Joke Collection Website - Bulletin headlines - 218 builder annual work summary

218 builder annual work summary

It's the end of the year. Friend, who are annual work summary, the builder? The following is the "annual work summary, 218 Building Builder" carefully compiled by me for your reference only. Welcome to read it. Friend, please pay attention, more builders annual work summary are here. Annual work summary, a builder in 218

In a blink of an eye, I will leave in 218. I have been working in the company for more than a year, and I have been struggling in the front line of construction. In the long-term work, I have developed a hard-working habit. I love construction management, make positive progress in my work, and strive to study the construction technology of construction projects. I have successively undertaken the xx distribution center project with a construction area of 35, square meters. This project was awarded the title of "Excellent Construction Site with Provincial Safety and Civilization", residential building projects of No.35 and No.36 of xxx Institute of Technology, and the title of "Excellent Construction Site with Provincial Safety and Civilization", and areas C and D of xx Cultural Street. This project is a group project and a residential building project of No.9 in xx Garden, with a construction area of 5521㎡. This project was awarded the title of "Excellent Construction Site with Provincial Safety and Civilization" and the project of xxx Garden Community.

as a builder who has worked for many years, I have been constantly enriching my professional knowledge, and with a pragmatic and down-to-earth working attitude, I have explored in practice, actively developed and innovated in experience, and constantly improved my working ability. At the same time when many projects were completed, I also improved myself and achieved myself to some extent. Now, I have summed up a series of my own growth and shortcomings, hoping to face the work with a newer and stronger look in the future.

1. Carrying out post responsibilities

As a manager of the project department, I attach importance to controlling the construction quality of the project, coordinating with the construction unit and supervision unit, coordinating the management of the team, automatically cooperating with the safety department to complete various safety management work, and paying close attention to material management to save the project cost. The following aspects are important to clarify:

1. Project quality management

requires every construction project with high standards and a high starting point. In the early stage of construction, pay attention to the technical disclosure of the team, pay attention to the team members ideologically, and know the quality, progress and safety requirements of the project technically, so as to lay a good foundation for the later construction.

2. Management and coordination of teams and groups

We attach importance to the training of each team leader. At every meeting, I try to make each comrade take the leading position at least once in view of the problems existing in construction cooperation, so as to increase their experience, enable each comrade to be independent and deal with various problems, and improve the overall level of business skills of all teams and groups.

3. Safety management

In the process of work, it is an inseparable part of every project management to automatically cooperate with the Safety Section to complete the safety management and education of construction personnel.

4. Coordination with the construction unit and supervision unit

As a construction manager, it is the best embodiment of the continuous progress of the builder's work to pay attention to the coordination with the construction unit and supervision unit in each project, take the lead in studying and implementing the good suggestions put forward by the construction unit and supervision unit, and strive to obtain unanimous praise from the construction unit and supervision unit.

5. Technical management

The requirements for construction technology are more stringent. We must carefully study the construction drawings and construction specifications to ensure the construction quality. At the same time, we should record the construction key points, construction methods and punishment regulations so as not to miss anything in the technical disclosure, and try to anticipate and solve them in advance. In view of some key problems, we must put forward specific requirements to the construction team at the beginning of each stage of construction. Pay special attention to the seriousness of the problem and patiently explain to them the requirements in the specification

2. Problems existing in the work

1. On its own, sometimes it is not comprehensive enough to consider the problem, blindly listen to the opinions of the construction team and draw conclusions without making a clearer and detailed analysis of the incident, thus causing unnecessary losses. In management, there is no severe punishment for the teams who don't listen to the instructions and do not follow the requirements. Over time, individual construction teams will have a lucky attitude, so that management is out of control in the later management work, which makes it difficult to arrange the work and manage the site. In the future management work, we must first make clear our position, give full play to the leading role of project managers in the construction site, make clear the rewards and punishments for the construction teams, form a leadership method with the project department as the center, and never be soft with those construction teams who don't listen to the command, and implement strict crackdown and strict grasp to establish the construction prestige.

