Responsibility book for engineering subcontracting safety

Responsibility Letter for Project Subcontracting Safety (6 selected articles)

Nowadays, the frequency of using responsibility books is increasing gradually. The responsibility book is a parallel document that specifies the scope and responsibility. How should the responsibility book be drafted? The following is my carefully compiled responsibility book for project subcontracting safety (selected 6 articles), which is welcome for your reference and I hope it will help you.

Responsibility Letter for Project Subcontracting Safety 1 In order to further strengthen the work of safety in production, prevent and reduce the occurrence of various production safety accidents, ensure the safety of life and property of construction workers, and promote the fundamental improvement of the construction safety situation in our city, this responsibility letter is formulated in accordance with the Law of People's Republic of China (PRC) on Safety in Production. "Regulations on the Administration of Work Safety in Construction Projects" and "Regulations on Work Safety License", combined with the actual safety management of the construction industry in our city.

First, the object of responsibility

The project manager is the first person responsible for the project safety production, and takes full responsibility for the project safety production. Safety production management personnel are responsible for the safety of the construction site, and are specifically responsible for the daily supervision and inspection of on-site safety production.

Second, the responsibility goal

1. Conscientiously implement the safety production guidelines and policies of "safety first, prevention first and comprehensive treatment" and various laws, regulations and standards on safety production.

2. Seriously implement the safety technical measures in the construction organization design of this project; Organize the preparation and improvement of major hazard control measures and emergency plans for production accidents of this project.

3. Strictly implement the requirements of "five simultaneities". While planning, arranging, inspecting, summarizing and evaluating the production work of the project, it is necessary to plan, arrange, inspect, summarize and evaluate the safety production work.

4. Strictly implement the construction safety inspection standards, technical regulations for safety protection facilities on the construction site and regulations on the management of production safety on the construction site, strengthen the management of production safety on the construction site, improve the quality of safety protection, and ensure that protection comes before construction. The qualified rate of various safety scores on the construction site is 100%.

5. The Project Department shall set up a safety management organization or be equipped with full-time safety production management personnel according to the project scale. The person in charge of the project leads and organizes regular, special and seasonal safety inspections on the construction site, supports the work of the on-site safety officer, and organizes measures to timely rectify the hidden dangers in the construction process. Consciously accept the supervision and inspection of the industry management department, and rectify the problems in safety production and management raised by the superiors according to the requirements of time, personnel and measures.

6, the implementation of the provisions of the national employment management, strict management system of certificates, carefully organize all kinds of pre-job safety education and training, and make records. Actively handle accident insurance for construction personnel. If the project is subcontracted, it is necessary to clarify their respective responsibilities for production safety and prevent it from being managed by the package.

7. When making the project cost plan, it is necessary to ensure the input and effective use of safety production expenses, and establish a safety production input account.

8. When an accident occurs, it is necessary to start the emergency rescue plan urgently, do a good job in personnel rescue and on-site protection, take effective measures to prevent the accident from expanding, and report, organize and cooperate with the accident investigation in time.

Third, create goals.

Goal: Safe and civilized construction site is qualified.

Fourth, reward and punishment conditions

During the construction of the project, the Municipal Safety Supervision Station will regularly or irregularly organize inspection (patrol) on the implementation of the responsibility objectives and the completion of the indicators of this responsibility book, and the inspection results will serve as an important basis for the assessment of the project and the project manager.

The completion safety evaluation of this project is excellent. When the project manager undertakes the next project, the risk of safety production mortgage will be reduced by 60%, and the insurance rate of construction accident injury will be reduced to 1.5‰.

If the requirements in paragraphs 4 and 5 of this responsibility target are not implemented, or there are major safety hazards, and the rectification is refused or incomplete, 654.38+00,000 yuan of safety production risk of mortgage will be deducted each time and transferred to the safety production risk fund. In case of A-level safety accident, in addition to being punished according to relevant laws and regulations, the risk of mortgage paid by him will be fully deducted and transferred to the safety production risk fund. During the construction period, there was no level safety accident, and the safety verification in each construction stage reached the qualified standard. After the project is completed, the safety production risk of mortgage will be returned in full at one time.

