Joke Collection Website - Bulletin headlines - Inspector's annual work summary

Inspector's annual work summary

When inspectors sum up their work in the past year, they will find that this year's work has achieved good results, but there are also some shortcomings. The following is the Inspector's Annual Work Summary compiled by me for your reference only. Welcome to reading.

Inspector's Annual Work Summary (1) If I use one word to describe my 20xx years, I think it should be-enrichment. Over the past year, words such as pipeline positioning, valve well, pressure regulating box and rectification have appeared in my works. Cooperate with colleagues in inspection department, engineering department, comprehensive coordination department and voltage regulation center to do their jobs every day; Although architecture has great mobility to people, I still know most of it. With the freezing of Yitong River, the year's work will be over. Now I will summarize my work in the past year as follows:

I. Work situation

1, pipeline positioning work: this year, * * * carried out pipeline positioning x times and measured more than x kilometers on foot; Externally, it has assisted PetroChina and Sinopec units in pipeline positioning for many times; Internally assist the engineering department, supervision office, gas office maintenance center and comprehensive coordination office to locate pipelines; We have made our own efforts for engineering construction, emergency maintenance and pipeline protection. This year, because the pipeline locator returned to the factory for maintenance for one and a half months, the pipeline locator was newly purchased by the inspection office, and I participated in the rectification. The number of pipeline locators decreased compared with the previous year, but each pipeline locator task was successfully completed.

2. Rectification of valve well and pressure regulating box: This year, I participated in the rectification of potential safety hazards of valve well and pressure regulating box from the middle of X year to the end of X year; * * * Rectification of pressure regulating box (installing guardrail, paving square brick, brushing guardrail, anti-corrosion of foot) and valve well. I am mainly responsible for the contact between the construction team and various departments, leading the construction team to inspect the construction site step by step, assisting the rectification team leader in the inspection during construction and acceptance after construction, and collecting and sorting out data. After X months of rectification work, the expected rectification work goal was completed.

3. Other work: I participated in a number of large-scale dangerous operations this year, and was responsible for on-site safety monitoring and gas detection using leak detectors during dangerous operations; Participated in many rescue work, such as emergency repair of oversized X pipeline; And cooperate with other daily work of department leaders.

Second, harvest

The coming year is also my most rewarding year. Through continuous practice, I can be more skilled in using pipeline locator, leak detector and other instruments. Able to independently complete some tasks assigned by leaders. Through one year's pipeline positioning work, I am more familiar with the location of some pipelines; Through the rectification work, I am not only familiar with the geographical location of some users, but also familiar with the location of pressure regulating box and valve well, which has accumulated a valuable wealth for my future work.

A whole year has passed, and a brand-new year is coming. In the future work, I will work harder to learn from my leading colleagues around me, learn their experience and some new knowledge, and apply them to my daily work. I will work harder to add confidence to the beautiful blueprint of safe production!

Inspector's Annual Work Summary (II) Since the construction of xx Expressway started in 20xx, the xx Expressway Construction Office has attached great importance to safety production, and can carry out its work in strict accordance with the spirit requirements of the office quality supervision station and the relevant safety documents of the group company. So far, there has been no safety accident. The following is a summary of the specific safety work and safety production layout of xx Expressway Construction Office in 20xx:

? ? A, production safety management system

After the commencement order was issued on xx, xx, our office immediately organized personnel to study and issued guidance documents such as Measures for the Administration of Safety Production in XX Section of Expressway, Detailed Rules for the Administration of Safety Production Expenses in XX Section of Expressway, and forwarded them to the provincial government, quality inspection station, Safety Protection, Safety Site and other documents. According to the characteristics of this project, various safety production management systems have been formulated, so that all operators have rules to follow in safety production and feasible reward and punishment methods. Implement the principle of "who is in charge of production", make sure that someone is in charge of production safety, arrest people at all levels, and put an end to illegal operations.

In accordance with the requirements of the relevant documents of the quality supervision station of our bureau, our bureau established the safety production committee and the safety production office, determined the safety management system with the director of the construction office as the head and the safety engineer as the head, determined the special person to pay attention to safety, carried out the safety production inspection regularly and irregularly, rectified in time when hidden dangers were found, and always kept the safety work under control.

In addition, our bureau organized xx expressway project safety management personnel to participate in safety training courses, strengthened safety education and on-site safety knowledge training for all personnel, improved the safety awareness of all personnel, and conducted safety technical disclosure according to the characteristics of various professions.

The Construction Office regularly and irregularly inspects the safety work of the whole line, and often presides over safety meetings to report the inspection situation, requiring all construction units to pay more attention to the ideological situation, focus on the implementation of problems, and establish the awareness of safety alarm bells. Details are as follows:

1, set up a production safety emergency leading group with the director of the construction office as the team leader, the director as the deputy team leader, and the senior resident and project manager as the team members. Unified leadership, coordination and command of xx expressway construction project construction safety production emergency work.

2, "safety site" construction standard assessment. Organize the Construction Office and the contractors of xx Project to seriously study the contents of the Assessment Standard for Safety Construction Site Construction of Key Highway and Waterway Projects in X Province, master the key points of compliance inspection, and carry out the self-assessment work of compliance assessment of X Project as required.

3 to carry out a number of safety activities with the theme of "year of safety production" and "month of safety production". We will strengthen the work of safety production by organizing photo exhibitions of safety accidents, publicity and education days of "Safety Production Month", learning safety accident warning and education films, carrying out "I make suggestions for safety", selecting "safety star teams, safety star team leaders, safety star employees", "youth safety production demonstration posts" and "online safety knowledge competition" and other popular forms.