2. In terms of construction technology, there are still shortcomings due to construction experience. In the construction site, we can't find out the problems in the construction accurately and quickly, and we can't use the construction drawings and construction specifications flexibly and skillfully, which makes the actual construction process and theoretical construction derailed, that is, we can't achieve the expected construction effect and make the construction procedure complicated, thus increasing the construction cost. This teaches me that we must not do whatever we want in the future construction process, and we must be familiar with the construction drawings and construction specifications carefully and master them well, so as to better apply the construction specifications to the site construction.

Third, the future work plan

By summing up the past work, we can find out the shortcomings in the work so as to overcome them in the future work. At the same time, we need to read more books, study well the norms and regulations and relevant documents, master professional knowledge, improve our work ability, strengthen our sense of responsibility and do our personal work well in time.

in short, in the future work, I will constantly sum up and reflect, constantly push myself and enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises, and make progress and grow with my favorite construction career. 218 builder annual work summary II

My name is xx, and I have been engaged in construction survey since I graduated from work in 2xx. In the two years since I joined the work, I have gradually become mature from the immaturity I just graduated, and made great progress in my work, study and thought. With the help of company leaders and colleagues, my work and life have made a new start, and I have gradually mastered professional skills, which has given me a skill and pointed out the direction for my future life goals. Let me experience the warmth and care of this big family in my work and life, and learn how to cooperate with people around me in order to achieve the same goal, and how to help newly graduated students adapt to the construction site environment in life and work. In order to better complete the tasks in 218, I will summarize my work, study and thoughts in 218 as follows:

1. Work

I was engaged in surveying in 218. During this year, I kept learning the professional knowledge of measurement and combined theory with practice. With the help of the project leaders and colleagues in the second bid section of xx Mansion, the work situation was quickly opened, and at the same time, the coordinate lofting of building construction, the compilation and lofting of subgrade coordinates and elevation procedures were also learned. The coordinates and dimensions of each structure in the project are repeatedly calculated and verified, which ensures the accuracy of construction lofting, timely communicates with survey supervision, site supervision and site construction director, and ensures the construction progress and quality.

for each working procedure, our surveyors have set out before work, tested during work and re-measured after work. When problems are found, they can respond in time and solve them in time. If they don't understand, they can ask the old workers or leaders who are not sure, and then set out or tell the construction team technicians after they understand, which reduces the unnecessary waste of engineering materials and reduces the engineering cost. Measurement runs through the whole project construction, and it is inseparable from any place in the construction. If the surveyors are not serious and responsible in their work and have no rigorous work attitude, they will cause irreparable losses to the project. Especially in the construction lofting and inspection of the second bid section of xx Mansion, I deeply realized the importance of surveyors to the construction.

Second, the ideological aspect

At work, I sometimes feel confused and afraid of the unknown. I don't know how to face it, and I'm always afraid of doing something wrong. Every time I have such an idea, I always tell myself: "I will eliminate all difficulties and setbacks, and I will face everything bravely, no matter right or wrong." But at the same time, I will constantly ask and find solutions to difficulties, always do all the preparatory work well before work, and constantly ask people around me for proof to reduce and avoid my mistakes. Always adjust your mood, so that you can maintain a good working attitude at work and work and live with a positive and optimistic attitude.

third, do a good job of "passing, helping and bringing"

The work of passing, helping and bringing has always been a fine tradition of our company and an important advanced concept of cultivating talents and technical backbones. Since I graduated to work in the company, I have been helped by the old employees of the company. They taught me their work experience and technical skills, and helped us solve all kinds of problems encountered in life, work and study. They played a very good leading role in our work and set an example for us to learn.

Therefore, I should continue this tradition. I will tell the newly graduated students what I know without reservation, and help them to enter their work roles as soon as possible, so that they can adapt to the environment as soon as possible and independently complete various tasks assigned by the leaders. At the same time, I will continue to learn all kinds of knowledge to enrich myself, help and help my colleagues, constantly strengthen my ideological quality, care for others, and try my best to help colleagues in trouble in life and work. Drive them with positive work enthusiasm, influence them, and play a positive and good leading role. Annual work summary III, a builder in 218

In a blink of an eye, 218 will pass. In order to better carry out the work in the future, I will summarize the work in the past year as follows:

1. Fulfilling my job responsibilities

As the manager of the project department and the chief building number of No.7 single building, I pay attention to controlling the construction quality of the project, coordinating with the construction unit and supervision unit, and coordinating the management of the team and actively cooperating with safety. Mainly explained in the following aspects:

