Joke Collection Website - Bulletin headlines - The deeds and awards of Qinghai-Tibet railway workers in 25, which touched the top ten people in China

The deeds and awards of Qinghai-Tibet railway workers in 25, which touched the top ten people in China

1. Deeds: The Qinghai-Tibet Railway runs through the hinterland of the Qinghai-Tibet Plateau, with 5 kilometers of no-man's land, cold and lack of oxygen, harsh natural conditions, complex geology and widespread frozen soil. The technology is very difficult and the project is very arduous. Since the construction of the Qinghai-Tibet Railway, the vast number of builders have fought, dedicated and made meritorious deeds on the plateau, and have written magnificent poems on the "roof of the world".

2. Awarding words: Whenever the whistle passes through Tanggula Pass, the snow-capped mountains, frozen soil, glaciers and herds of Tibetan antelopes on the plateau will miss them, and miss those powerful hands and strong smiles. They can drive steel and care for life. They are brave on the top of the earth, and they have created the greatest railway in the world!

Extended information:

1. Qinghai-Tibet Railway is listed as one of the four landmark projects in the Tenth Five-Year Plan, ranking first among the 12 key projects in the western development. China foreign media commented that the Qinghai-Tibet Railway "is the most difficult railway project in history" and "it will become one of the most spectacular railways in the world". Pushing Tibet into the railway era has strengthened the temporal and spatial ties between Tibet and the mainland of China, and stimulated the economic development of the Qinghai-Tibet Belt, which has been called Development Road, Unity Road and Happiness Road.

2. Political significance of Qinghai-Tibet railway construction: Tibet is located in the southwest of China, bordering India, Pakistan, Nepal and other countries, and its geographical position is very important. The completion and operation of the Qinghai-Tibet Railway has shortened the land transportation time of trade between major cities in China and Nepal from 12 to 18 days to less than one week, promoted the economic development of Nepal's backward northern mountainous areas, and helped Nepal to appear on the world political stage independently. At the same time, the Qinghai-Tibet Railway strengthens the links between other vast areas of China and Tibet, promotes cultural exchanges between Tibetans and other ethnic groups, and strengthens the needs of national unity. ?

3. The Qinghai-Tibet Railway was completed in two phases. The first phase started from Xining City in the east and Golmud City in the west. Construction started in 1958 and was completed and opened to traffic in May 1984. The second phase of the project starts from Golmud City in the east and ends in Lhasa City in the west. It started on June 29th, 21 and was opened to traffic on July 1st, 26.

Qinghai-Tibet Railway runs from Xining Station to Lhasa Station; The total length of the line is 1956 kilometers, including 814 kilometers from Xining to Golmud and 1142 kilometers from Golmud to Lhasa. * * * There are 85 stations with the designed maximum speed of 16 km/h (Xining-Golmud section) and 1 km/h (Golmud-Lhasa section). As of March 215, the operating speed of Qinghai-Tibet Railway was 14 km/h (Xining-Golmud section) and 1 km/h (Golmud-Lhasa section).

Reference: Baidu Encyclopedia _25 touched the top ten people in China.