Joke Collection Website - Bulletin headlines - Summary of personal work in hydropower plant

Summary of personal work in hydropower plant

Personal Work Summary of 2022 Hydropower Plant (5 selected articles)

The hard work is over. During this time, I believe that everyone is facing many challenges and has gained a lot of growth. It's time to write a work summary and analyze the past work. So, do you know anything about job summary? The following is a summary of my personal work in 2022 Hydropower Plant (selected 5 articles), hoping to help everyone.

Summary of Personal Work in Hydropower Plant 1 Time flies, and 20XX years have passed quickly. During this year, I lived, studied and worked with my colleagues. We have established a profound friendship with each other, honed our working ability in practice and greatly improved my professional ability and technical level. Of course, this is inseparable from the help of superior leaders and everyone's support. Thank you very much! As an employee of Mangkang Hydropower Station, I feel a great responsibility. I can't get the picture of the past year out of my mind. After careful consideration and summary, I have an objective and true evaluation of myself. In order to draw a satisfactory conclusion to this year's work, I will summarize this year's work as follows:

First, work attitude and ideological work.

I love my job, strictly self-discipline, abide by the rules and regulations of the factory, strictly control myself, straighten my post, and always maintain a "modest, cautious and self-disciplined" working attitude. With the care and training of the leaders and the help of my colleagues, I always study hard, make positive progress, strive to improve myself, always work hard, finish my tasks seriously and perform my duties.

Second, the production work

1. Carry out the provisions of laws and regulations on station management, improve the level of hydropower business, carefully use and maintain maintenance tools, regularly check whether the auxiliary facilities of hydropower in the station are in good condition, and report to the station leader immediately if problems are found, so as to minimize the occurrence of accidents in this unit.

2. Be strict with yourself, be lenient with others, and abide by the rules and regulations of the power station. I strictly abide by the rules and regulations of the station, and I don't arrive late, leave early and take the initiative to ask for leave. At work, respect leaders and unite colleagues. Usually diligent and thrifty, work hard, treat people sincerely, and have harmonious interpersonal relationships. I never have an unprincipled argument. I always standardize my words and deeds according to the requirements of a famous Xiushui electrician, constantly cultivate my comprehensive quality and learn the relevant policies, regulations and punishment scales of hydropower, master the correct construction methods, and timely replace and transform the aging and potential safety hazards of hydropower facilities.

This year, we have mainly completed the following work:

1, I love my job, I am constantly familiar with updating my business in my daily work, and I can do everything seriously and responsibly.

2, do a good job in the maintenance of water and electricity lines, do regular inspection, timely maintenance, ensure the normal operation of power supply, water supply equipment, seriously complete the necessary improvement tasks, keep the line equipment in good condition, rational use of water and electricity materials, take good care of tools.

3, can do things seriously in the work, do not leave the post, love the post, do not mess around.

4, pay attention to safety according to the relevant operating procedures.

5, completes the inspection and maintenance, eliminate and solve problems in time.

6. Do a good job in meter reading of water and electricity in the unit, and even remind and correct the behavior of not using water and electricity according to regulations.

7. Be strict with yourself in daily work and abide by the rules and regulations of the unit.

8. Complete other tasks arranged by the leaders.

Looking back on the work in the past year, although I have achieved good results, there are still some shortcomings, but I will live up to the trust of the leaders. Facing the new year's work, I will start from scratch and work hard as always to be an excellent worker.

Summary of Personal Work in Hydropower Plant In 2 20xx, our factory adhered to the flood control policy of "safety first, constant maintenance, prevention first and all-out rescue", conscientiously implemented the spirit and requirements of flood control work of Huadian Group Corporation and Huadian Fujian Power Generation Co., Ltd., and earnestly implemented the post responsibility system for flood control at all levels under the guidance of the power grid water dispatching center, supported by management and technological innovation, based on flood control, early prevention, disaster prevention and power generation protection. Thanks to the joint efforts of all employees in the factory, the organic combination of flood control and ensuring power generation during the peak summer has achieved great results, effectively defusing the invasion of typhoon and flood disasters, avoiding the occurrence of equipment accidents and power outages that may be caused by typhoon or flood disasters, and realizing the double harvest of safe flood control and power generation benefits. The main work is summarized as follows:

I. General situation of river basin water regime and reservoir operation

As of 20xx165438+1October 28th, the average rainfall in Gutianxi Basin was 20 19.7mm, which was 20.6% more than normal. The total runoff10.786 billion m3 is 30. 1% more than normal, and the abandoned water is 26 1. 1 100 million m3, which is a wet year. There are four major floods every year, with the peak discharge of the largest flood exceeding once every five years and the flood volume exceeding once every five years (see attached table 1 for monthly rainfall and runoff).

