Safety hazards are caused by human factors, physical changes and environmental changes in the daily production process or social activities. Impacts, etc. will produce various problems, defects, faults, signs, hidden dangers and other unsafe factors. If they are not discovered, searched, and eliminated, they will disturb and affect the normal progress of the production process or social activities. This article is a notice on rectification of safety hazards that I compiled for everyone, for reference only.

Selected Notices for Rectification of Safety Hazards 1

Mining Company:

On June 24, 20__, the town government issued a notice regarding your company’s The four groups of quartz mine prospecting and mining operating areas in Longtan Village conduct safety production inspections. After an on-site inspection, it was discovered that your company has many potential safety hazards. The safety hazards and rectification opinions are now notified as follows. Please make rectifications carefully.

1. Potential safety hazards

1. Safety knowledge is not properly publicized, and there are no warning slogans or signs in dangerous operating areas.

2. The safety production management system is imperfect. There is no public safety management system in the working area and no safety production records.

3. There are no safety warning signs or road signs on dangerous sections of roads in the mining area; the access road for workers to and from is steep and there are no safety protection measures.

4. The reinforcement measures for the mining tunnel entrance are incomplete and there is a risk of collapse; the temporary mining area has no safety protection measures and there is a risk of landslide.

5. The workers’ living area is close to the mining area and is located at the entrance of the cave or downstream of the ravine. There is a lack of safety precautions and there are potential safety hazards.

6. The workers’ dietary hygiene conditions are poor and the facilities are crude, posing potential food hygiene and safety hazards.

7. The fire prevention, flood prevention and safety production plans in the mining area are not perfect.

2. Opinions on rectification

1. Strengthen the publicity of safety production knowledge. Strengthen daily safety education for workers. Improve workers' self-safety awareness through publicity.

2. Make fixed warning signs and safety slogans at construction sites, sites, and roads to create an atmosphere for safety production publicity and education.

3. Reinforce holes and roads with potential safety hazards in accordance with technical standards. Drainage ditches must be built above the cave entrance to prevent landslides or collapses.

4. Improve workers’ accommodation conditions. Outside the mining operation area, choose a safe location and build worker sheds to meet the basic safe accommodation conditions for workers (2-month rectification period).

5. Improve workers’ dietary conditions and pay attention to dietary hygiene. Improve food poisoning prevention measures.

6. Establish safety production inspection log. Personnel in charge of production safety must insist on inspecting key areas, sites, and roads every day, and deal with hidden dangers in a timely manner if they are discovered.

7. Adhere to the system of leadership leading the team to go down the well; establish a registration system for workers entering and leaving the well.

8. Improve the safety system, identify full-time safety officers, clarify responsibilities, strengthen monitoring and inspection, and keep safe production records.

9. Improve fire prevention, flood prevention, production safety and other related plans.

10. Strengthen guard management and refuse irrelevant personnel from entering the mining operation area.

11. Complete relevant licensing procedures in a timely manner.

Your company should attach great importance to the above safety hazards and suggestions for rectification, study them carefully, formulate rectification measures as soon as possible, and rectify them item by item. Except for item 4, all rectification opinions must be rectified before April 24, and the rectification status must be reported to the town government.

Yingpan Town People’s Government

June 24, 20__

Selected Notices on Safety Hazard Rectification 2

Xincheng Real Estate Development (Wuxi) Co., Ltd.:

I, ID number, signed the "Commercial Housing Sales Contract" with your company on "Contract"), I, as the buyer, purchased the unit-level house in Building B, Shangjin City, a real estate residential project developed by your company (hereinafter referred to as the "House"). I have successively provided the down payment and bank loan to your company. The entire house payment was paid in RMB Because your company failed to deliver a house that met the statutory and agreed conditions within the contract period, that is, before April 30, 20__, it constituted a serious breach of contract. We hereby issue this time-limited rectification notice to your company and explain the reasons as follows:

