus should I take from Gansu to Fuxin Road Gemini Building?
- How do novices learn to drive?
- Measures and suggestions for clearing up non-performing loans
- The bankĄ¯s opening slogan
- What does voluntary retirement mean?
- Classic famous quotes about World Book Day
- Opening lines for staff dinner
- I contribute to society. Composition. I beg you!