The water level of the first-class reservoir at the beginning of the year is 362.43m, which is 6. 1m lower than the average water level in the same period for many years. In the first quarter, the average rainfall and runoff in the basin were equivalent to normal values; In the second quarter, the rainfall was 44.5% more than normal, and the runoff was 48.7% more, of which the runoff in June was slightly more than twice that of normal. The rainfall in the third quarter is slightly lower than normal, but the runoff is 20.8% higher than normal. 10 to 1 1, the rainfall is 36.7% more than normal, and the runoff is 29.4% more than normal. The highest water level of the first-class reservoir this year is 381.78m.

Second, the main practices

1, establish rules and regulations, strengthen leadership, and ensure the implementation of flood control work from organization and publicity.

Strengthen leadership and implement the chief executive responsibility system.

At the beginning of this year, Gutian Xixi Hydropower Plant set up a flood control leading group and flood control office headed by the factory director, and set up a flood control command center and six flood control groups to ensure the smooth progress of flood control and emergency rescue work in the event of a major flood. Indeed, flood control has been organized, preventive measures have been implemented, emergency rescue has been able, and responsibilities have been implemented at all levels, ensuring the orderly development of flood control emergency rescue work.

Strengthen publicity and establish the flood prevention consciousness of "flood prevention work, everyone participates"

20xx 654381October 6th, an enlarged meeting of the factory safety committee was held to put forward requirements for safety production and flood control. All departments of the factory are required to overcome paralysis and luck, and earnestly implement the post responsibility system for flood control. At the same time, the factory magazines, newspapers, radio, factory MIS network and other media are used to publicize flood control knowledge and work, and timely report the implementation of flood control in all units of the factory.

According to the flood control law and the flood control characteristics of Gutian River basin over the years, before the flood season, a flood control knowledge brochure was distributed in the name of Gutian County Flood Control Office, and it was distributed to all towns and villages in the county through Gutian County Flood Control Work Conference. In order to help workers and surrounding villagers establish the flood prevention consciousness of "flood prevention work, everyone participates".

According to the characteristics of Gutianxi river basin and the actual situation of hydraulic structures, combined with the flood control experience in previous years, the Notice on Issuing Flood Control Work Arrangements for 20xx years was issued at the beginning of the year, and the arrangement and qualitative analysis of dam observation data for 20xx years were completed in 1 month, and the classification results of hydraulic structures of Gutianxi Hydropower Station and the brief analysis of flood interception of cascade dams for 20xx years were put forward. On this basis, according to the relevant design documents and technical specifications, the Gutianxi cascade reservoir 20xx is compiled.

2. Do a good job in flood control inspection and defect rectification to ensure the long-term operation of flood control work.

Make plans, strengthen inspections and implement rectification.

At the beginning of the year, the detailed rules for pre-flood inspection in 20xx years were formulated, and the deputy director of production led a team to conduct a comprehensive inspection of cascade hydropower stations, Qinshan hydropower stations, Zhouning hydropower stations, Shuangkoudu hydropower stations, reservoirs, dam workshops and other buildings and flood control facilities, as well as the implementation of flood control work in various units. The flood gates of the dam, its opening and closing system, standby power supply and flood gates of various power stations were tested. 3/kloc-0 defects were found in self-inspection, all of which were rectified before the flood season. On March 2-3 this year, the joint inspection team composed of Huadian Fujian Power Generation Co., Ltd. and the provincial power grid company inspected the flood control and 25 countermeasures of our factory. Put forward rectification suggestions 1 1, all of which have been rectified. In order to ensure the smooth communication of power stations at all levels more effectively, four satellite phones were added before the flood season.

Strengthen the investigation of downstream flood passage and upstream reservoir area.