Signature of the representative of the person in charge:

Signature of project manager:

Signature of safety supervisor:

Signature of full-time project safety officer:

20XX year x month x day

Responsibility Letter for Project Subcontracting Safety 2 In order to protect the safety and health of construction personnel, prevent casualties and clarify the responsibilities of all parties, this responsibility letter is formulated according to the Construction Law of People's Republic of China (PRC), the Safety Production Law of People's Republic of China (PRC) and other relevant laws and regulations.

1. The general contractor and subcontractors shall abide by the laws, regulations and provisions of the state and the unit on safety production, and conscientiously implement the safety technical standards of the state, industry and enterprises.

Second, adhere to the principle of safety first and prevention first, and do not operate illegally. When organizing construction production, we must first implement safety technical measures to prevent accidents.

Three, pay special attention to safety education, serious safety discipline, standardize safety behavior, and prohibit barbaric construction.

Four, the subcontractor shall perform the following duties:

1, responsible for the safety management of construction personnel in the construction site of this unit, equipped with special safety production management personnel, clear the responsible person, check the safety production situation at any time, and make records.

2, welding and other special operations personnel should hold relevant certificates, and adhere to the system of on-site inspection and acceptance, prohibit non-special operations personnel engaged in special operations.

3. Before the construction personnel enter the site, they should organize to study the laws and regulations on safety production and safety technical disclosure, so as to give priority to prevention.

4. It is forbidden to store inflammable and explosive articles on the construction site. The living quarters on the construction site meet the requirements of the fire protection code and relevant fire protection regulations. If the general contractor fails to provide accommodation for the subcontractor, the subcontractor shall solve it by himself.

5. Abide by the general contractor's safety management system, attend the on-site safety production work meeting and implement the resolution.

6. Formulate the target responsibility management system for safety production of this unit and file it with the general contractor.

7. The construction personnel of this unit should register and truthfully report to the general contractor. When personnel are adjusted, they should immediately report to the general contractor and conduct safety education. Without safety education, they are not allowed to enter the construction site, and they are not allowed to hire people without identity documents and children under the age of 16. Construction site personnel should wear identification cards to prove their identity, and non-construction personnel are not allowed to enter the construction site without authorization.

8. Be responsible for pre-shift safety education and guard changing safety education, and make targeted safety technical disclosure at the same time.

9. Declare the inspection and acceptance of labor insurance supplies, machines and equipment to the general contractor and the supervisor, and use them after they are qualified.

10. In case of construction in an area prone to fire or accident, an application shall be submitted to the general contractor, and construction can only be started after approval, and effective preventive measures shall be taken at the same time. When storing and using inflammable and explosive equipment, corresponding safety fire control measures should be taken.

1 1. Educate the employees of this unit to observe the rules and discipline, and not to command or operate illegally. In the process of construction, if the subcontractor's personnel violate the command rules, safety discipline, safety operation rules and safety technical disclosure, the subcontractor shall be responsible for the casualties caused thereby.

12. Subcontractors need to use tower cranes, construction elevators, legs and other mechanical equipment and materials of the general contractor, and need to submit a written application to the general contractor. After the general contractor agrees, the general contractor will coordinate and command, and the material user will bear certain rental fees, depreciation fees and maintenance fees (both parties will settle them through consultation). No unit or individual is allowed to command or contact equipment operators and commanders for use without authorization.

13. After the subcontractor enters the site, the finished or semi-finished products shall be processed at the place designated by the general contractor. If it is necessary to change the general layout of construction, it can only be implemented with the consent of the general contractor. The stacking of materials entering the site must conform to the safety and civilized construction specifications and fire control requirements. All materials, machines and equipment need to go out of the gate when entering or leaving the site, and can only be released after being approved and checked by the doorman.

