Joke Collection Website - Bulletin headlines - Outdoor activity plan for drought relief and water supply conservation
Outdoor activity plan for drought relief and water supply conservation
Outdoor activity plan for drought relief and water supply protection in 2022 (selected 5 articles)
In order to ensure that activities are carried out scientifically and orderly, it is often necessary to prepare an activity plan in advance. The activity plan is to clarify the activity time , location, purpose, expected results, budget and written plan of activity methods. How to write an activity plan to be more effective? Below is the outdoor activity plan for drought relief and water supply conservation in 2022 that I compiled (selected 5 articles). I hope it will be helpful to everyone.
Outdoor Activity Plan 1 for Drought Control and Water Supply
In order to effectively respond to the complex and severe situation of flood control and drought relief in 20xx, we will further enhance the main awareness of flood control and drought relief among teachers and students in our district, and improve the ability and ability to prevent flood and drought disasters. Self-rescue and mutual rescue capabilities, according to the unified deployment of the autonomous region flood control and drought relief headquarters and the urban two-level flood control and drought relief headquarters, it was decided to designate May this year as "Flood Control and Drought Relief Publicity Month". In order to do a good job in practical work and combined with the actual situation of the education system in our district, the relevant matters are now notified as follows:
1. Theme of the activity
Popularizing knowledge about floods and droughts and improving disaster awareness Preventive awareness and reduce the risk of floods and droughts.
2. Activity time
May 20xx.
3. Publicity content
(1) Knowledge on flood prevention and drought relief. Knowledge on prevention of floods, typhoons, flash floods, droughts and other floods and droughts; knowledge on handling engineering dangers, rescue of persons in distress and self-rescue.
(2) Flood control and drought relief situation and focus of defense work. Understand the school's flood prevention and drought relief situation in 20xx, local typhoons, floods, droughts and other disaster-prone (affected) areas and the focus of defense work.
(3) Emergency plan for flood control and drought relief. Prepare emergency plans for flood disasters in schools, emergency plans for drought disasters, contingency plans for typhoon prevention, emergency plans for flash flood disasters, and emergency plans or work plans for projects under construction to survive floods safely.
IV. Activities Requirements
(1) Accurately grasp the situation and raise awareness. Judging from the autonomous region's judgment of this year's flood control situation and the forecasts of the meteorological and hydrological departments, this year's flood season in our region is a normal to abundant year. However, due to the uneven spatial and temporal distribution of rainfall, the uncertainty of meteorological changes, and the frequent occurrence of extreme weather events Due to other reasons, the possibility of severe floods and droughts in river basins in our region is relatively high this year. Due to the influence of typhoons, strong convective weather and other factors, small and medium-sized river basins and localized floods caused by heavy rainfall are inevitable. To this end, each school must use effective publicity methods to publicize the seriousness of this year's flood prevention and drought relief situation to teachers and students, thereby improving students' awareness of disaster prevention and reduction and their ability to rescue and mutually rescue themselves, and avoid casualties to the greatest extent.
(2) Strengthen leadership and unified deployment. All school district offices and middle schools should combine the spirit of the "20xx District Education System Flood Prevention and Drought Relief Emergency Plan" to strengthen the leadership of flood prevention and drought relief publicity activities, uniformly deploy the "Flood Prevention and Drought Relief Publicity Month" activities of schools in the jurisdiction and their own schools, and integrate publicity activities Integrate with flood control and drought relief work to prevent problems before they occur.
(3) Focus on the theme and promote it through multiple channels. All school districts and schools must closely focus on the theme and combine the actual teaching, and carry out "three-dimensional" in a planned, step-by-step and targeted manner through school broadcasts, the Internet, text messages, flyers, slogans, blackboards, lectures, drills and other forms. "Promotion campaign.