1. The house delivered by your company does not meet the legal conditions for house delivery

1. Your company refuses to issue a house certificate Proof of qualified acceptance - "Residential Project Quality Household Acceptance Record" and "Project Completion Acceptance Record Form", first, in accordance with Wuxi Residential Project Quality Household Acceptance Management Measures (Trial) Second The term "housing-based acceptance of residential project quality" as mentioned in these Measures refers to the acceptance of unit projects before completion in accordance with the approved construction drawing design documents, national project quality acceptance specifications, Jiangsu Province's "Common Quality Control Standards for Residential Projects", and other relevant Technical standards carry out special acceptance of the public parts of each household and unit project in a residential project. These measures shall apply to household-based quality inspection and acceptance of residential projects and their supervision and management within the administrative area of ??this city.

Article 5 The "Residential Project Quality Acceptance Record by Household" shall be handed over to the residents together with the "Residential Project Quality Guarantee" when the house is delivered.

However, your company failed to issue the "Household Quality Acceptance Record of Residential Projects".

Secondly, the "People's Republic of China Urban Real Estate Management Law (Amendment)" stipulates that the design and construction of real estate development projects must comply with relevant national standards and specifications. The real estate development project can only be delivered for use after it is completed and has passed the acceptance inspection. Article 17 of the "Regulations on the Management of Urban Real Estate Development and Operation" stipulates: "A real estate development project can be delivered for use only after it has been completed and has passed the acceptance inspection; if it has not been inspected or failed to pass the acceptance inspection, it shall not be delivered for use; after the real estate development project is completed, the real estate development project shall not be delivered for use." The development enterprise shall submit an application for completion acceptance to the real estate development authority of the local people's government at or above the county level where the project is located. The real estate development authority shall, within 30 days from the date of receipt of the application for completion acceptance, organize a review of matters involving public safety. The project quality supervision, planning, fire protection, civil air defense and other relevant departments or units shall conduct acceptance inspection." Order No. 78 of the People's Republic of China and the Ministry of Construction of the People's Republic of China and the Ministry of Construction on April 7, 20__, "Interim Measures for the Administration of Completion Acceptance and Registration of Housing Construction Projects and Municipal Infrastructure Projects"

Article 4 stipulates that "the construction unit shall Within 15 days from the date of completion acceptance of the project, in accordance with the provisions of these Measures, it shall be filed with the construction administrative department of the local people's government at or above the county level where the project is located." Article 6 stipulates that "the filing authority receives the completion acceptance filing submitted by the construction unit. After verifying that the documents are complete, the document acceptance should be signed on the project completion acceptance record form." According to this, "commercial housing has passed the acceptance inspection" means passing the completion acceptance and obtaining the "Project Completion Acceptance Registration Form". Now your company refuses to produce proof of acceptance of the above-mentioned house, indicating that the house does not meet the conditions for delivery and use, and the buyer has the right to refuse to accept the house.

2. The "Residential Quality Guarantee" issued by your company is incomplete and lacks the completion acceptance time, the quality warranty department's response time limit, the reasonable service life of the project, etc.

3. The "Residential Instructions" issued by your company is incomplete, and the residential performance certification level is missing. In particular, the residential energy-saving form content as a contract document lacks relevant data such as heat transfer coefficient and shading coefficient.

Article 8 of the contract stipulates: "The seller shall, before April 30, 20__, in accordance with the relevant regulations of the state and local people's government, meet the following 1st condition (that is, the commercial house passes the acceptance inspection ), and the commercial house that complies with the provisions of this contract will be delivered to the buyer for use."

Article 11 of the contract stipulates: "After the commercial house meets the conditions for delivery and use, the seller shall notify the buyer in writing to handle the delivery procedures. When the two parties conduct acceptance and handover, the seller shall present the supporting documents specified in Article 8 of this contract. If the selling documents are not provided or the supporting documents are incomplete, the buyer has the right to refuse the handover, and the seller shall be responsible for the resulting late delivery. bear".