The Gutianxi river basin covers an area of 1.325 square kilometers, and illegal reclamation often occurs in the basin with a reservoir edge area of tens of square kilometers. In order to strengthen the management of the reservoir and safeguard the interests of our factory, our factory insists on inspecting the river basin once every quarter. In March this year, together with Gutian County Flood Control Office, we conducted a comprehensive inspection of the first-class reservoir basin, and found and stopped two acts of reservoir reclamation. Before and during each rainfall and typhoon in flood season, the factory leaders organize relevant personnel to analyze meteorological trends and implement flood control work. During floods and rains, power stations at all levels will send more personnel to the site.

Summary of personal work in hydropower plant 3 Looking back on the work experience of the past year, it is still very fulfilling. The main work of the whole year is summarized as follows:

First, the main work performance:

1. By February 30th, 20XX, 12, the units in our station have been running safely for 4442 days. There is no interruption of safety day. During the inspection on March 26th, it was found that the circuit breaker at the outlet of # 1 unit 1DL was in contact with the copper bar of the current transformer, which caused the connector of the current transformer to turn red due to the high temperature, resulting in the shell burning. Because the defects were found in time, effective measures were taken to ensure the safety of 1 unit; In summer, two accidents occurred in Unit 2 of our station, and the shutdown accident caused by PLC. After analysis, the shutdown accident was caused by the equipment itself. After timely treatment, the unit resumed safe operation.

As our station is put into operation for the first year, I don't know much about the hydrological situation in Yujiang River Basin. During the flood season, we strengthened the hydrological contact with the upstream power station, timely understood the hydrological information, and mastered a series of hydrological data in the Yujiang River Basin. Reasonable reservoir operation in flood season, communication with the municipal dispatching center, and active contact with the municipal dispatching center to start and stop, ensured the rational utilization of water resources.

The communication quality of the staff of our station is reflected in the external contact, and the tone is humble and cordial, which effectively improves the work efficiency of the operators of our station. Before and after the flood season, the safety inspection in spring and autumn should be carried out seriously, and the problems should be rectified in time, so as to put an end to habitual violations in the work, thus effectively ensuring the safe production of the power station. In this year's work, there is no startup failure and startup timeout. Although there were some minor problems during the start-up, with the active cooperation and efforts of operation and maintenance personnel, the problems were solved in time, ensuring the smooth start-up and stop of the unit.

This year, many large-scale actions were carried out, and the "three stresses and one implementation" was strictly implemented in practical work. No misoperation occurred, ensuring the safety of personnel and equipment. In the daily work, under the organization and scheduling of the station leaders, the revision of the second edition of operating procedures was completed, and the study and discussion were organized, requiring that the patrol inspection be done carefully without leaving any dead ends; All operators have been trained to fill in the operation ticket and passed the examination, and completed the preliminary revision of the standard operation ticket of the power station. When executing the operation ticket, the procedures of self-examination, preliminary examination and review are strictly followed, ensuring the qualified rate of the standard operation ticket.

4. Each value must have an anti-accident drill and desktop deduction once a month. Some deficiencies appeared in the drill, which were corrected in time under the guidance of department leaders and specialized workers, from which we learned a lot of professional knowledge and accumulated rich experience in accident handling, thus avoiding the blindness in dealing with accidents in the future.

5. Carry out safety team activities at least four times a month, organize the study of relevant documents and technical measures of Datang International and its subsidiaries, earnestly adhere to the study of typical accident cases of Datang International, achieve "one case a week" and learn lessons from relevant safety accidents. In my daily training and study, I have carefully studied the documents and systems issued by the company. Conscientiously implement the spirit of the document, actively participate in and carry out the "three major projects", "create a team with zero violations", "double increase and double festivals" and "three stresses and one implementation", and all activities have achieved good results. So far, the implementation of the "three stresses and one implementation" is very good, and there is no violation of discipline.

6. During this year, actively participate in various business skills activities organized by the company, "self-supporting posts, first-class benchmarks", find gaps in competition and find promotion in competition. Actively participate in the company's rationalization proposals, open source and reduce expenditure, double increase and double section, do your duty, and strive to achieve the company's profit target.

7. During the unit's one-year inspection and maintenance work, seriously respond to the company's maintenance tenet of "strong repair is necessary, good repair is necessary". Actively cooperate with maintenance personnel to carry out C-level maintenance on #2 and #3 units. In the process of maintenance, we have a new understanding of the equipment and are more fully familiar with its characteristics.