All school districts and middle schools are requested to submit various materials during the publicity process, including text, pictures, videos and other activities, to the safety office of our bureau before May 30, so that they can be summarized and reported to superiors. various departments. Outdoor Activity Plan 2 for Drought Resistance and Water Supply
Since July this year, our township has experienced continuous dry weather and low rainfall, which has caused some crops to grow slowly or even die, and people and animals are in short supply of drinking water. According to statistics, as of September 22, a total of 271 acres of crops in the township have been affected by drought, including 95 acres of light drought and 186 acres of severe drought. Of the 10,863 acres of paddy fields in the township, 218 acres are short of water and 33 acres of dry land are short of water. 2,620 people and animals have difficulty drinking water due to drought. Drought-affected crops are mainly distributed in Shangfeng, Mingshan, Pingtian, Xin'an, Yiping, Wuxing and other village committees. Since the drought, our township party committee and government have attached great importance to it and quickly established a drought relief leading group to comprehensively investigate and understand the drought situation and adopt practical drought relief measures.
As of September 21, a total of 3,020 people have been invested in drought relief in our township, 10 sets of mobile drought relief equipment have been invested, and drought relief funds of 4,500 yuan have been invested (all self-raised by the masses). 3,020 people with drinking water difficulties for humans and animals have been temporarily solved, and drinking water for large livestock has been solved. Difficulty 82 heads. It rained on September 20, and the drought in our hometown was partially alleviated. In order to ensure that the next step of drought relief work is carried out in an orderly manner, this plan is specially formulated as follows:
1. Further unify thinking and strengthen leadership
Our township has established a team with the secretary as the team leader and the township head. , the chairman serves as the deputy leader, and the drought relief leading group is composed of members from other township teams and personnel from water management stations, party and government offices, police stations, power supply stations and other departments to guide and coordinate the drought relief work in the township. By building a strong leadership group, we will provide a strong guarantee for the effectiveness of drought relief work in the township.
2. Continuously go deep into the fields and give full play to the pioneering and exemplary role of party members and cadres
Cadres and workers of the township and village committees work on a contract basis to lead the people of each village (community) to fight drought and ensure harvests . First of all, the Xiangbao Village Working Group organized village committee cadres and the masses to conduct a thorough dredging and maintenance of the water canals in the jurisdiction, so that the water from the main canals can be diverted to the fields; secondly, the farmland with relatively high terrain and where water cannot be diverted should be used. Irrigation is carried out by pumping water for irrigation. Thirdly, the masses are guided to replant dry fields that cannot be irrigated (Wang Tian Tian) with other cash crops, and according to the principle of planting in the right place, switch to other cash crops such as sweet potatoes and peanuts to maximize the benefits of farmland. The rural people overcame the mentality of "waiting, relying, and wanting" and tried every means to raise funds for drought relief.
3. Fully coordinate and cooperate to strengthen services
Township and village cadres must fully cooperate with the county drought relief service commando team to provide drought relief guidance. Provide assistance and services to disadvantaged groups and actively provide technology, equipment, and financial services to the masses.
Fourth, actively strive for support from superiors, fully mobilize the masses, and increase investment
First, actively strive to directly contract the county to directly contract the townships to face the drought. The Agricultural Bureau and Meteorological Bureau where the commando team is located , the Federation of Trade Unions and other units have given our township strong support in terms of human, financial and material support. Among them, the Agricultural Bureau supported drought relief funds of 2,000 yuan, the Meteorological Bureau supported drought relief funds of 1,500 yuan, and the Federation of Trade Unions supported drought relief funds of 1,500 yuan, totaling 5,000 yuan. , focusing on the purchase of drought-resistant equipment. At the same time, it will be used for communities with severe drought conditions such as the Ring Road area, Zhugendong, Lincundong, Wayaodong and Napengdong of Yiping Village Committee, as well as Bengshandong of Gaotian Community and Ligaodong of Mingshan Village Committee. drought-resistant fuel subsidies for paddy fields. In addition, we must fully mobilize the masses to raise funds to fight drought, and adopt the form of mutual assistance between households and villages to fight drought.
