Joke Collection Website - Bulletin headlines - Detailed rules for the implementation of safety production and civilized construction supervision?

Detailed rules for the implementation of safety production and civilized construction supervision?

1. Project Overview: Subei Dike Line Reinforcement and Widening Project of Wujiang Section of East Taihu Lake 1, Bid Section 2, two project areas, 1. 1. Construction unit: Development Zone Construction Bureau 1.2 Project name: North dike line reinforcement and widening project of Wujiang section of Taihu Lake in eastern Soviet Union. 1.3 Construction site: Wujiang District. The construction period of this project starts from July 25th, 20 14 (commencement date) and is required to be completed on June 25th, 20 15. 1.5 project type: water conservancy project 1.6 project construction plan duration: 335 calendar days (excluding defect liability period, i.e. warranty period) 1.7 construction scale: the project cost is about 88.32 million yuan. 1.8 source of funds: central investment, self-raised by Wujiang district. 2. Compilation basis: (1) Regulations on Management of Water Conservancy Project Construction of Ministry of Water Resources; (2) Regulations on Safety Production Management of Construction Projects; (3) Approved supervision plan. 3. Guiding ideology of supervision work: establish the idea of "safety first", adhere to the policy of "prevention first" and firmly grasp the guiding ideology of "people-oriented". Iv. Specific work of safety supervision: 1. Strictly implement the Regulations on Safety Management of Construction Projects, and implement the current national laws and regulations on safety in production, the safety rules and regulations of the construction administrative department and the mandatory standards for construction projects; 2. Supervise the construction unit to implement the safety production organization guarantee system and establish and improve the safety production responsibility system; 3. Supervise the construction unit to educate the workers about safety in production, and make safety technical disclosure for the branch and unit projects; 4, review the construction scheme and safety technical measures; 5, check and urge the construction unit, in accordance with the requirements of construction safety technical standards and specifications, the implementation of the division, unit engineering or process safety protection measures; 6, supervision and inspection of the construction site fire control work, winter cold, summer heat, civilized construction, health and other work; 7, quality and safety comprehensive inspection. Those who find illegal and risky operations shall be ordered to stop operations; If potential safety hazards are found, the construction unit shall be required to rectify them; If the circumstances are serious, it shall be ordered to stop the operation for rectification, and report to the construction unit in time; 8. If the construction unit refuses to rectify or stop the construction, the supervisor shall report to the construction administrative department in time. V. Main methods of supervision work: (1) Pay attention to the review of safety and health assurance system in the review of construction organization design. (2) Check the implementation of the safety and health assurance system in the construction process and regularly check the safety and health files. (3) Regularly check the site safety and hygiene. (4) Safety and health should be emphasized at every meeting. All supervisors are safety officers, and they should report the site safety situation at any time, promptly notify the rectification, and urge the rectification. (5) An important means to assist the owner to formulate the Regulations on Safety and Health Management Punishment on the Construction Site and earnestly implement it. (6) When the process is accepted, the safety and health work shall be checked at the same time. Even if the process quality is qualified and the safety is not up to standard, the construction of the next process may not be carried out. (7) Construction machinery, scaffolding, etc. It can only be used after being accepted and listed by relevant units, and the hot work reporting system shall be strictly implemented. (8) Supervise the construction unit to hang propaganda slogans, erect safety warning signs, and conduct targeted safety disclosure at the same time of construction technical disclosure. (9) Scientific, standardized and standardized management. According to the arrangement of temporary construction facilities, the materials and components on site are neatly stacked, so that the materials are clear after work and the roads are smooth. (10) Prepare emergency communication contact map to prevent the occurrence of special events and ensure timely handling. Specific measures of intransitive verbs: Safety in production is a very important management content. Only when safety in production is implemented can we grasp the progress and improve the quality. According to the specific conditions of the project and the site, a complete safety production system and a reliable safety management network have been formulated. (1) safety management system 1. Safety production responsibility system: establish and improve the safety production responsibility system of all levels and departments, and implement the responsibility to people. All economic contracts have clear safety indicators and guarantee measures including rewards and punishments. A safety production agreement must be signed between the general manager and the subcontractor. 2, the new site workers must carry out safety education; When workers change jobs, they must receive safety technology education in their new jobs. Workers should master the operation skills of this type of work and be familiar with the safety technical operation procedures of this type of work. 3. Division and unit engineering safety technical disclosure: conduct comprehensive and targeted safety technical disclosure, and the disclosure person shall perform the signing procedures. 