14, working conditions and labor protection measures (safety helmet, safety belt, etc. ) The subcontractors shall be responsible for the construction site. Without the consent of the general contractor, the safety protection of four ports and five sides shall not be removed, otherwise the consequences will be at your own risk. The installation and use of on-site construction power lines and facilities must conform to the installation specifications and safety operation procedures. It is forbidden to connect any wires, and the lighting must meet the safety requirements.

15, to ensure smooth roads on the construction site, to ensure that the construction drainage reaches the discharge standard, to control the construction noise pollution, and to do a good job in on-site fire control.

16. The temporary electricity consumption of subcontractors shall be approved by the general contractor, and witnessed by the supervisor and the owner. Sub-meter and meter reading shall be installed in the power distribution room of the general contractor, and the proportion of sub-meter installation shall match the electricity consumption on the construction site. At the same time, the safety table will be stamped with the seal signed by the general contractor project department, and no unit or individual may disassemble or damage it. After the construction temporary water is approved by the general contractor, the supervisor and the owner will take it out at the designated interface and read the meter. The unmeasured electricity and water shall be settled through negotiation.

17. Subcontractors shall not damage public materials when entering the site. Unauthorized damage, compensation at the price, and impose a fine of one to two times.

18. Subcontractors should strengthen communication and coordination with the general contractor and cooperate sincerely to ensure the smooth progress of construction.

Person in charge:

20XX year x month x day

Project Subcontracting Safety Responsibility Letter 3 In order to institutionalize, standardize and standardize safety production, the responsibilities are clear and the tasks are specific. According to the relevant measures combined with the actual situation of the project department, this liability form is formulated.

First, the object of responsibility

The person in charge of the construction unit is the first person in charge of production safety, and is fully responsible for the work of production safety in this unit. The person in charge of production safety (safety officer) is directly responsible, and other responsible persons are responsible for the work of production safety within their respective construction scope.

Second, the responsibility goal

1, establish and improve the leading organization for production safety, and implement personnel, systems and measures. Make annual safety production plan, and sign safety production responsibility letters with relevant responsible persons and all employees.

2. Carry out publicity and education on safety production, create a good safety production atmosphere, and enhance the safety awareness of all employees.

3. Strengthen daily safety supervision, eliminate potential safety hazards in time, make inspection records every day, take measures for rectification, and effectively implement them.

4, highlight the safety details management, formulate accident emergency rescue plan, submitted to the project department safety committee for the record, accident should actively organize rescue, and truthfully report according to the relevant provisions, actively participate in the aftermath, assist in accident investigation and handling.

Third, specific measures.

1, the main person in charge of the construction team, safety management personnel and special operations personnel must take part in training and hold relevant certificates, and the holding rate is 100%.

2, seat belts, safety ropes, helmets, dust masks and other labor protection articles should be fully equipped.

3. When entering the construction site, you must wear labor protection articles such as safety helmet correctly. It is forbidden to wear sandals, slippers, high heels or short skirts and shorts to enter the construction site.

4, mechanical equipment safety protection measures in place, the responsibility is clear, the operator should be familiar with the safety operation procedures of this type of work, before operation, all parts of this equipment must be checked to ensure safety before operation, the equipment should be parked in a flat, safe place without any obstacles and will not affect the passage of other vehicles, and it is strictly prohibited to park in a place that may collapse or the address is unstable.

5, tunnel operation must be done in accordance with the relevant provisions of the safety protection, there must be a professional security officer to check the safety situation in the hole around the clock and establish a succession system, and effectively ensure the safety measures in ventilation, drainage, power supply and other links in place.

6. Site construction must follow the principle of "safety first, civilized construction", and safety warning signs, slogans and signs are complete.

7, strengthen the safety education of workers, all workers must carry out three-level safety education and training, employee training rate 100%.

8. Construction access roads, living quarters and canteens shall meet relevant safety standards, and fire control and food hygiene systems shall be implemented.

9, blasting personnel must hold relevant certificates, each blasting process should comply with the relevant safety regulations, each unused blasting equipment shall not be placed on the construction site, should be returned to receive blasting supplies.

