After the Spring Festival, * * * * * * the management personnel and labor construction personnel of the project department are all in place, and the construction site has been inspected and arranged in a unified way:

1. All electrical equipment and temporary power lines on the construction site have been inspected and arranged comprehensively to ensure the safety of electricity use;

2, all kinds of construction machinery for inspection and trial operation, everything is normal, complete and effective safety protection measures;

3. Repair, replace and adjust the protective facilities and warning signs on the construction site;

4. Fire fighting equipment and facilities are in good condition and effective;

5. Carry out safety re-education for workers entering the site, and carry out pre-job safety education and safety technical disclosure for new workers.

6. Other preparations before returning to work, etc.

the above work has been comprehensively checked and sorted out by the project department, and the conditions for normal construction have been met. Now, we apply to resume normal construction and production on February 14th, 211.