According to the provisions of the above laws and regulations and the contract, the buyer believes that because your company failed to produce statutory and agreed supporting documents when delivering the house, the buyer has the right to refuse to take possession of the house. The liability for breach of contract resulting from late delivery shall be borne by your company.

(2) Problems in the house

1. Please see the attachment for the house inspection quality standards and house inspection results.

2. The air-conditioning unit cannot be installed

3. There is a lack of external window shading. According to the relevant content of the "Residential Instruction Manual" issued by your company, there are other forms of shading for external windows in residential energy-saving modes. According to Article 35 of the Energy Conservation Law of the People's Republic of China and the State, construction, design, construction and supervision units of construction projects shall comply with building energy conservation standards.

For construction projects that do not meet building energy conservation standards, the construction department shall not approve the start of construction; if construction has already started, it shall be ordered to stop construction and make corrections within a time limit; if it has been completed, it shall not be sold or used.

The construction authorities should strengthen supervision and inspection of the implementation of building energy-saving standards for construction projects under construction.

Article 36 When selling houses, a real estate development enterprise shall clearly disclose to the purchaser the energy-saving measures, insulation project warranty period and other information of the house sold, in the house sales contract, quality guarantee letter and instruction manual. stated, and shall be responsible for its authenticity and accuracy.

According to the "Implementation Opinions on Further Strengthening the Energy Conservation of Civil Buildings in Our Province" Su Jianke [20__] No. 206

(19) Energy-saving design must fully consider the building, structure, and materials , equipment, environment and other factors to carry out system optimization and technology integration. The site selection, layout, orientation, spacing, floor height, etc. of the building should be reasonably planned and designed. The application of energy-saving doors, windows and insulating glass should be actively promoted; the use of non-energy-saving glass curtain walls and glass windows is strictly prohibited; external sunshade measures must be taken for exterior windows and the use of bay windows is restricted; in addition to the above regulations, public buildings should also limit the transparency of roofs The area of ??the atrium, reasonable design of indoor space and height.

In summary, the buyer believes that your company's failure to deliver a house that has passed the acceptance inspection in compliance with the contract conditions and legal conditions before April 30, 20__ has constituted an overdue period. For this reason, the buyer has the right to refuse to accept the house that does not meet the delivery conditions and require your company to rectify the parts that do not meet the agreement within a time limit. Those that can be rectified must be rectified, such as external shading and other issues. The parts that cannot be rectified must be replaced by other methods (such as cash or other compensation). Starting from May 1, 20__, within a time limit of 60 days, your company will rectify the above problems. After the rectification is completed, your company will be required to issue a written notice of completion of the rectification to the buyer with your company's official seal. The resulting delay in delivery will be borne by the seller. Corresponding compensation will be charged according to legal regulations, contract stipulations and actual delivery date. Property fees are calculated from the actual delivery date. In accordance with the principles and spirit of legal fairness, justice and openness, it is hoped that the seller will take a positive attitude, excellent service awareness and professional quality, and fulfill its legal and contractual obligations and responsibilities to properly solve the problem; Party B reserves the right to use all legal means to safeguard the The right to own rights and interests; all losses caused by the seller's inaction, negative actions and illegal activities shall be borne by the seller.

Notice hereby!

Buyer: (Signature)

May X, 20__

Notice of rectification of safety hazards Book Selection 3

Unit:

After conducting inspections on the production safety of your unit over the years, months and days, your unit has the following problems:

In order to ensure For safety, your unit is required to rectify all hidden dangers before the year, month and day, and report the rectification situation to the Town Safety Committee in writing. Otherwise, we will apply to the relevant law enforcement departments to make administrative penalty decisions on your unit in accordance with the relevant laws and regulations of the "Work Safety Law" and hold the relevant personnel accountable.