10, electricity must conform to the construction standards, must be equipped with professional electrician operation, it is forbidden to unlicensed personnel engaged in live work.

1 1. All vehicles in the construction area must obey the traffic laws. It is forbidden to use "three noes" vehicles, and workers are forbidden to take construction vehicles (non-passenger vehicles). Drivers must strictly abide by the relevant regulations of the project department.

12, the construction ZuoYeDui should establish an emergency rescue organization, equipped with necessary emergency rescue equipment.

Party A:

Party B:

XX project department

XX,XX,XX,XX

Project subcontracting safety responsibility book 4 Party A:

Party B:

In order to conscientiously implement the policy of "safety first, prevention first and comprehensive treatment", further strengthen the management of construction safety production, improve the management level of construction site, implement the responsibility system for safety production at all levels, improve various safety protection facilities, prevent and reduce production safety accidents, safeguard personal and property safety, maintain social stability and build a harmonious society. According to the Construction Law of People's Republic of China (PRC), the Safety Production Law, the Regulations on Safety Management of Construction Projects, the Regulations on Safety Production Management of XX City and other related systems, the responsibility book for construction safety production is specially formulated.

1. Party A and Party B should conscientiously implement safety production policies and regulations, strengthen safety awareness, improve construction management by improving rules and regulations, strengthen prevention, and carry forward the "three-dare spirit" of daring to manage, grasp and punish, so as to achieve the "zero" goal of safety production.

Second, the production safety responsibility period:

From the construction site to the project completion.

Three. Responsibilities and obligations of Party A:

1. For the construction project undertaken by Party A, the construction scheme and "three major measures" (i.e. organizational measures, technical measures and safety measures) to ensure safety shall be formulated in combination with the actual project, and the implementation shall be supervised after the owner and supervision unit have passed the examination.

2. Hold the business license, qualification certificate and safety production license issued by relevant departments, and hold the identity certificate and power of attorney of the legal representative.

3, the relevant person in charge, engineering and technical personnel and special operations personnel configuration and related certificates meet the requirements of safe production.

4, should have a complete safety management system. All types of work safety operation procedures, special operations personnel related certificates examination system, post responsibility system for production safety at all levels, regular safety inspection, safety education and other systems.

5. Before starting work, Party A must make a comprehensive disclosure of safety technology and civilized construction to the project director and safety director of Party B, with complete disclosure materials and records, which shall be signed by the disclosure personnel of both parties.

6. Inspect Party B's construction site from time to time, stop and correct the behaviors of Party B's personnel in violation of relevant safety production rules and regulations in production, and issue a written rectification notice with a copy for the record; Immediately stop illegal operations and illegal command work.

7. Party A must organize all construction personnel to conduct safety education, skills and safety examinations in different regions, and they can enter the site only after passing the examination.

Four. Responsibilities and obligations of Party B:

1. Party B must implement the national guidelines, policies, decrees and regulations on safety in production and abide by the national and industrial regulations on safe and civilized construction. Abide by the rules and regulations of the website.

2. Party B must be equipped with full-time security officers to conduct on-site safety supervision. Special operations personnel must hold a valid special operation qualification certificate before they can take up their posts.

3. Party B's personnel must have no symptoms that hinder their work, otherwise they shall not take part in the work. All registered construction personnel shall not be replaced at will, and shall not be an impostor.

4, equipped with machinery, labor contracts and safety protection facilities, safety appliances to meet the needs of safe production.

5. When Party B carries out the project construction of special operations and dangerous operations, it must have safety guarantee measures and send someone to supervise it.

6. Party B shall consciously accept the supervision and guidance of Party A's safety supervisor .. The safety rectification notice put forward by Party A's safety supervisor must be rectified in time. In case of personal accident or unsafe situation endangering production and operation during construction, it must be reported to Party A immediately.

7. Party B must provide qualified labor protection articles and safety appliances for construction personnel in accordance with relevant state regulations, and ensure the safety of construction tools and appliances.