5. Repair water conservancy facilities as soon as possible
First, strive for 2,000 yuan from superiors to repair the Taozi Dam of Yiping Village Committee. After the water diversion is restored, the problems in Wayaodong and Napengdong will be solved. Irrigation to alleviate drought conditions.
The second is to strive for 1,000 yuan of funds from superiors to repair the water valve of the Modaojiang Reservoir water release culvert and the draft problem of the reservoir administrator, strengthen the reservoir duty, and rationally schedule irrigation. Outdoor activity plan 3 for drought resistance and water supply
In order to effectively carry out flood prevention and disaster relief work in the county's transportation system in 20xx, ensure safe and smooth flow, effectively control and eliminate dangers, and avoid and reduce casualties and property losses to the greatest extent , based on the spirit of the county government’s flood prevention work conference and the municipal bureau’s flood prevention work guidance, and combined with the actual situation of our county’s transportation system, the 20xx flood prevention work plan was formulated.
1. Overall requirements
Flood prevention work is related to the safety of people’s lives and property, as well as to economic construction and social stability. It is necessary to fully understand the seriousness of floods, resolutely overcome the weak awareness of floods, numb thoughts and luck, and enhance the sense of responsibility and urgency. In the event of excessive floods, all efforts must be made to protect and ensure the safety of major transportation facilities, and emergency response measures must be in place to minimize flood losses. In the event of flood threats and damage, emergency repair tasks will be completed to ensure normal traffic on the highway. Adhere to equal emphasis on flood prevention and waterlogging prevention, and focus on both flood prevention and drought relief to ensure that the transportation department's flood prevention and drought relief tasks are completed.
2. Work Responsibilities
According to the definition of the responsibilities of the member units of the County Flood Control Headquarters, the flood control responsibilities of each unit of the transportation system are as follows:
Highway Bureau: Responsible for the county area For the flood control safety of trunk road traffic such as national highways and provincial highways, manpower and material resources are promptly organized to repair flood-damaged roads, bridges and culverts to ensure smooth roads.
Rural Highway Management Office: Responsible for the flood control safety of rural highway traffic within the county, and promptly organizes manpower and material resources to repair rural roads damaged by water, bridges and culverts, and ensure smooth roads.
Transportation Authority: Responsible for organizing and coordinating the transportation of flood rescue and relief materials and evacuees.
Law Enforcement Office: Responsible for maintaining order at the scene of a major flood; assisting the public security department to ensure smooth roads in dangerous sections.
County Truck Transportation Corporation and Municipal Passenger Transportation Company: Responsible for organizing material transportation for flood prevention and rescue, disaster relief and key flood relief projects.
Bureau: Responsible for communication among team members during flood prevention and internal flood prevention management and coordination of the transportation system.
3. Organizational leadership and division of labor
In order to clarify responsibilities, strengthen inspection and supervision, and compare the responsibilities of each unit, the division of labor among the members of the bureau's flood control headquarters is as follows:
xxx : Responsible for the overall flood prevention work and provide unified command for the overall flood prevention work.
xxx: In charge of the flood prevention work of the bureau, responsible for the daily work of the bureau's flood prevention headquarters, and assisting the director in coordinating the flood prevention work of the entire system.
xxx: Responsible for the flood prevention work of the Highway Bureau.
xxx: Responsible for the flood prevention work of the Transportation Development Company.
xxx: In charge of the flood prevention work of the Transportation Management Bureau, County Truck Transportation Corporation, and Municipal Yunguang Mountain Company.
xxx: In charge of the flood prevention work of the rural highway management office.
xxx: In charge of the flood prevention work of the law enforcement station.
The administrative leader of each unit is the first person responsible for flood prevention work in the unit.
4. Arrangement of rescue personnel and vehicles
The entire system has prepared 120 flood prevention and rescue personnel and 40 vehicles. Among them: 30 people in the Highway Bureau, 10 vehicles; 20 people in the Transportation Management Bureau, 10 social vehicles; 30 people in the law enforcement office; 30 people in the County Automobile Transportation Company, 10 vehicles; 30 people in the Municipal Passenger Transport Company, 10 buses . In the event of a severe flood or danger, the personnel of each unit will be led by the unit's first responsible person, and the vehicles will be led by the unit's leader in charge to participate in the rescue mission (the list of rescue personnel from each unit shall be reported to the bureau's flood control office, which is located in the bureau's business unit).
