Management system of hazardous waste temporary storage room

Legal analysis: Article 1 The temporary storage room for hazardous wastes must be managed by a special person, and no one can enter without permission.

Article 2 Temporary storage rooms for hazardous wastes shall not store wastes other than hazardous wastes.

Article 3 When hazardous waste is stored to a certain amount (more than 2 tons), the management personnel shall promptly notify the safety and environmental protection department to go through relevant procedures and send it to a qualified unit for treatment.

Article 4 The waste generating unit shall store it in the hazardous waste room at the allowed storage time (before work every Friday), and in case of holidays, it shall store it the day before the holidays. When sending the waste into the hazardous waste temporary storage room, the waste generating unit should carry out unified packaging (liquid barrels and solid bags) to prevent leakage, and label them separately to indicate the name of hazardous waste.

Article 5 Hazardous wastes generated by waste generating units must be weighed every time they are sent to the hazardous waste room, and the management personnel of the hazardous waste temporary storage room can register them in the warehouse after verification, and both parties sign for confirmation.

Article 6. All waste generating units shall be put into storage with the receipt, and shall not be put into storage without the receipt, and the competent department of environmental protection shall conduct regular inspection.

Seventh different types of hazardous waste should be stacked separately, and the name of hazardous waste should be marked in the storage area, and it is not allowed to be mixed.

Article 8 There should be a handling channel between each pile, and the handling channel should be kept unobstructed and clean.

Article 9 The management personnel of hazardous waste room shall keep records of hazardous waste, which shall specify the name, source, quantity, storage date, storage date and the name of the receiving unit of hazardous waste, and the records shall be summarized once a year.

Article 10 During the temporary storage of hazardous wastes, the competent authorities shall conduct regular inspections to prevent leakage accidents.

Eleventh hazardous waste temporary storage room management personnel must regularly check hazardous waste packaging and storage facilities, found damaged, should take timely measures to clean up and replace.

Article 12 All warning signs in the temporary storage room of hazardous wastes shall be ensured not to be damaged or lost. The manager shall report in time.

Legal basis: People's Republic of China (PRC) Environmental Protection Law.

Article 40 The State promotes clean production and recycling of resources. Relevant departments of the State Council and local people's governments at all levels shall take measures to promote the production and use of clean energy. Enterprises should give priority to the use of clean energy, adopt technologies and equipment with high resource utilization rate and low pollutant discharge, as well as technologies for comprehensive utilization of wastes and harmless treatment of pollutants to reduce the generation of pollutants.

Forty-first facilities for pollution prevention and control in construction projects shall be designed, constructed and put into use at the same time as the main project. Facilities for the prevention and control of pollution shall meet the requirements of the approved environmental impact assessment documents, and shall not be dismantled or left idle without authorization.

Article 42 Enterprises, institutions and other producers and operators that discharge pollutants shall take measures to prevent and control environmental pollution and harm caused by waste gas, waste water, waste residue, medical waste, dust, malodorous gas, radioactive substances, noise, vibration, light radiation and electromagnetic radiation generated in production, construction or other activities. Enterprises and institutions that discharge pollutants shall establish a responsibility system for environmental protection, and clarify the responsibilities of the person in charge of the unit and relevant personnel. Key pollutant discharge units shall install and use monitoring equipment in accordance with relevant state regulations and monitoring norms, ensure the normal operation of monitoring equipment, and keep original monitoring records. It is strictly prohibited to illegally discharge pollutants through concealed pipes, seepage wells, seepage pits, perfusion or tampering with or forging monitoring data, or through the abnormal operation of pollution prevention facilities to avoid supervision.