8. Before starting work, the construction machinery, instruments and safety protection facilities shall be inspected to ensure compliance with safety regulations, and the inspection period shall not exceed. Party B's construction personnel shall carefully inspect the construction area, working environment, operating facilities, equipment and tools. Stop the construction immediately after finding hidden dangers, and continue the construction only after the rectification is implemented. All kinds of equipment and tools used in the construction should meet the construction requirements. Assign special personnel to inspect the construction site every day before starting work, and rectify in time if any hidden danger is found. Party B shall not dismantle or change various safety protection facilities, fences, safety signs and warning signs without authorization.

9. Employment shall be carried out in accordance with the Labor Law of People's Republic of China (PRC) and other laws, regulations and rules, and it is strictly forbidden to use minors for construction.

10, Party B is responsible for the safety technical measures taken in the work area, the status of the working class personnel and the safety responsibilities during the construction period; If all accidents or losses are caused to the third party due to improper safety measures taken by Party B, violation of relevant safety rules and regulations and safety matters listed in this agreement, Party B shall bear the economic losses and legal responsibilities caused thereby.

1 1. When Party B's operators violate the relevant rules and regulations on production safety, Party A's on-site person in charge, safety and other relevant personnel have the right to correct and stop it, notify Party B and give it to the Economic Office.

Liquidated damages until Party B stops working.

12. Party B must purchase insurance for all construction workers on site as agreed, and can only take up their posts after the insurance takes effect. Insurance documents must be submitted to Party A's office for filing every month.

5. Personal injury, equipment damage accidents and economic losses caused by Party B shall be borne by Party B, and the relevant government departments shall be notified to investigate, handle and report statistics.

This responsibility for intransitive verbs is made in duplicate, with the same legal effect, and each party holds one copy.

Party A (signature):

Party B (signature):

20XX year x month x day

The Safety Responsibility Letter for Project Subcontracting 5 is to fully implement the safety production policy of "safety first, prevention first and comprehensive treatment", to ensure the occupational health and safety of the project department in the project construction activities, to ensure the safety of all kinds of construction machinery, and to ensure that the state property, collective property and social public interests are not damaged. In order to ensure the realization of the goal of safe and civilized construction, this responsibility letter is hereby signed in accordance with the Law on Safety in Production, the Regulations on Safety Management of Construction Projects and the construction contract.

First, the working principle:

Adhere to the Safety Production Law, Regulations on Safety Management of Electric Power Construction and relevant management systems for safe and civilized construction of the Project Department, clarify the safety management responsibilities of all parties, and implement the principle of individual responsibility.

2. Give full play to the role of safety production guarantee system and supervision system, do a good job in safety training and education for all contractors, ensure that workers master the required production skills and safety knowledge, and cultivate a rigorous work style.

3. Work concept: through unremitting efforts, actively prevent all kinds of accidents (except irresistible natural disasters) and actively prevent all kinds of hidden dangers.

Second, the security objectives:

Personal death accident is zero; Personal injury accident is zero; Group injury accidents are zero; Major mechanical equipment accidents are zero; The fire accident is zero; Traffic accidents are zero; Collapse accident is zero; Occupational health injury accidents are zero; The accident rate of minor injuries is less than ‰.

Three, the safety responsibility of punishment and reward requirements:

The safety leading group of the project department will inspect, assess and evaluate whether the responsible unit has achieved the goal of safety and civilization and implemented the departmental safety responsibility system according to the following standards, and put forward suggestions on rewards and punishments.

The security deposit is RMB 50,000.00 Yuan (deducted from the project payment for the second time).

When an accident occurs during the assessment period, the security deposit shall be assessed according to the following standards:

1, personal death accidents and traffic accidents, 00%.

2, personal injury accidents, 80%.

3, major equipment accidents (including major construction machinery accidents), 60%.

4. Major equipment accidents (including major construction machinery accidents) will be deducted by 40%.

5, major fire accidents, 60%.

