Joke Collection Website - Bulletin headlines - 5 workshop safety protection self-inspection reports

5 workshop safety protection self-inspection reports

#report# Introduction As personal civilized literacy continues to improve, reports play a decisive role, and all information mentioned in the report should be accurate. The following is a self-inspection report on workshop safety protection compiled by us. Welcome to read it!

1. Workshop safety protection self-inspection report

According to the spiritual requirements of the district health system safety production work meeting and combined with the actual situation, our hospital convened a meeting in a timely manner to carefully deploy various tasks. A comprehensive safety and medical inspection was carried out throughout the hospital.

1. Organizational mobilization

The dean will convene a meeting of supervisors and departments to inspect key departments and positions in the hospital. Leaders in charge will go to their posts in person to conduct on-site inspections and educate the department. All hospital staff must do a good job in safety to avoid accidents and eliminate hidden dangers that affect medical safety.

II. Inspection content

The hospital’s production safety leading group conducted a thorough inspection of the entire hospital, including the formulation and implementation of various production safety rules and regulations. Electricity consumption and fire protection, management of flammable, explosive and other dangerous goods, and medical safety management and other projects, the specific situation is as follows:

(1) Organizational leadership

Implementation of the leadership responsibility system Good. A production safety leading group with President Xu Shengyan, Vice President, and Department Director as members has been established. Personnel on duty are in place and all rules and regulations are sound.

(2) Preventing medical accidents

Various core systems for medical safety have been implemented, and rescue measures for critical and severe patients are in place. All hardware facilities for medical safety are complete, and department facilities such as supply rooms and operating rooms are well constructed. The rules and regulations for the treatment of medical waste are sound, the treatment methods meet the standards, and dedicated management and responsibility are ensured.

(3) Firefighting

An emergency response plan has been established, firefighting responsibilities and fire drill systems have been improved, and personnel and funds have been put in place. The protective and monitoring measures in key and critical departments are strict.

3. Self-examination found safety hazards

1. Some electrical lines are aging, some departments have private power connections, and some switches are damaged, which poses hidden dangers.

2. The construction of fire-fighting infrastructure is imperfect and the number of fire-fighting equipment is insufficient.

IV. Rectification measures

Through this safety production self-examination and rectification activities, our hospital has discovered the weak links in our hospital’s production safety. We will take strong measures to actively rectify them to prevent Various safety accidents occur. Any safety hazards discovered will be rectified within this week, and the production safety leading group will conduct on-site inspections at that time. Those who do not make changes within the time limit or who fail to make rectifications in place will be seriously held accountable.

2. Workshop safety protection self-inspection report

Carry out enterprise safety production self-inspection and self-correction activities in accordance with the requirements of the "Notice on Concentrated Special Actions for Safety Inspection and Rectification". The leaders of our company attach great importance to it, actively organize relevant personnel to organize and mobilize, and seriously carry out self-examination and self-correction, leaving no dead ends. In response to existing problems and weak links, we will formulate a rectification plan based on the principles of determining personnel, time, measures, and funds, and implement rectification measures to prevent accidents.

1. Strengthen management and clarify responsibilities

In order to effectively strengthen the leadership of our company’s production safety work, the company has adjusted and enriched the company’s production safety leadership group, striving to achieve clear goals and Responsibilities are implemented, work is done in place, and problems are nipped in the bud.

2. Refine measures and implement them in place

Comprehensively implement the policy of "safety first, prevention first" and the spirit of relevant documents on production safety of divisions and regiments, and insist on achieving Manage according to law, strengthen supervision, strictly inspect, and urge rectification so that hidden dangers can be eliminated and accidents can be controlled. Focus on supervision, strictly prevent general safety accidents, eliminate serious and major safety accidents, and ensure the safety of employees' lives and property

3. Appropriate work content and measures

1. Strengthen safety knowledge We conduct publicity and education and strive to improve the safety awareness of employees throughout the company.

We should conscientiously carry out publicity and education on production safety laws, regulations and policies, advocate and implement the construction of safety culture, and enhance the company's employees' awareness of production safety. In accordance with relevant requirements, our company actively selects personnel to participate in safety training and refresher training organized by superior authorities, and effectively trains company employees on safety production knowledge and production skills, and strives to ensure that the employment rate of special operations personnel and practitioners with certificates reaches the highest level. 100.

2. Strengthen safety responsibility management and establish and improve various rules and regulations. The first person responsible for the safety work of the unit is directly responsible for the unit's safety production work. He must effectively perform his duties, strengthen supervision and inspection, eliminate various safety hazards in a timely manner, and strictly prevent the occurrence of various safety accidents. First, we must conscientiously implement the safety production target management responsibility letter signed with the company, so that we have positions, positions, and responsibilities. Second, the company's production safety leadership group regularly organizes personnel to inspect and supervise the implementation of various departments, and registers the situation as a scoring basis for the year-end comprehensive assessment. Third, each unit must formulate and improve various safety production rules and regulations and safety production procedures based on its own actual conditions, and strictly implement them to eliminate the "three violations" and ensure that safety production has rules to follow.

