Joke Collection Website - Bulletin headlines - Installation steps of hand dryer

Installation steps of hand dryer

Installation steps of hand dryer:

(1) Make preparations before installation.

If both men and women use it, the height used by women should be better.

The installation position of the hanging iron plate should be firm and reliable, and the vertical wall should be selected as far as possible to ensure that the installation position H of the fuselage and its surrounding 100mm range are a vertical plane.

Please note that the installer:

① Please strictly observe the precautions when installing. See page 3 for details. Please make sure to follow the distance indication shown in the above figure to keep the hand dryer at a safe distance of 100 mm from the wall or nearby flammable materials. At the same time, there should be space on the left and right sides of the fuselage and it should not be surrounded by walls or anything.

(2) Please avoid installing in the place where people are likely to hit the fuselage, and avoid installing in the place where the door will hit the fuselage.

② Install the host.

1 Install the hanging iron plate with wood screws (4 pieces)

Installed on a concrete wall

(1) choose the location of the hanging iron plate on the wall, and determine the position s of the fuselage hook. (* * * There are 6 mounting holes, only 4 are needed).

(2) Drill a bottom hole in the wall with an impact drill, install a rubber plug, and fix the hanging iron sheet with screws.