6. In case of a major fire accident, 40% will be deducted.

7, a group injury accident, 30%.

8. Major traffic accidents, 40%.

9, general traffic accidents, 30%.

10, major collapse accident, 40%.

1 1, a large collapse accident, 30%.

12, if the minor injury rate is higher than ‰, 30% will be deducted.

13. In case of concealment accident, 50% will be deducted if it is found, regardless of the severity.

14. If the safety objectives are achieved, the hidden dangers and accidents in this area or other units are found during the construction and actively handled, they will be reported to the safety committee for research and reward according to the evaluation results, and the amount will depend on the situation.

4. This responsibility letter is made in duplicate, one for each party, and it will take effect after being signed by both parties. This responsibility is valid from the date of signing to the end of the project.

China water conservancy and hydropower xxxxx Co., Ltd.

Manager of xxx Wind Farm Project Department:

20XX year x month x day

Responsibility Letter for Safety of Project Subcontracting 6 In order to implement the Law on Safety in Production, adhere to the policy of "Safety First, Prevention First, Comprehensive Treatment", implement the "Responsibility System for Safety in Production", strengthen the management of safety in production, ensure the personal safety of employees and the safety of equipment, and ensure the smooth progress of Luhejin Wind Farm Project, the project manager and the project chief engineer xxx signed a responsibility letter for safety in production after research and decision by the leading group for safety in production of the project department.

I. Responsibility

1, firmly establish the idea of "everyone is responsible for production safety" and resolutely implement the policy of "safety first, prevention first and comprehensive management". Seriously study and consciously abide by the Safety Production Law and other safety production laws and regulations, and conscientiously study and consciously abide by various safety production rules and regulations formulated by Hydropower X Bureau, Installation Branch and this project department. Implement the responsibility system for production safety at all levels, strengthen the management of production safety, prevent or reduce the occurrence of casualty accidents, and ensure the safety and health of employees in production activities;

2, take the lead in implementing the rules and regulations of production safety, under the leadership of the project manager, do a good job in the project department's engineering construction safety technology management, supervision and inspection. Responsible for the preparation of weekly and monthly safety production plans and various construction safety technical measures, and go deep into the field to solve the safety technical problems existing in production.

3, organize and preside over the preparation and study of safety production operation procedures, and implement safety technical disclosure and education.

4. Responsible for reviewing and compiling technical measures for safe production and civilized construction in construction organization design, compiling safety production and construction measures for important projects, and handling the approval of safety production and construction work (operation) tickets for important projects. After approval, technical disclosure and safety measures shall be made in writing to relevant departments such as engineering quality, safety, production scheduling, construction team and production backbone.

5, responsible for the layout, inspection and guidance of various departments, construction teams, engineers, assistant engineers or technicians to prepare construction measures and written disclosure of safety production technology of subdivisional work. Supervise and guide technicians to carry out construction and production in accordance with the prescribed operating procedures. Supervise the implementation of safety technical measures.

6. Responsible for organizing, inspecting and guiding the safety technical work of monitoring major hazard sources, making emergency plans and seriously implementing them. Participate in the inspection of "Safe and Civilized Construction" and provide technical support for projects that need rectification. Organize to review and prepare the annual construction safety technical measures plan, and actively improve the construction environment.

7. Guide and support the work of full-time (part-time) security officers from technical aspects.

8. Organize the preparation of safety construction measures in the technical innovation and new construction technologies and processes of this project.

9. Be responsible for organizing the research on safety facilities of unit maintenance engineering and the implementation of standardization of safety facilities.

10, responsible for supervising and guiding the safety construction technology of subcontractors' construction projects.

1 1, participate in safety inspection and safety construction inspection, solve the existing safety technical problems, review the safety production technical account of the construction team, and do a good job in the management of professional safety technical data, accounts and drawings.

12, participate in the investigation and analysis of production safety accidents and serious near misses, and put forward technical preventive measures.

13, responsible for supervising the implementation of safety technical measures within the scope of work, and timely revising, supplementing and perfecting the contents of relevant safety technical measures, and being responsible for the effectiveness of safety technical measures in charge.