3. Carry out comprehensive safety production inspection. The company's production safety leadership group organizes a comprehensive safety production inspection every quarter. For major hidden dangers in the workshop, it urges them to formulate rectification measures, implement funds, arrange special personnel to supervise rectification, and file the hidden danger inspection and rectification status for archiving; Workshops and safety responsible units organize a safety inspection every month to discover hidden dangers, formulate measures, assign dedicated personnel, make rectifications within a time limit, and report the situation to the enterprise's production safety leadership team in a timely manner.

IV. Existing problems and deficiencies and rectifications

1. Self-made hooks are not allowed.

2. No random connection or welding of hooks (mainly on the gates and pillars on the first floor).

3. The escalator on the second floor of the workshop is partially deformed.

4. The nylon rod of the motor for beating wood chips should be replaced.

5. The finishing area is messy, and the silicon bags should be placed in the machine repair workshop and collected and used in daily quantities.

6. Debris is piled on the distribution box.

7. The person coming out of the oven is not wearing goggles, work clothes, or a mask.

5. In response to the problems identified above, in the next step of work, we must strengthen measures, urge the workshop to rectify on time, review on schedule, track rectification, ensure that rectification is in place, and make the following points:

1. Put the silicone bag into the machine repair workshop and collect it for use every day. Make sure the finishing area is clear of clutter.

2. The nylon rods of wood-cutting motors and workshop escalators should be inspected, repaired and replaced regularly by mechanics.

3. The installation and maintenance of electrical equipment should be performed by electricians, and the circuits and all electrical equipment should be checked regularly.

4. The circuits in the workshop power distribution room need to be inspected regularly by electricians to ensure the orderliness of the circuits.

5. The power distribution cabinet on the second floor of the workshop needs to be replaced and locked.

6. Strengthen the awareness of the importance of wearing goggles, work clothes, and masks for workers who are out of the furnace, and establish awareness of safe production. Earnestly implement the safety production responsibility system.

7. It is strictly forbidden to weld and hang indiscriminately in the workshop to ensure the standards of the workshop.

Under this self-inspection and self-correction of "cracking down on illegal activities" and "hidden hazard investigation", our company attaches great importance to further enhancing the safety hazards of the enterprise and employees and effectively eliminating them. The rectification opinions were quickly implemented, and the entire self-examination and self-correction work achieved good results.

3. Workshop safety protection self-inspection report

In order to further strengthen and improve the safety work of the project department, respond to the call of the institute, effectively protect the life safety and property safety of the majority of employees, and ensure the normality of the project According to the construction order, combined with the actual situation of the project department, our department has carefully and meticulously inspected the safety work at the construction site, and carried out hidden danger inspection and management activities at the construction site. The self-inspection and rectification situation is summarized as follows:

1. Safety management

1. Establishment and improvement of safety organization structure

The project department has established a safety management network and safety production responsibility system with the project manager as the first responsible person. , safety management system. A full-time safety officer is assigned to be responsible for on-site safety inspections and safety inspections at the construction site, forming a top-down safety assurance system.

2. Implementation of the safety management system and responsibility system

(1) At present, the project department’s safety regulations are complete and highly operable. Continuously improve the execution of safe and civilized construction systems to strengthen safe and civilized construction management and prevent accidents.

(2) In order to ensure safe production, the project department formulated safety target indicators and decomposed them layer by layer according to the relevant requirements of the company, clarified the safety responsibilities of personnel and departments at all levels, and during the construction process Supervision is implemented in place.

The project department signed a "Safety Responsibility Letter" with the heads of each construction team, and strictly implemented the safety production responsibility system at all levels and the safety accident liability investigation regulations. Supervise, inspect and assess the implementation of the system, promptly remind and educate those who violate the responsibility system, and provide rewards and punishments based on assessment results.

3. Safety inspection and hidden danger investigation

In addition to daily safety inspections, the project department also purchases various safety warning signs and construction signs according to the site conditions. During construction, Corresponding warning placards should be placed at the entrance to the site, passageways, and near electrical equipment to remind staff to pay attention to protect themselves and others and eliminate potential safety hazards.

4. Safety education and training

(1) The project department conducts timely safety education and training for new site managers and workers from time to time. The main contents of the training include: corporate rules and regulations, basic safety knowledge, construction safety precautions, various relevant safety technical measures and operating procedures, emergency rescue plan learning, etc.