5. Work requirements
1. Strengthen flood prevention awareness. All units must effectively strengthen the leadership of flood prevention work, organize carefully, actively prepare, fully perform the responsibilities and obligations of the Flood Control Law, enhance flood awareness, firmly establish the idea of ????being prepared for danger in times of peace, and be constantly prepared, and proactively carry out flood prevention work.
2. Strictly implement the flood prevention responsibility system. Comprehensively implement the administrative top leader responsibility system to ensure that the thoughts, work, command and investment are in place. Team members and relevant personnel must have clear responsibilities, clear tasks, perform their duties and responsibilities, and cooperate closely.
3. Strict flood prevention work disciplines. Flood prevention work has a heavy responsibility. All units must consider the overall situation and the safety of people's lives and property, fully understand the importance of flood prevention work, strictly abide by relevant regulations, obey orders, and obey instructions. Anyone who delays work due to dereliction of duty, negativity, prevarication, etc. and causes losses shall resolutely hold the relevant leaders and parties accountable.
4. Before the flood season, each unit must conduct a comprehensive inspection of its infrastructure, highways, bridges, production workshops, yards, stations, construction sites, and vehicle safety conditions, and promptly rectify hidden dangers if they are discovered. Eliminate potential accidents in the bud, closely integrate flood prevention with the "Safety Production Month", "Safety Production Year" and special production safety rectification activities to ensure that flood prevention and safety production are both correct, and ensure a safe passage through the flood.
5. During the flood prevention period, the top leaders of each unit must ask for leave from the main leaders of the bureau if they go out for business or private reasons. Otherwise, they will be treated as a disciplinary violation. All units must adhere to a 24-hour duty system. In case of danger, rescue personnel and vehicles must be on call to ensure nothing goes wrong.
Outdoor activity plan 4 for drought resistance and water supply
According to the requirements of the province, city, and district, and in accordance with the policy of "safety first, constant preparation, prevention first, and all-out rescue", in order to effectively carry out street flood control in 20xx work to ensure that the streets can survive the floods safely, maintain street economic development and social stability, and take into account the actual conditions of the streets, start early and make solid preparations. The 20xx flood prevention plan is hereby notified as follows:
1. Strengthen leadership and clarify responsibilities
(1) Establish a street flood prevention leading group. The team leader is the director, the deputy team leader is the minister, and other station office directors are members.
(2) Establish a village and community-level flood prevention leading group. The leader: the village and community secretary and director. The members: the village and community committee cadre members and the village and community group leader.
(3) Establish flood prevention and rescue teams at the street, village and community levels.
(4) Smooth information. Each village and community group determines early warning personnel, monitoring personnel, and transfer personnel, and reports promptly to the village and community flood prevention leading group when flood conditions occur, and the village and community report to the street flood prevention leading group.
(5) Strengthen flood prevention duties. During the flood season, a leader-led shift system is implemented. The shift leader is fully responsible and the on-duty personnel are specifically responsible. The on-duty personnel must arrive at their posts on time and keep the phone open 24 hours a day. (Duty phone number: xxxxx)
2. Key tasks
(1) Seriously carry out flood control safety inspections and pre-flood preparations.
(1) Strengthen leadership and implement responsibilities. The sub-district flood prevention leading group arranges for villages, communities and member units within its jurisdiction to conduct pre-flood training and related flood prevention deployment work.
(2) Street communities and villages should conduct a comprehensive inventory of flood control materials in stock, and organize flood control materials for 20xx. According to the requirements of the flood control emergency plan, ensure that sufficient quantity and quality of flood control materials are stored. Flood prevention materials (implement adequate supply of stone, wood and other emergency materials and obtain flexibility).
(2) Do a good job in flood prevention publicity and ideological work, adopt effective methods and methods to vigorously publicize flood prevention work, improve the public awareness of flood prevention, take the road of mass prevention and collective strategy, and carry out in-depth street flood prevention work.
(3) Carry out inspections before, during, and after floods. The sub-district flood control leading group organizes relevant personnel to conduct phased inspections of flood control work in the jurisdiction, and takes timely measures to deal with problems found during the inspection. If they cannot be dealt with for a while, they must implement their responsibilities and report them to the relevant departments at the higher level.
(4) Carry out inspection and registration of dilapidated buildings during flood season. Villages and communities must resolutely evacuate dangerous buildings with major safety hazards in their jurisdictions when there is heavy rain to ensure the safety of people's lives and property.
(5) Strengthen regular and irregular inspections and monitoring of reservoirs, check dams, landslides, tailings ponds, schools and other crowded places and dangerous areas within the jurisdiction, improve organizational mechanisms, and improve flood prevention systems ; If any abnormal situation is discovered, report it to the street flood control leading group in time and organize the masses to evacuate the dangerous area.
3. Emergency measures
(1) If heavy rain or rainstorm lasts for more than 2 hours, all street cadres (including those in public welfare positions) will be on standby in the street office. Village and community cadres must Be on standby within your own jurisdiction and be ready to participate in flood prevention and rescue work at any time.
(2) If heavy rain or rainstorm lasts for more than 3 hours, all street, village and community cadres should follow the orders of the street flood control headquarters and go to the responsible areas to carry out flood prevention and rescue work.
(3) During the flood control period, street, village, and community cadres should keep communication open 24 hours a day. Once they receive an order, they will rush to the requested site unconditionally. If they fail to arrive in time due to poor monitoring, inadequate measures, or disobedience to arrangements, Those who cause major disasters while on duty must be held strictly accountable.
(4) When a flood occurs, all emergency rescue work must be followed. The supplies and related materials required for flood control must be deployed in a timely manner to ensure the protection of human, material and financial resources.
(5) Sub-districts, villages and communities must set up emergency rescue teams within their respective jurisdictions, and together with personnel from sub-district stations and offices, they must obey the unified dispatch of the sub-district flood control headquarters.
Outdoor activity plan 5 for drought relief and water supply
In order to do a solid job in this year's flood prevention work, ensure the safety of people's lives and property, ensure the safety of the flood, and maintain social stability, combined with the actual situation of our town, the following plan is formulated: < /p>
1. Guiding ideology
The guiding ideology of flood prevention work is: guided by the Scientific Outlook on Development, conscientiously implement the principles of “safety first, constant preparedness, prevention first, and all-out emergency rescue” and With the policy of “focusing on prevention, focusing on prevention over resistance, and resisting over rescue”, we further strengthen the flood control and drought relief job responsibility system and the administrative head responsibility system, highlight the key points of flood control and drought relief, insist on both flood control and drought relief, and contribute to the overall economic and social development of our town. Provide guarantee for coordinated and sustainable development. The overall requirements are: within the prescribed flood control standards, the embankments of the main flood control rivers will not breach, the reservoirs will not collapse, and the drainage in the plain areas will be smooth; the whole town will survive the floods safely, and make every effort to protect the lives of the people and the safety of urban residents' living water; the main traffic arteries will be normal Operation; make arrangements for excessive floods, do everything possible to meet production and ecological water needs, and minimize losses from floods and droughts.
2. Main tasks and requirements
(1) Flood control in the irrigation area
The focus of flood control is the Meishan East Main Canal, Fengxi Main Canal and Donggan Branch Canal. All canals in the town must ensure safe floods. Each village must strengthen management and protection within the territory, determine management personnel, conduct regular inspections, pay close attention to rain and water conditions, and hoist and shut down machines must be oiled and debugged before floods to ensure lifting. freely. Open and close gates regularly to control upstream water in advance and drain runoff in a timely manner to ensure that main canals do not overflow or burst during floods. In particular, buildings such as drainage gate stations must be inspected and maintained. At the same time, the masses must be organized to reinforce and eliminate dangerous construction areas. Wooden piles, soil bullocks, gravel, plastic bags, etc. necessary for emergency rescue must be prepared to be prepared.
