Manufacturing technology of ancient hexagonal gazebo

The production process of the ancient hexagonal pavilion is as follows:

1. Pre-preparation: determine the scheme, the design unit will draw the design drawings, conduct detailed exploration on the construction site, purchase materials as planned, and prepare for anticorrosion and air drying.

2. On-site setting-out: together with the person in charge of Party A, set out at the designated place according to the construction drawing. The setting-out size is the final size of the exhibition hall, and the size of the concrete foundation should not be confused. Lay boundary markers with 30 cm battens, pull up the construction line, evenly spread white lime, and pay attention to distinguish the signs of piles, such as steps and the starting point of piles.

Three. Foundation and construction foundation Foundation construction is generally carried out according to the purpose of the exhibition hall and Party A's construction requirements, and is divided into concrete foundation and wooden pile foundation. Generally, in public places where people flow a lot and use for a long time, the foundation is built with concrete to ensure the service life. In the courtyard of a private villa, the flow of people is small and the use time is short. Considering the construction cost, wooden pile foundation can be used.

Four, pavilion body (roof truss) production

1. Installed balcony

The installation of finished products is to transport prefabricated wood members to the site for installation, so as to ensure that the parts will not be damaged during transportation and handling. During field installation, the labels and screws corresponding to each part should be matched strictly according to the factory drawings, and the connection with the foundation must be fixed according to the requirements of the drawings. In order to ensure the correctness and stability of the building frame, technicians are required to measure and correct it at any time, and the installation sequence is from inside to outside and from top to bottom.

2, with anticorrosive wood whole material specifications on-site processing and production.

When purchasing materials, we should try our best to avoid excessive waste according to the size of the exhibition hall, and ensure the quality of the purchased anticorrosive wood materials, which shall not be distorted, deformed or cracked. Materials should be completely antiseptic and dry.

Verb (abbreviation of verb) roof construction of the exhibition hall: the roof frame of the exhibition hall belongs to big wood, and the components of the finished exhibition hall can only be installed according to the drawings. If the material is processed on site, attention should be paid to the construction sequence of each floor structure and the installation sequence of roof, main beam, cross beam, roof, panel and waterproof material. There are many materials on the top of the pavilion. According to different styles, there are commonly used anti-corrosion wood laminates, asphalt shingles and waterproof materials.

6. Pavilion decoration: After the overall framework of the pavilion is completed, different accessories can be installed according to the function and placement position of the pavilion. If the pavilion is mainly used for rest, you can sit in two or three long chairs with beautiful women next to you, which can play a very good role in enjoying the cool and sheltering from the rain. If it is mainly for viewing, you can do some decorations on the pavilion according to the surrounding environment, such as antique carving, or decorative grids, pendants and so on.