(2) Participate in safety technical training and certification for electricians, welders, loader drivers and other special operations personnel as required.

(3) Each construction team conducts its own team safety education activities.

2. On-site construction safety conditions

1. Temporary facilities

(1) The temporary facilities are planned strictly in accordance with the requirements and the layout is relatively reasonable.

(2) Temporary facilities must meet technical requirements such as fire protection, rainproofing, and heat preservation. Personnel are arranged to patrol the living and office areas, construction areas, warehouses, and mechanical equipment parking areas 24 hours a day to ensure the safety of on-site supplies and materials.

2. Safe use of electricity

At the construction site, "one machine, one gate, and one leak" for electrical equipment ensures the safety of electricity; warning signs are placed on power supply equipment. . Lighting fixtures and power supply lines shall be installed as required. Electricians on duty will conduct regular inspections and deal with hidden dangers in a timely manner to prevent accidents.

3. Special equipment

The daily operation and maintenance of major mechanical equipment are handled by dedicated personnel. During the use of equipment and transportation vehicles, regular inspections, repairs and maintenance should be carried out, and equipment operation, repair and maintenance records should be filled in. Immediately stop work, rectify or remove equipment with potential safety hazards. Scaffolding construction

4. Fire management

The project department has formulated a fire management responsibility system and implemented it in place. Developed and improved fire emergency plans.

The project department has stepped up inspection and monitoring of fire-prone areas.

(2) There are no violations in work areas or parts where fireworks or smoking are prohibited.

5. Safety protection facilities

During construction, safety management personnel can formally wear and use protective equipment such as safety helmets and safety belts; protective facilities and safety equipment are set up at cave entrances and dangerous locations. Obvious warning signs; fire-fighting facilities are installed near electrical parts and flammable materials.

3. Problems in safety management

1. Individual personnel have weak safety awareness, and habitual violations still occur at the construction site.

2. The layout of construction power lines is messy and needs further regulation.

3. Equipment is inspected regularly and various systems are improved; however, the inspection data and records of the equipment itself are incomplete and need further improvement.

4. Some safety protection facilities have not kept up with the progress of project construction, causing safety protection to lag behind during construction.

IV. Rectification measures taken

In order to ensure the safety of project construction and eliminate various safety hazards, the project department proposed the following rectification measures for the main problems existing during the self-inspection process:

1. The project department will strengthen supervision and carry out safety education in batches, using daily inspections, inspections, meetings, safety education and training, bulletin boards, newspapers, documents and other methods to educate employee cadres on safety knowledge, laws and regulations. Education and publicity on laws and regulations, etc., to improve employees’ safety awareness and sense of responsibility, and to prevent the occurrence of safety accidents.

2. We will continue to pay attention to the issue of electricity consumption in construction, strictly investigate the illegal use of electricity in workers’ dormitories, and conduct unified and standardized layout of on-site wiring.

3. Strengthen the supervision of habitual violations. To strengthen safety education, management supervision and punishment, we must ideologically improve the safety awareness of employees.

4. Sound and perfect the system to ensure that comprehensive safety management work has rules to follow and is implemented in place. Strictly implement the responsibilities of all levels and departments in accordance with the safety responsibility system.

5. Carry out safety inspections and hidden danger inspections and management on a regular basis in a timely manner and in accordance with the regulations of the project department, and do a good job in finding and rectifying safety hazards at the construction site.

In short, through this major inspection, some shortcomings and omissions in the safety work of the project department were discovered. The project department made timely rectifications and brought them under effective control, but safety work is a long-term task. The project department will continue to pay close attention to safety, consolidate the basic work of safety management, improve the safety awareness of the majority of employees, enable various tasks and requirements of safety management to be better implemented, further enhance their awareness of safety responsibilities, and clarify their respective responsibilities. Responsibilities to provide safety guarantee for the smooth progress of project construction.

4. Self-examination report on workshop safety protection

Strengthen the investigation and rectification of safety hazards, and firmly establish that "safety is the eternal theme of the enterprise, and safe production is an important part of enterprise management." The basis for healthy development. "The concept gradually forms a healthy corporate safety culture and creates a strong safety atmosphere to ensure personnel safety and safe production of the enterprise.

1. Investigation content and investigation situation:

1. Personal safety: All employees in the workshop wear safety protective equipment neatly and receive safety training before starting work. Employees are required to be safe during pre-shift meetings. homework and regular safety lectures.

2. Equipment safety: Major safety hazards in workshop equipment and special equipment have been eliminated.

3. Fire safety: Warning signs are in good condition throughout the workshop, and fire extinguishers are fully equipped everywhere.