Signature of the inspector: Signature of the person in charge of the inspected unit:

Year, month and day

Selected 4 notices for rectification of potential safety hazards

Company:

On the day, month and year, the People's Government of Gaojiaying Town conducted a safety production inspection on your company in the region

. After an on-site inspection, it was discovered that your company has many potential safety hazards. The safety hazards and rectification opinions are now notified as follows. Please make rectifications carefully.

1. Potential safety hazards

1. Safety knowledge publicity is not in place, and there are no warning slogans or warning signs in dangerous operating areas.

2. The safety production management system is imperfect. There is no public safety management system in the working area and no safety production records.

3. There are no safety warning signs or road signs on dangerous sections of roads in the mining area; the access road for workers to and from is steep and there are no safety protection measures.

4. The reinforcement measures for the mining tunnel entrance are incomplete and there is a risk of collapse; there are no safety protection measures in the temporary mining area and there is a risk of landslide.

5. The workers’ living area is close to the mining area and is located at the entrance of the cave or downstream of the ravine. There is a lack of safety precautions and there are potential safety hazards.

6. The workers’ dietary hygiene conditions are poor and the facilities are crude, posing potential food hygiene and safety hazards.

7. The fire prevention, flood prevention and safety production plans in the mining area are not perfect.

2. Opinions on rectification

1. Strengthen the publicity of safety production knowledge. Strengthen daily safety education for workers. Improve workers' self-safety awareness through publicity.

2. Make fixed warning signs and safety slogans at construction sites, sites, and roads to create an atmosphere for safety production publicity and education.

3. Reinforce holes and roads with potential safety hazards in accordance with technical standards. Drainage ditches must be built above the cave entrance to prevent landslides or collapses.

4. Improve workers’ accommodation conditions. Outside the mining operation area, choose a safe location and build worker sheds to meet the basic safe accommodation conditions for workers (2-month rectification period).

5. Improve workers’ dietary conditions and pay attention to dietary hygiene. Improve food poisoning prevention measures.

6. Establish a production safety inspection log. Personnel in charge of production safety must insist on inspecting key areas, sites, and roads every day, and deal with hidden dangers in a timely manner if they are discovered.

7. Adhere to the system of leadership leading the team to go down the well; establish a registration system for workers entering and leaving the well.

8. Improve the safety system, identify full-time safety officers, clarify responsibilities, strengthen monitoring and inspections, and keep safety production records.

9. Improve fire prevention, flood prevention, production safety and other related plans.

10. Strengthen guard management and refuse irrelevant personnel from entering the mining operation area.

11. Complete relevant licensing procedures in a timely manner.

Your company should attach great importance to the above safety hazards and suggestions for rectification, study them carefully, formulate rectification measures as soon as possible, and rectify them item by item. Except for item 4, all rectification suggestions must be rectified by the day before, and the rectification situation must be reported to the town government.

Gaojiaying Town People's Government

x month x day, 20__

Selected 5 Notices on Safety Hazard Rectification

__Workshop (__Department):

After on-site inspection by the company’s personnel, it was found that the following safety hazards exist in your workshop (department):

1. The fire extinguisher has expired and has not been used. Report to the company and have it replaced.

2. Some employees failed to wear labor protection supplies as required.

3. The worker on the No. 3 lathe did not strictly implement the job operating procedures. You are now required to immediately organize personnel to rectify the above safety hazards and report them to the company's production safety management office in person. The company will arrange personnel to conduct a review. Inspector (signature):

Person in charge of the inspected workshop (department) (signature):

Written in advance of the year, month and year

Safety hazard rectification Selected Notices 6

Notice of Time-limited Rectification of Property

Company x:

According to the relevant regulations of the Property Management Co., Ltd., the current property management center will On __ day, we conducted an on-site supervision and inspection of your company and found that your unit has the following major (general) hidden dangers. After receiving this notice, please complete the rectifications before __ on x month, and submit the rectification results to the Property Management Center for acceptance within __ days on x month.