Second, the main problems and shortcomings:

1, safety is the lifeline of production. Safety is simple and easy to understand, which is related to the happiness of one's family. The safety awareness of class members needs to be further strengthened, which requires not only the supervision, reminder and supervision of leaders, but also the self-awareness in daily work and life. Really "safety is in my heart", not just talk about it.

2. There is no initiative in the learning process, and theoretical knowledge needs to be further improved, especially the level of accident judgment and handling needs to be improved. This requires subjective initiative, and everyone participates in learning and improves their self-requirements, rather than learning to cope with the supervision and inspection of leaders.

3. "Three stresses and one implementation" is a long-term work content, and the three stresses are practical things that are effectively implemented in the work, and cannot stay on the surface. Standardization of patrol inspection and switching operation are the direction of efforts.

4, double increase and double section, open source and reduce expenditure. It is necessary for all staff to have a sense of saving, especially the control of auxiliary power. In the case of no power generation at night, it is necessary to turn on the wall lamp of the factory building to save auxiliary power, maintain high water level for power generation and reduce water consumption rate.

Third, the future direction and work plan:

1. Continue to implement the policy of "safety first, prevention first and comprehensive treatment", and strive to achieve the annual production safety goal of 20XX.

2, actively cooperate with various departments to focus on the following work:

(1) spring and autumn safety inspection;

(2) Do a good job in flood control and flood control during flood season;

3. Continue to strengthen personnel technical training, focusing on how to achieve good training results and strive to significantly improve everyone's comprehensive professional quality. And ask each value to make a study plan for the next month before the 25th of each month.

4. Strengthen communication with departments, report and solve problems in a timely manner, do not accumulate and intensify problems, and pay attention to the improvement of personal cultivation.

5. Seriously standardize all kinds of ledgers and records.

6. Strengthen the practical work of saving resources, strive for good results in 20XX years, and improve the KPI value of all employees.

For a long time, power system accidents have caused huge personal and equipment losses and caused huge economic losses. Therefore, operators should always put safety first. While ensuring the normal operation of the unit, timely organize everyone to learn safety-related knowledge such as safety work regulations of the power industry, safety documents issued by the group company, safety briefings, etc., enhance safety awareness, ensure safe and civilized production of this station, carefully patrol equipment during work, report and handle problems in time, ensure the safe and stable operation of equipment, and strive to achieve various goals in 20XX.

Adhere to the basic policy of "safety first, prevention first and comprehensive treatment" in the work, further implement the responsibilities, do a good job of inspection, and actively explore the establishment of a long-term mechanism for safe production. Complete all safety production indicators issued by our station, resolutely curb the occurrence of serious accidents, control the development of minor accidents, maintain the stable development of the safety production situation, and push the work of each team to a new level.

Summary of Personal Work in Hydropower Plant 4 With the concerted efforts of all the staff of our department, Qi Xin kept pace with the times, constantly summed up experiences and lessons, strengthened management innovation, strengthened safety target management, strengthened safety education and safety technical training, strictly implemented "two votes and three systems", effectively carried out risk point analysis activities, strengthened safety mutual protection, strengthened on-site management, adhered to "three noes", actively carried out safety evaluation and various safety inspections, and strictly implemented various rectification tasks.

First, strengthen management innovation, strengthen safety target management and effectively implement three-level control.

Our department has strengthened management innovation, and issued "xx Worker Assessment Method" and "Detailed Rules for Occupational Management Assessment", which regularly assess employees' safety quality and occupational safety management, effectively promoting the improvement of employees' safety quality and strengthening occupational safety management, further standardizing employees' work behavior and consolidating the safety foundation of our department.

At the beginning of the year, according to the safety objectives issued by the company, on the basis of summing up last year's safety work experience, in strict accordance with the requirements of "three-level control", combined with the actual situation of our department, our department carefully formulated the annual safety objectives and their guarantee measures and the "risk of mortgage Assessment Method for Safety Production". Taking safety target management as a major event, at the beginning of the year, our department decomposed the safety target indicators into majors and teams. Each class has also formulated the goal of security struggle and its guarantee measures, which are carefully reviewed by our department to make the measures concrete and operable. Our department pays close attention to the formulation of objectives and guarantee measures of departments and safety teams, strengthens the implementation of guarantee measures, strengthens the safety management of majors and teams, and strictly assesses safety objectives and rewards to ensure the realization of safety objectives.