4. Site safety: The workshop safety guardrails are complete, materials are stacked uniformly, the mountain flood interception ditch and main flood drainage ditch behind the high-level pool and roller mill are unobstructed, and after screening, it is a bulwark to prevent water and soil erosion. Under construction.

5. Traffic safety: The company requires employees to abide by traffic laws when riding motorcycles to and from get off work. It is strictly prohibited to drive on the road without a license or license plate, speeding or overloading.

6. Food safety: The food safety and hygiene in the canteen is qualified.

7. Construction safety: Check the safety ropes and safety belts of all employees working at heights in the workshop and construction team.

2. Existing safety hazards and corrective measures:

1. The safety guardrails of some ball mills are damaged and need to be repaired, and the slope of the guard ladder is too steep and needs to be improved.

2. There is too much debris in the ball mill and roller grinding positions, requiring post personnel to sort it out.

3. The cable trenches at old line ball mills, roller mills, and CH880CH870 need to be covered.

4. The high-altitude cables under the broken 14# belt need to be laid underground and the wires connected by the external construction team are required to be handled in a standardized manner.

5. The New Line Ball Mill Transmission Department requires mechanics to weld protective railings.

3. Safety management:

1. It is necessary to further strengthen the spot inspection of workshop equipment, especially special equipment, to ensure the safe and stable operation of workshop equipment.

2. Regular self-examination and self-correction of hidden dangers, organizing team leaders and other personnel to carry out special inspections of workshop equipment, especially special equipment, and promptly rectifying the identified problems.

3. Safety management should be more comprehensive, solid, in-depth, and pragmatic, penalties should be further increased, and safety measures should be more standardized and refined.

4. The workshop strictly requires team leaders to supervise and guide the process monitoring of various processes and operations on site to ensure that all operations are safe and standardized.

5. Strengthen safety training in the workshop and improve employees’ safety awareness. Vigorously investigate safety defects and hidden dangers, carry out rectification and implementation of the discovered safety hazards and weak links, adopt all feasible methods and measures, and effectively increase the rectification efforts, so as to never let go of any hidden dangers and leave no dead ends. According to After inspecting the situation, we promoted the rectification of potential safety hazards in a planned and step-by-step manner according to priorities, and carefully implemented safety precautions for staff, laying a solid foundation for the long-term and healthy development of safe production work.

In short, safety work is a comprehensive task that relies on the joint efforts of all workshop employees. We must pay close attention to illegal operations, deal with them seriously when encountering problems, and never show mercy. In the future safety work, all employees in the workshop must unite as one, sum up past experiences and lessons, work diligently, continue to carry forward the work style of loyalty, responsibility, dedication and pragmatism, and protect the safe operation of the company's production system.

5. Workshop safety protection self-inspection report

In order to firmly establish the safety production policy of "safety first, prevention first", strengthen the investigation and rectification of safety hazards to ensure that personnel Safety and equipment operation safety ensure the company's safe production.

1. Investigation content

1. Personal safety: Workers in the workshop are fully equipped with labor protection supplies, and labor protection supplies are distributed on time and as needed. Safety training is provided before taking up the job, and safety production of employees will be emphasized before starting work.

2. Equipment safety: All major safety hazards of workshop equipment have been eliminated.

3. Fire safety: The safety warning signs in the workshop are in good condition, fire extinguishers are fully equipped everywhere, and the fire extinguishers are in good condition. Fire hydrants are in normal use.

4. On-site safety: Debris and broken glass in the workshop should be cleaned up in time.

5. Traffic safety: Employees are required to wear helmets when riding or driving to and from work, and must abide by traffic regulations.

2. Existing safety hazards and corrective measures

1. Some employees in the workshop have weak safety awareness. Employees’ safety awareness is further strengthened through daily class meetings and weekly safety education and training.

2. The equipment point inspection work is not detailed enough. It is necessary to further strengthen the point inspection work of equipment to ensure the safe operation of workshop equipment.

3. The fire extinguishers are not fully equipped. The existing 3 bottles of fire extinguishers in the workshop need to be replenished (will soon expire). The fire extinguishers that need to be re-equipped and replenished have been applied and registered with the company.

4. Sometimes the debris on site is not cleared in time. We should further strengthen the standards in line with the actual site.

3. Natural Gas Safety

Based on the specific conditions of the workshop and the current production status, the following natural gas operating procedures and specifications have been formulated to ensure the use of gas safety specifications.

1. Operating methods for natural gas use

2. Safety regulations for natural gas use

3. Natural gas inspection and maintenance

4 .Natural gas leakage detection methods and emergency leakage treatment

At this point, the investigation and rectification of potential safety hazards in the workshop have been completed or reported. In the future work, our workshop will continue to actively cooperate with the company's safety rectification work and strive to do a good job in workshop safety.