14. The chief engineer is responsible for the safety technical work according to his post responsibilities.

15, do a good job in flood control technology.

Second, power.

1, and has the right to stop and correct the illegal operation of others.

2. Have the right to stop blindly grabbing progress and taking reckless risks.

3, have the right to put forward different opinions on major issues of production safety.

4, in dealing with major safety technical accidents have the right to raise objections, at the same time have the right to leapfrog.

Third, the evaluation principle

1, adhere to the principle of "responsibility implementation, risk taking, expected assessment and clear rewards and punishments".

2. The assessment adopts a percentage system, and the assessment points are not capped.

3. The responsible person shall pay the safety risk of mortgage during the assessment period, with the amount A0=800 yuan.

4. The safety production committee of the project department is responsible for the daily assessment and year-end summary of the responsible person; The project manager will cash the same amount of safety reward according to the year-end assessment results.

5. If the person responsible at the end of the year is rated as an advanced individual in production safety by the superior unit, the superior unit will reward him, and the project department will reward him according to the reward amount of the superior unit.

6. The project manager implements "safe production" target management for the responsible person. The full mark of the target assessment is Q0= 100, and the comprehensive score of the year-end assessment is q, so the calculation formula of the cash reward and punishment amount in the year-end assessment is: a = A0 * [(q-85)/(q0-85)]1/3.

Fourth, the assessment rules

1, in the superior safety inspection (within the scope of the responsible person's duties, the following rectification notice shall prevail), 2-5 points will be deducted once violations are found. If the responsible person fails to handle the on-site violations or even neglects his duty, he will be deducted 10-20 points at one time.

2. If the responsible person is fined in violation of regulations, 2- 10 points will be deducted each time.

3. If the responsible person fails to do a good job within the scope of duties, 5- 10 will be deducted for each item.

4. In case of any of the following circumstances, in addition to the Measures for the Administration of Work-related Injury formulated by the project department and other relevant safety management regulations, the responsible person shall be given corresponding administrative treatment and economic punishment, and points shall be deducted according to the following assessment principles.

(1) If the responsible person has a minor injury accident, 30 points, 20 points, 10 points and 5 points will be deducted from the assessment scores of the responsible person according to the total, major, equal and minor responsibilities.

(2) If the responsible person has a serious injury accident, the assessment score of the responsible person shall be deducted by 50 points, 40 points, 30 points and 20 points respectively according to all, major, equal and minor responsibilities.

(3) If employees and other production personnel are slightly injured due to improper construction safety technical measures, the person responsible will be deducted 5-30 points each time.

(4) If employees and other production personnel are seriously injured due to improper construction safety technical measures, the responsible person will deduct 10-50 points each time.

(5) If the project department dies at work once due to improper technical measures for construction safety, the assessment score will be deducted in full.

6. If the responsible person causes injury accidents to others, the assessment score of the responsible person will be deducted from 80 points, 60 points, 40 points and 20 points respectively according to all, major, equal and minor responsibilities.

5. After deducting the safety risk of the responsible person from the mortgage payment, a mortgage payment of the same amount shall be paid separately.

6. Whoever conceals, delays or falsely reports the accident, intentionally destroys or forges the accident site preparation will impose a fine of 500 ~ 2,000 yuan on the responsible person; If the circumstances are serious, it shall be handed over to judicial organs for handling.

7. The responsible person shall be transferred from the project department during the assessment period, and the term of office of the responsible person shall be assessed. Safety responsibility rewards and punishment will be cashed after being audited by the project department manager, and the remaining mortgage will be refunded.

Verb (abbreviation of verb) supplementary clause

1. This Responsibility Letter shall come into effect after being signed (sealed) by the project manager and the person in charge, in duplicate, with each party holding one copy.

2. This "Responsibility Letter" shall take effect as of the date of signature.

Signature (Seal) of Project Manager:

Signature (seal) of person in charge:

20XX year x month x day

;