Second, strengthen safety education, improve safety quality, strengthen safety technical training, and lay a solid foundation for safety.

According to the professional characteristics of each class, our department organized teams and groups to carry out a wealth of safety education activities, and carried out various safety activities according to the production situation to ensure the quality of safety activities.

Fully understand the meaning of "safety lies in the team and the key lies in the workshop". At the beginning of the year, based on the principle of "what is lacking, what is supplemented", our department and the safety team carefully organized and formulated the education and training work plan, and earnestly organized and implemented it, striving to improve the safety technical level of all employees. Qi Xin made concerted efforts to strengthen the pre-shift and post-shift meetings, strive to improve the quality of safety activities, pay close attention to implementation, effectively improve the safety quality of all staff, and constantly lay a solid foundation for safety.

For the accident report issued by the superior, our department organizes relevant full-time and safety officers to learn first, and puts forward targeted accident lessons and countermeasures, which are read and approved by the department leaders before being distributed to the team. After the team members learn and put forward their learning experience, the monitor combines the requirements of the superiors and the learning experience of the team members to formulate the lessons to be learned and specific countermeasures, which are organized and implemented by the team members. Finally, our department organizes to check the learning of accident reports and the implementation of anti-accident measures to ensure that.

In the safety month activities, each class made a specific study plan for the learning material "The Alarm Bell Rings" issued by the superior, and learned a good lesson and received a good learning effect. After the promulgation of the Law on Safety in Production, our department organized teams and managers at all levels to study, and the teams and groups formulated specific study plans, which further enhanced the legal awareness of safety in production of personnel at all levels.

Three, strengthen the management of working tickets and equipment defects and regular work, and effectively carry out dangerous point analysis activities. work summary

Our department strictly recognizes the qualifications of the working ticket issuer and the person in charge of the work, strengthens the process management of the implementation of the working ticket and the dangerous point pre-control list, strengthens the inspection of the implementation of the working ticket system, and strictly implements the working ticket and its error-free assessment methods and defect management systems and rules. Strengthen the management and assessment of working tickets to ensure that the qualified rate of working tickets is above 99%. Adhere to the weekly analysis of equipment defects and strengthen the management of equipment defects, and the elimination rate of equipment defects in our department is above 97% throughout the year; By improving and strengthening the regular work of equipment and strengthening the reliability analysis and evaluation of equipment, the elimination rate of equipment defects, the reliability and health level of equipment are effectively improved, the hidden dangers of accidents are eliminated in the bud, and the safe operation of equipment is ensured.

My department always regards the pre-control of dangerous points in xx work as a major event to further standardize the analysis of dangerous points. At ordinary times, the field xx work mainly adopts the form of dangerous point pre-control list to reflect the dangerous point analysis activities; A lot of work of unit mediation is mainly to organize relevant meetings and analyze the dangerous points of majors and teams in the form of safety disclosure; In addition to organizing relevant meetings, especially dangerous emergency repairs, we also organize the formulation and implementation of "three measures" to ensure the safety of emergency repairs; The main work of unit overhaul is to check the dangerous points in advance, and then organize the formulation of targeted "three measures". Our department will ensure the safety in the process of xx work by paying close attention to the implementation of relevant safety work requirements and various measures, and make the dangerous points of xx maintenance work in a controllable and controlled state.

Fourth, give play to the role of safety net, strengthen safety mutual protection, strengthen on-site safety management, resolutely oppose habitual violations, and ensure the safe and smooth maintenance of the unit.

At ordinary times, the safety network team of our department regularly goes to the site to ban violations and strengthen the safety management of the production site. For the violations found, we will strictly implement the management method of violation scoring of our department, assess and score the violators in strict accordance with the regulations, and strictly conduct professional safety management assessment. During the overhaul of the unit, our department specially set up a safety inspection team to check the safety production situation at the site every day and strengthen the safety management at the production site. In the field work, the inspection of the development of safety and mutual insurance has been strengthened. Up to now, all eight teams and groups in our department have obtained small red flags, and the safety mutual protection activities have effectively promoted and guaranteed safe production.

Summary of personal work in hydropower plant 5 In the busy time, we are about to experience a touching and strong XX year. For me personally, this has been a fruitful year.