1. Project quality management

The project quality of xx Huafu Project requires high standards and a high starting point. In the early stage of construction, pay attention to the technical disclosure of the team, pay attention to the team members ideologically, and technically understand the quality, progress and safety requirements of the project, so as to lay a good foundation for the later construction. I have been adhering to the tenet of "Quality is the rice bowl of today and the signboard of tomorrow". During the construction of building 7#, I strictly require the carpenters, steel workers and masons to construct according to the drawings, so as to ensure the quality of steel bars, templates and concrete in the construction process, and welcome valuable opinions from other monomer teams. This measure has achieved good results. It also lays a good foundation for the later construction to be completed on schedule, reaching the acceptance of the supervision unit, all passed, and won the praise of the construction unit and supervision unit.

2. Management and coordination of teams and groups

(1) The construction manager is the most basic manager in the institute, both a commander and a combatant, a manifestation of the leadership's will and opinions, and a feedback of grassroots problems. Therefore, it is even more necessary to establish a good self-image, become a role model for colleagues in work, and become a trusted partner of colleagues emotionally. We are required to work overtime and be the first to arrive, and we are required to set high-quality standards. Therefore, I have participated in all the hidden projects, paying attention to process control and controlling some common quality defects in the bud.

(2) Caring for colleagues: When colleagues have something to do, take the initiative to help cover for the class and organize the whole class to care for and sympathize with each other, thus forming a big family atmosphere. Enthusiastically coordinate the contradictions among team leaders, workers and builders.

(3) Pay attention to the training of four single building numbers. At each meeting, in view of the problems existing in construction cooperation, I try to make each comrade take the leading position at least once to increase his experience, so that each comrade can be independent and deal with various problems, and the business and technical level of the whole team has been improved as a whole.

4. Safety management

In the course of work, we actively cooperated with the Security Department to complete the safety management and education of the construction personnel, and achieved excellent results in several inspections by the construction unit. In the fourth quarter of safety inspection, 1# was identified as the safety management demonstration monomer of this project.

2. Work experience in the past year

1. Maintain a good attitude and a positive attitude towards work. As a member of xx, I consciously abide by the company's rules and regulations and obey the work arrangements of the superior leaders; With absolute loyalty to the company, I will devote myself to all the work, treat the company's affairs as my own family's affairs, and actively think about the on-site construction management and coordination according to the actual situation on the spot, instead of waiting for the leaders to arrange them. Invest in all work with the attitude of being a master, and safeguard the company's image and interests from being damaged.

2. integrate yourself into the large group of the company and rely on the wisdom and strength of the group to complete all the work. In many of the work I have completed this year, I have received support and help from leaders and colleagues at all levels.

3. Through one year's work, I found that I still have many shortcomings: I didn't have enough management in dealing with on-site matters at work; I haven't been too careful in dealing with these problems, and I will pay more attention to overcoming them in the new XX year.

218 is a year of exploration, learning and progress for me. Faced with different work contents, I put my mind right, give full play to my supervisor's initiative and think actively. In such a year, I enriched myself through my own labor and broadened my horizons through the opportunities given to me by my leaders.

spring breeze, spring rain and brilliant spring are a new starting point for the new year. 218 is the year of reform, innovation and endeavor of our xx Construction Co., Ltd. in xx construction industry. The new journey has indicated that a new battle has begun. The blueprint has been drawn, and the drums have sounded. Hangjian Tiejun will live up to its mission, compose a new chapter, and create a better tomorrow for xx Company. Annual work summary IV

, a builder in 218, as the on-site staff of the Project Department sent by the Engineering Department, my work objectives and tasks are: wholeheartedly provide quality services for Party A and the Project Department, supervise safe and civilized production, project quality and project progress, prevent risks, and contact the company in time to minimize enterprise risks.

at the beginning of the year, I was sent to work in xx-xxx-xxx project department, which is a strip park with a total length of about xx-x kilometers from xx-xx road in the west to xx-xx in the east. Because the project is located in xx Road, adjacent to xx Park in the west, and there are many tourists and pedestrians on the road, the focus of the project is on safe and civilized production. After I went to the project department, according to the company's guidelines, requirements and the objectives and tasks issued by the engineering department, combined with the specific situation of the project department, I started from the following