Working methods of project supervision-civilized construction and safety control

1, strengthen management and establish a sound management system.

1) Organize a reliable organizational guarantee system for civilized construction and safety management in supervision, establish a management idea of full staff, comprehensiveness and whole process, and introduce civilized construction and safety control into normal supervision work. Therefore, civilized construction and safety control supervision team must be established in engineering supervision. The director concurrently serves as the team leader, the representative of the director is the deputy team leader, and the rest of the supervision engineers and supervisors are the team members, which are implemented layer by layer.

2) Review the compilation of civilized construction and safety control measures in the contractor's construction organization design, urge the contractor to establish and improve the post responsibility system for civilized construction and safety control, check the specific implementation of organizational measures and technical measures, and conduct regular inspection and assessment.

2. Strictly implement the contents and measures of civilized construction.

1) Fences or retaining walls must be set up on the site as required to ensure fully enclosed construction; Construction permit must be hung on site; Hang safety signs at entrances and exits and dangerous operations.

2) Arrange the site according to the construction plane, complete and tidy charts, slogans and banners, and tidy sundries; Wire drawing conforms to the specifications; Smooth roads and drainage; The floor is clean and tidy, without overload.

3) Materials, finished products, semi-finished products and mechanical equipment shall be neatly stacked as required, and their positions shall be consistent with the construction plane; Construction machinery must go through safety inspection when entering the site; Construction machines and tools such as mixers and hoists shall be provided with temporary operation sheds; Construction machines and tools should be cleaned up and put into storage in time after use; Operators should hold relevant certificates.

4) Site environmental sanitation, including dust and noise, toilet, canteen and drinking water sanitation, pest control measures, construction and domestic garbage disposal, etc., shall meet the evaluation standards as required.

5) Strengthen public security, implement the civilized construction education system, strengthen the protection of finished products of completed projects, and strengthen the management of staff quarters.

6) Strengthen fire control measures and open flame management measures. Dormitories, sheds, kitchens and warehouses should be equipped with fire extinguishers, and fire hoses and accessories should be provided on site. The procurement and storage of inflammable and explosive articles shall be handled in accordance with regulations.

3. Strictly implement safety management measures.

1) Establish a safety responsibility system, formulate safety production indicators, strengthen safety education at all levels, and improve safety measures in construction organization design. All divisions (sub-divisions) should have written and oral technical disclosure, all workers should receive safety training, and special types of work should have work certificates.

2) Adhere to the irregular safety inspection system, establish pre-shift safety activities and make records; Do a good job in the investigation, analysis, report and filing of industrial accidents; Set up safety slogans and safety color codes at the site as required; Large components and materials should be neatly stacked as required, and the construction roads should be smooth.

3) "Three treasures" and "four mouths" protection, that is, the wearing settings of safety helmet, safety net and safety belt should be strict; Doors, guardrails, protective cover plates, protective sheds and border protection must be set in accordance with the protection regulations for stairs, elevators, reserved holes, pits, entrances, balconies, floors and roofs.

4) The materials and binding methods of scaffolding materials must meet the requirements, such as vertical pole foundation, protective railing, skirting board, set net, scaffolding, shear brace, large and small cross bars, ramps, etc. Should be set correctly. It is not allowed to use steel-wood mixed scaffolding or steel-bamboo mixed scaffolding or single bent scaffolding, and safety education should be strengthened during erection and use.

5) Construction electricity should meet the standards, and the distance and protection between the project and nearby high-voltage lines should meet the requirements; Branch line erection, low-voltage trunk line erection, switch box setting, electric fuse installation and selection should meet the standards.

6) For the erection of gantry, each floor should have sensitive braking and stopping devices, superelevation and limit devices, and the materials and installation methods of cable wind rope and steel wire rope should meet the standards; The landing unloading platform should be equipped with protective fences and doors, and the hanging plate should have safety buckles; Frame and transmission system, feed inlet protection, upper and lower communication signals, hoist operation shed, lightning protection, etc. Installation shall be carried out according to standards.

7) Protection and use of various construction machines and tools, such as chainsaws, planers, hand-held power tools, reinforcing machinery, electric welding machines, mixers, acetylene generators, gas cylinders, submersible pumps, etc. , should meet the requirements and standards of laws and regulations.