In this year, I experienced the same feelings, farewell, harvest, gratitude and efforts as everyone else. My life and work have made me re-examine my previous attitude and way of doing things, and I have grown up. Especially after taking part in the work, with the support and help of leaders and colleagues, I benefited a lot from the exercise I got in all aspects. Here, I must sincerely express my deep gratitude to all leaders and colleagues for their tolerance, encouragement and help during this time. The following is a brief review and summary of my thoughts and work study since I joined the work.

First, the transformation and promotion of ideology.

I just left the campus and have no work experience. I didn't take part in professional training at the beginning of my work. Although a lot of professional knowledge appeals to me, it is still very strange. Compared with other colleagues, I know there is a big gap. And I also know that one of my biggest shortcomings is impatience and carelessness. Many things are done too fast, which leads to many mistakes. In addition, although I am in the production department, there are many things I can't do. So with these worries, the excitement when I first came was gradually replaced by pressure, and I always felt guilty and blamed myself. With everyone's help and self-study, I gradually entered the working state, my anxiety and nervousness gradually calmed down, and I also had the confidence and determination to do a good job.

Second, the review and summary of work and study

I was deeply impressed by the series of safety education and training given to us by the old employees when they first entered the factory. Because ignoring any small hidden danger may lead to a big accident in the future. Although I am not engaged in technical and operational work, the relative risk of my work is relatively small, but in my usual work, I always keep in mind the policy of "safety first, prevention first" and learn from the old employees, so that my personal awareness of safety in production can be continuously improved and enhanced, and I should make my due efforts to realize the company's accident-free throughout the year.

Probation is the main stage of study, so when I first came to the company, I spent more time on duty with my colleagues in the main control room. Through their careful explanation, I also learned a lot about the work involved in duty and the professional knowledge of substation equipment.

The work on duty seems the same, but patience and carefulness are indispensable, which I have not done enough. In this respect, the original learning foundation is not solid. As time goes by, the workload increases, and there is almost no time to finish the whole day's duty work. In addition, personal learning initiative is not strong, so many faults can't be remembered, and I can't skillfully complete the operation steps on duty. I should strengthen my professional study in my future work.

Making a monthly report at the end of the month is the first task I received. Although I have done most of my work by myself through these months of continuous study, I still feel nervous in the face of huge data, because there is a world of difference between one more zero and one less zero. But the more impatient you are, the more likely you are to make mistakes. The psychology of wanting to finish the work quickly is also the reason for frequent calculation errors. In the annual summary, I once again mentioned the problems I mentioned in the internship summary. I really feel embarrassed and guilty. In the future work, I will continue to learn from the old employees, be serious and responsible, guard against arrogance and rashness, especially in the statistics of data, and carefully check it, even if it is calculated again, to ensure its correctness.

As a librarian and my colleagues, I finished sorting, cataloging, binding, supplementing, replacing tools and labels, and inputting them into a microcomputer in order to meet the autumn inspection work of the head office. Although I worked hard during the period, I had to admit that my work was not in place and my quality was not high in the face of facts. This is directly related to my lack of detailed, solid and sufficient understanding of the documents and materials in the reference room. In the future, I will correct my attitude towards the work of the reference room, take it seriously and enhance my initiative. By becoming more familiar with all kinds of documents and materials, the archival work will be brought into the standardized and refined track required by the company, which is also convenient for colleagues to consult.

In addition, it is also one of my main tasks to cooperate with my colleagues and conscientiously complete the assigned tasks. Although the work is trivial, I will still treat it with a positive attitude and try my best to finish it.

Iii. Existing shortcomings and future efforts

After three months of work, I found myself with many shortcomings and deficiencies. For example, there is little communication with colleagues, lack of initiative in study and work, lack of thinking in work, and lack of attention to summary, especially in work, which is easy to be impatient, and many things are immature and cannot be coordinated. These are the main reasons that lead to work mistakes and trouble for colleagues. In the future work, we should not only obey the arrangement of leaders at all levels as always, but also learn from the earnest attitude and strong sense of responsibility of leaders and colleagues, strengthen communication with colleagues, increase our knowledge through continuous study and summary, gradually strengthen and enrich our business knowledge, and strive to improve our work level, so as to do every job well. At the same time, we should strengthen personal cultivation, correct our own behavior and consciously strengthen our study. I also hope that everyone can correct and criticize my bad work in time, and I accept and correct it humbly.

;