4. Work with certificates for special operations: Special operators must pass the training and examination and work with certificates. The operation certificate must be reviewed on schedule, and it is not allowed to be used beyond the time limit. The roster has been completed. 5. Safety inspection: A regular safety inspection system must be established. Have the time and requirements, clear key parts and dangerous positions. The safety inspection is recorded. The hidden dangers found should be rectified in time, so as to make sure that people, time and measures are fixed. 6. Team's "three posts and one evaluation" activity: the team must carry out the "three posts" of post disclosure, post inspection and post record and the "one evaluation" safety activity once a week before the shift. There should be assessment measures for the safety activities of the team. 7. Handling of industrial accidents: establish accident files, make handling reports according to investigation and analysis rules and regulations, and earnestly do a good job of "three don't let go". 8, the construction site must have a safety bulletin board. Safety propaganda slogans or safety warning signs must be hung on main construction sites, operating points, dangerous areas and main passages. (2) Technical measures for the safe use of scaffolding 1, scaffolding and components used must meet national standards. 2. Steel pipe scaffold shall be made of steel pipe with an outer diameter of 48-5 1mm and a wall thickness of 3-3.5mm, without serious corrosion, bending, flattening and cracks. Wooden scaffolding should use a small head with an effective diameter of not less than 8 cm, without decayed, cracked and withered Chinese fir poles, and scaffolding should not be mixed with steel and wood. The vertical pole spacing of structural scaffolding shall not be greater than 1.5m, the longitudinal horizontal pole (main pole) spacing shall not be greater than 1.2m, and the transverse horizontal pole (small pole) spacing shall not be greater than1m.. The vertical pole spacing of the decoration scaffold should not be greater than1.5m. The vertical horizontal pole (main pole) spacing should not be greater than 1.8m, and the horizontal horizontal pole (small pole) spacing should not be greater than1.5m. It is forbidden to use Chinese fir poles to build load-bearing scaffolding on the construction site. 3, scaffolding foundation must be smooth and solid, drainage measures, meet the requirements of scaffolding, ensure no subsidence, no water. Its frame body must be supported on the base (bracket) or scaffolding. 4, scaffolding construction operation surface must be covered with scaffolding, away from the wall shall not be greater than 20 cm, can not have gaps and probe plate, springboard. Protective railings and treadboards with a height of 18 cm shall be set outside the operation surface. When the clear distance below the operation surface of the scaffold construction layer is more than 3m, a horizontal safety net must be set up. When the horizontal net between the inner mouth of the double bent frame and the outer wall of the structure cannot be protected, the scaffold can be erected. The frame body must be closed with a dense mesh safety net along the inside of the outer frame, and the safety net must be firmly connected with the frame body, tightly closed and fixed. 5, scaffolding must be firmly connected with the structure, the vertical distance of the contact point shall not exceed 4 meters, and the horizontal distance shall not exceed 6 meters. Rigid materials must be used for pulling connection. Unloading measures should be taken for tall shelves over 20 meters. 6, scaffolding must be set up continuous bracing (cross cover) to ensure that the overall structure is not deformed, the width shall not exceed 7 vertical poles, and the angle between diagonal and horizontal plane is 45-60 degrees. 7. The internal and external load-bearing scaffolding used for the structure shall not exceed 2646 N/m2 (270 kg/m2). 8. A safe operating distance shall be maintained between the outer edge of the project under construction (including scaffolding) and the sideline of the power overhead line. Under special circumstances, effective and reliable protective measures must be taken. The bracket of wire protector should be made of non-conductive material, and the buried depth of its foundation stud is 30-50 cm. The whole line protector should have reliable support and traction measures to ensure the stability of the frame. 9. The width of the pedestrian walkway shall not be less than 1m, and the slope of the chute shall not be greater than1:3; The width of the feeding track shall not be less than 1.5m, and the slope of the chute shall not be greater than 1: 6. A platform should be set up at the corner, and protective railings and scaffolding should be set up according to the requirements of limb protection, and the spacing between non-slip strips should not be more than 30 cm. (III) "Three Treasures" and "Four Doors" Safety Protection Measures 1 helmet 1. 1 helmet must be a brand designated by the national or local safety supervision department at the time of purchase. 1.2 When the safety helmet is sampled in batches according to GB28 12-8 1, if it is unqualified, it shall be reinspected for the second time. 2 Seat belts: When purchasing seat belts, the standards (GB6095-85) must be followed, and the factory information should be filed. 3. Safety net: Safety net must be purchased according to the standard (GB5725-85), with dense mesh safety net, and the standard 1cm× 1cm mesh number is more than 2000 mesh. Construction site management personnel must urge workers to wear protective equipment correctly in accordance with relevant specifications. The hole above 4 150cm should be reserved, and guardrails should be set around it. A safety net should be laid under the hole, and two horizontal poles should be set according to the column height of1m.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd