Joke Collection Website - Bulletin headlines - Quarterly personal summary of 9 words and 5 articles

Quarterly personal summary of 9 words and 5 articles

Personal summary of quarterly work is 9 words. 1

According to the quality control plan for the first quarter of 2-21 and the evaluation requirements of the new grade hospitals, the nursing department conducted special inspections on the quality of medical records, disinfection and isolation, nursing documents, etc. Now the existing problems are reported as follows:

1. Medical record quality

1. Long-term doctor's advice has been crossed and the first page has been altered.

2: the home page address is not detailed enough, and there are empty items.

3. The drawing of temperature sheets is inaccurate (individual temperature sheets are not drawn with curves)

4. Long-term doctor's orders and temporary doctor's orders are altered and scratched.

5: in the doctor's advice, The nurse failed to sign in time

2. Disinfection and isolation

1. There was dirt on the disposal table

2. There were bacteria and sterile items mixed

3. The sharp instrument box was not used as required

4. The cotton swab bag was not replaced in time after it expired

5. It was not registered in time after the disinfection solution was prepared

6. The strong iodine was not turned on

. Nursing documents

1: The drawing of temperature sheets is inconsistent with the three inspection books

2: The nursing handover is simplified

3: The damaged registration has been altered

4: The handwriting of handover is unclear and scrawled

5: Individual temperature sheets have no discharge marks

Cause analysis:

1: The number of patients in some departments is large, and the workload of nurses increases.

2: There are more new nurses with less clinical experience. Although the overall training has been carried out, the awareness of disinfection and isolation is still insufficient.

3. Nurses' subjective learning initiative is poor, and they can't consciously update their professional knowledge and stay at a lower level. The handwriting is scrawled, so my overall quality needs to be improved.

4. Some nurses in charge are not responsible enough, and they are careless.

5. Individual head nurses neglected the quality management of departments.

corrective measures:

1. strengthen the quality management of departments, urge the head nurse to strengthen the management of nurses, and assign special personnel from each department to sort out the nursing medical records, so as to achieve no smearing, scratches and omissions.

2: While the nursing department trains new nurses, all departments carry out training for new nurses, enhance nurses' awareness of disinfection and isolation, and strictly carry out aseptic operation.

3: criticize and educate nurses with poor sense of responsibility, rectify within a time limit, and issue a series of rectification measures, and the nursing department regularly conducts spot checks on nurses in the department.

personal summary of quarterly work is 9 words. 2

It is my opportunity to come to the company, so that I can come to such a happy place. During this working time, I got the help from everyone in the company, successfully completed my work tasks, and gained a lot in my work. It is necessary to make a summary.

1. Difficulties encountered at work

Everyone will encounter difficulties at work, and I am no exception. I didn't put my position right at first, but I always maintained my previous mentality. Facing the company's work, environment and people, I didn't put my position right, and I always put it in an outsider's place. However, I didn't integrate myself into my work for a long time. Because everything is so strange, it is hard for people to accept at the moment, so that the work can not be carried out smoothly, and I feel very uncomfortable. I don't know that I have been depressed, dripping, and angry with myself, and I feel that I have nothing, and I can't do simple work well. Time is a good medicine to heal wounds. After working for a long time, I have gradually adapted to the work, put my position right and do what I should do.

second, cooperate with team work

work cannot be done well by one person. We need to work hard to do our own work and do a good job of pushing the group. In the company, we will always be a team, and a lot of work needs to be done by the team. * * * Work hard together. A person's strength is like a chopstick, which is easy to break. A team. The strength of the team is very strong. When I work, I will actively cooperate with the team work. I am proud of the team, let myself integrate into the team, work hard with the team, achieve the goal, pay attention to the honor of the team, abide by the discipline of the team, safeguard the dignity of the team, and make the work easier and simpler through team work.

Third, strengthen your own construction

Being strong is the key, otherwise, whether in a team or in an enterprise, you will never be able to do a good job if you are not strong enough. Therefore, I actively participate in the training arranged by the company, study the knowledge during the training, strive to learn and use it well, and constantly apply what I have learned to my work, so that I can master and understand myself through work, and work and study with a positive attitude. Ask the old-timers for advice, let them guide themselves in their spare time, and make continuous progress through continuous accumulation, so that they can always make up for what they can't do at work, so that they can face all kinds of difficulties independently and have confidence and perseverance to do well.

Fourth, do your job well

Be serious at work, do your work carefully and carefully, sum up through continuous work, solve your own problems at work, stick to your original heart at work, be unmoved by foreign objects and be unaffected by other factors, do your job well, don't want to be slippery, don't be lazy, take it seriously, and work hard, and don't be distracted at work. Give the enterprise a perfect answer sheet, do what you should do, do your job well, and check it frequently after work to prevent loopholes or mistakes in the process of work and ensure the quality and quantity of your work.

I always keep this open-minded and eager to learn in my work, and work hard to avoid problems in my work. In the future, I will always work in the current way.

personal summary of quarterly work is 9 words. 3

In a blink of an eye, the first quarter has passed. With the guidance and help of the company's leaders and the strong cooperation of various departments, the production department has successfully completed the tasks delivered by the company. Let's report and summarize the work of the production department in the first quarter to the company's leaders.

1. Completion of production indicators:

1. * * * In the first quarter, 2,361 transformers and 2,945 APG insulators were produced, which was significantly increased compared with the same period of last year. The comparison is as follows:

2. Management:

1. Strengthen the safety responsibility awareness of production line employees, conduct extensive safety education, and strengthen monitoring and rectification of equipment with serious safety hazards. Regular maintenance of voltage and current winding machines, pouring equipment and APG equipment, with clear responsibility assigned to people, can fundamentally reduce the occurrence of accidents and ensure the normal production.

2. Strengthen the daily production process management, the "5s" standardized management and team building in the production workshop site, rationally allocate production resources, track the completion of each link, and ensure that there is no disconnection and slowdowns in the production link. By further standardizing the process, especially rationalizing the problems existing in the connection between processes, the production process can be tracked in time, and the problems existing in the production process can be solved in time, so that the production process is more reasonable and smoother every week.

Strengthen the management of the production site, rearrange the production area for the winding workshop, pouring workshop and work station appliances according to the "5s" requirements, and formulate the workshop hygiene management regulations, which clearly require the placement of work station appliances, the protection of running cars and coils, the placement of molds, the cleaning of equipment, and the return of raw materials to the warehouse, so as to ensure that the waste generated on the day of loading, demoulding and pouring can be bagged and cleaned out of the workshop in time to ensure the environmental sanitation of the workshop. With the strengthening of on-site management, the environmental sanitation of the workshop has been obviously improved.

In the process of team construction management, the team meeting is held every week to convey the company's spirit seriously, so that the workshop staff can truly understand the company's development requirements, goals and prospects, and the team management is further standardized through monthly scoring and other assessment methods, and the work enthusiasm is greatly improved.

in the third and first quarter, the production department mainly focused on the following two aspects:

(1) Energy conservation and emission reduction:

1. Carry out extensive publicity and education to enhance the awareness of energy conservation and emission reduction. Organize various publicity and education activities to publicize the importance of energy conservation and emission reduction, further strengthen the resource awareness and conservation awareness of cadres and workers, and advocate a frugal and civilized lifestyle. Everyone is a propagandist, implementer and executor of energy conservation and emission reduction.

2. Refine energy saving and emission reduction measures, and strive to reduce energy consumption and expenses. Power-saving measures:

(1) Turn on ovens and equipment as little as possible. When it is really necessary to turn them on, the departments and teams will work out production plans and organize them carefully so that every point can be put into practice.

(2) make full use of natural lighting during the day and minimize the use time of lighting equipment; Turn off the lights when you leave the work area.

(3) Try to reduce standby energy consumption, and turn off the power supply of electrical equipment such as ovens, winding machines and casting equipment when they are not used for a long time.

(4) Turn off the power of all equipment when off duty.

Water saving measures:

(1) Turn off the faucet in time after washing your hands.

(2) put an end to the phenomenon of "leakage".

Measures for saving raw materials:

(1) Picking materials shall be carried out by a special person in strict accordance with the details of materials used.

(2) there should be a special person to manage the raw materials brought out of the warehouse.

(3) For bulk materials such as resin, copper wire, copper bar, copper tape, insulating materials, etc., we should start from the source and start from the individual, so that every material can be used in practice.

(4) Strengthen the training of employees' skills, improve the operation level and effectively reduce material consumption.

3. Formulate corresponding reward and punishment measures. Supervise and inspect the use of resources, and severely criticize those who cause serious waste and hold the responsible persons accountable. Those who strictly implement the above-mentioned saving regulations will be praised throughout the company and given certain material rewards. All staff should not only consciously participate in energy-saving and consumption-reducing activities, but also actively supervise the waste of resources, and everyone should strive to be a model leader in energy-saving and emission reduction.

4. Strengthen organizational leadership

In order to effectively carry out energy conservation and emission reduction work, a leading group for energy conservation and emission reduction work was established, and under the unified organizational leadership of the company, organizational leadership was effectively strengthened according to the division of responsibilities; It is necessary to fully understand the significance of strengthening energy conservation and emission reduction from a strategic and overall perspective, conscientiously do a good job in energy conservation and emission reduction, and implement work responsibilities; Organize various publicity and education activities to enhance the sense of urgency and responsibility of resource conservation; Advocate the establishment of a scientific consumption concept, form a good atmosphere of saving glory, wasting shame and careful calculation, and actively create a "everyone saves, everything saves, everywhere saves, and the ring saves" to ensure the effectiveness of energy conservation and emission reduction.

(2) On-site management:

In order to standardize the on-site hygiene management of the production workshop, the hygiene management of personnel and the hygiene control in the production process, the corresponding management system is formulated.

carry out daily cleaning, sorting and returning, and conduct thorough cleaning and cleaning once every Friday, and the workshop director and office staff will supervise, inspect and assess. Equipment, tools, finished products, semi-finished products, raw materials, etc. shall be placed according to the regulations of the workshop.

1. On-site sanitation management

(1), floor, wall and fixtures are clean

(2), the floor is clean, free of dust, garbage, stains, water and dead corners.

(3) The walls (corners) and ceiling shall be clean, free from pollution, cobwebs and dead corners.

(4), doors and windows are bright and clean, without dust, stains and cobwebs.

(5), tables and stools should be kept clean, and articles should be neatly stacked.

(6), pools and underground waterways are clean, with smooth drainage and no blockage.

(7) Keep the visual signs on site clean and free from stains.

(8) The responsibility area around the workshop is clean, free of garbage and cigarette butts.

(9) Toilets and hand washing places shall be kept clean, with no accumulated water on the ground and no stains on the wall.

2. Clean the equipment

(1). Keep the equipment clean and free of oil stains (including fire-fighting equipment). Keep the measuring instruments clean inside and outside without stains.

(2), unused equipment, production tools (including various measuring instruments and transfer facilities, etc.)

(3), regular cleaning, daily maintenance of equipment and pipelines without stains once a week, including cleaning and cleaning, so that the surface is visually free of dust, oil stains, stains and other foreign bodies.

3, tools, materials cleaning, sorting

(1), tools, containers, weighing instruments, handling tools, etc. shall be placed neatly in the designated place and kept clean.

(2), operating tools, containers, etc. should be cleaned before and after use without stains.

(3) Wipe the bottom (plate), cursor and weight of weighing instrument before and after use.

(4) Clean up unused raw materials and auxiliary materials in time and pile them up neatly.

(5) Keep all kinds of semi-finished products clean with transfer boxes, conveying plates and garbage bins.

(6), product packaging (plastic bottles, plastic buckets, product labels and cardboard boxes) should be kept clean and tidy.

4, waste, garbage cleaning

(1), waste, defective products according to the designated place to store neatly; Industrial waste that cannot be put into the dustbin must be cleaned regularly (once every two hours).

(2) The garbage generated during work must be put into temporary storage bags and boxes in the workshop, and the garbage in the production area should be cleared out of the workshop every afternoon (before work).

(3) Employees are not allowed to wear watches, rings, earrings and other items, make-up or wear perfume during work.

(4) Employees should dress correctly, their hair should not be exposed, their clothes and hats should be clean, and their work shoes should be kept clean, so that they should be washed and changed frequently.

(5) Before going to work, production personnel must change into work clothes and wear working caps in the locker room; The deployment personnel shall dress according to the regulations and bring other protective articles (such as wearing masks when polishing).

5. Inspection and assessment

The workshop director is responsible for internal inspection of the workshop hygiene work, and promptly urges employees to make corrections when problems are found, which will be included in the individual's monthly work performance assessment.

in the future work, our production department should strengthen its study, constantly improve its own operational quality and management level, strengthen its professionalism, strengthen its sense of responsibility and improve its work efficiency.

personal summary of quarterly work 9 words 4

In this school year, I have been teaching and educating all students, being a teacher, taking students as the main body and cultivating students' active development as the center.