(2) Reservoir Flood Control
The four small reservoirs in our town all have varying degrees of disease and danger. According to the requirements of the "Small Reservoir Flood Control Plan" issued by the County Flood Control Headquarters, The Limin Reservoir has problems such as erosion upstream of the dam, and the water conveyance tunnel is tilted and leaking; the Tiepu Reservoir has problems such as severe corrosion of the hoisting and closing facilities; the Magang Reservoir has problems such as landslides in the concrete slope protection of the main dam, serious erosion of the auxiliary dam, and aging and malfunctioning hoists. etc. questions. Limin, Tiepu, and Fengshou reservoirs are required to operate according to restricted water levels, and Magang Reservoir must be empty during the flood season. At the same time, it is required that those responsible for the flood season should be at their posts, strengthen 24-hour duty, pay close attention to changes in water conditions and water levels, and carry out flood discharge and flood diversion work in a timely manner. The village where they live should strengthen reservoirs and large ponds, and make spillways and water conveyances. The dredging work of the cave will be carried out, and preparations for the safe transfer of people downstream of the reservoir will be made to ensure a safe flood season.
(3) River flood control
For flood conditions in rivers throughout the town, water-blocking dams and water-blocking trees must be removed to ensure smooth flood drainage. Villages and agricultural service centers must pay close attention to changes in water levels during the flood season, and relocate people to low-lying areas in a timely manner before major floods to minimize losses to people's lives, property, and crops.
(4) Other flood control
The market town is the regional political, economic and cultural center. The town department must dredge the drainage ditch to avoid water blockage and disaster; The area is large and the hazards are serious. Each village must organize people to fight against waterlogging and strive to prevent waterlogging from causing disasters. The town agricultural service center must conduct safety inspections on bridges, culverts and roadbeds on the highway to ensure smooth traffic. In addition, according to the arrangements of the headquarters, we will provide counterpart support to key flood control towns, and our town will provide counterpart support to Shahepu Town.
3. Strengthening leadership and main measures
(1) Flood control safety is related to the overall situation, and leadership must be strengthened, unified command, and flood control command forces enriched and strengthened. For this reason, the town has established a flood control and drought relief department The leading group, headed by the government mayor himself and attended by *** from relevant departments and village leaders, provides unified command of the town's flood prevention work. We must strictly enforce discipline and strengthen flood prevention responsibilities. Flood prevention is divided into different areas, and the cadres stationed in each village and each village director are the first responsible persons. They must inspect the flood prevention work in the village one by one. At the same time, they must inspect dangerous houses and dangerous houses in the village house by house, especially the extremely poor households, poor households, and Careful inspections will be carried out on orphaned elderly people, school insurance houses, and adobe houses in private houses, and they will be relocated during the flood season to ensure that no problems arise in the villages. If there are casualties due to irresponsible work and poor investigation, the relevant responsible persons will be severely dealt with. All primary and secondary schools should strengthen safety education. During major floods, they should do a good job in safety work for students on their way to and from school to prevent student safety accidents.
- Previous article:What's a good greeting to send an electronic photo album as a birthday present?
- Next article:What EIA is needed for scrap iron screening?
- Related articles
- Where does the traffic violation law in Pucheng County, Nanping City stipulate to be handled?
- 5 summary reports on Poverty Alleviation Day activities
- Slogan of reasonable position of kitchen trash can
- Write a slogan
- Characteristics of stainless steel storage rack
- How to set font style for Xiaomi mobile phone
- How about Tangshan Haiyin Salt Industry Co., Ltd.
- What can I do if I don't want to work for someone?
- Top Ten Shipping Companies in China
- Seven Summaries on the May 4th Movement