4. Organize emergency plan drills. The construction unit is required to carefully prepare the emergency plan drill plan according to the emergency plan drill plan, actively organize emergency rescue drills, summarize them in time, and take effective measures to further improve the emergency system and improve the emergency handling capacity.

5. Carry out safety inspection and rectification of potential safety hazards. The Construction Office requested the Municipal Safety Supervision Bureau to further implement the implementation of safety management rules and regulations through comprehensive and in-depth inspection, especially the potential safety hazards of special equipment such as temporary electricity consumption, construction machinery, sidewalk (border protection), pile digging, blasting operation, high slope construction and gantry crane.

6. By requiring the General Office to prepare the xx implementation plan, fully mobilize the supervisory role of the supervisor to ensure the formation of a long-term mechanism for safety work.

Second, the shortcomings and problems in the work of production safety

1, the temporary electricity consumption is not standardized, and it is impossible to achieve "one machine, one brake, one box leaking";

2. Warning signs and signs are insufficient and not set in time;

3. Limit devices are not installed at both ends of the gantry crane track;

4. The number of full-time security officers is insufficient;

5, foundation pit excavation protection is not timely, serious damage;

6, the construction site is still not wearing a helmet phenomenon;

The above problems were notified to the construction unit in the form of safety rectification notice, and the rectification was in place.

Three. 20xx Work Plan for Safe Production

1, pay special attention to safety publicity, education and training, and enhance the safety awareness of all staff; It is required to hang safety production banners in office areas and construction sites, improve the awareness of safety production of cadres and workers, and create a safety production atmosphere that is well known, concerned and valued by everyone;

2, pay special attention to the construction of long-term mechanism of safety production, and further improve the management level of safety production; First, establish a safety organization system, clarify the target responsibilities, further strengthen the establishment of safety production institutions, the staffing of safety production personnel and the construction of safety production management networks to ensure that safety production organizations are in place. Second, in accordance with the provisions of the "Safety Production Law", fully implement the project leader's first responsible person for safety production; According to the principles of "who is in charge and who is responsible" and "safety must be in charge of production", the project leader has a comprehensive system of "one post and two responsibilities"; Third, strictly control production safety accidents; Fourth, strengthen the long-term effectiveness of safety management mechanism and establish long-term early warning awareness of safety production;

3. Continue to strengthen the management of safety work, ensure that safety personnel and various safety management functions are in place, put safety at the same height as production, and thoroughly correct the phenomenon of emphasizing construction but not safety;

4. New employees who are required to participate in the construction must carry out "three-level education";

5, continue to pay special attention to the hidden dangers rectification and major security risks in time to eliminate or take effective preventive measures. The main problems existing at present should be studied and solved;

6. Increase the frequency of regular and irregular safety inspections, pay special attention to the investigation of potential safety hazards, and focus on the rectification and implementation of potential safety hazards;

7, to further strengthen the unit early warning method and the study and education of "safe site";

8. Strengthen the education and inspection of flood control, lightning protection and gale safety, and put the responsibility on people and implement a 24-hour duty system.

In a word, we will continue to adhere to the safety production inspection and hidden danger investigation of the third bid section of xx line, so that all project participants can "sound the alarm and prevent delay" and always implement the policy of "safety first, prevention first" to nip all kinds of hidden dangers in the bud, put an end to all kinds of accidents and ensure the safe and harmonious development of engineering construction.

Inspector's Annual Work Summary (III) In 20xx, I adhered to the principle of "stressing learning, politics and righteousness", and always took plain, willing to pay and obscurity as my own criteria; In-depth study, constantly improve the ability to observe, analyze and deal with problems, enrich yourself with all aspects of knowledge, speed up the updating of knowledge, and enhance the ability to deal with emergencies.

First, pay close attention to quality work when the output rises.

Historical experience tells us that the biggest problem when the output rises is the conflict and contradiction with the quality problem. In the past, the production process could not be effectively controlled, the quality monitoring could not reflect the quality status in time, and the quality status lacked effective data evaluation, which led to the unclear quality level and self-control in the production process and the exposure of products to customers. Based on past experience, at the beginning of this year, the workshop took the initiative to investigate quality hidden dangers, analyze quality reasons, solve quality problems, and predict users' use of products with accurate data. In response to this idea, I took the initiative to take a series of measures to solve the quality hidden dangers that occurred and may occur on the spot that day; Effectively track and control the process indicators, strengthen and refine the quality management, establish a rectification system, increase the effectiveness of inspection, improve the warning effect, plug the loopholes in quality control in time, and analyze the quality status and areas that need improvement in time by strengthening the process quality control and adhering to the implementation of quality work; By carefully checking the process discipline, the current hot issues are solved, and the production process is controlled in time; Warnings will be given to the problems that often exist in the past, and they will be distributed to all teams and groups in written form, emphasizing the importance of quality control. Achieved: personnel implementation, system implementation, responsibility implementation, task implementation, inspection implementation. Firmly establish the quality concept of "quality is in my hands, users are in my heart" and "it is everyone's responsibility to revitalize quality", and establish the consciousness that customer satisfaction is the ultimate standard of quality.

Second, strengthen the study of professional knowledge, and constantly enrich their business knowledge.

For me, the workshop is a brand-new unit. In order to adapt to the environment as soon as possible and carry out my work better, I strive to adhere to the learning-oriented adaptation idea of "learning from people and books": on the one hand, I humbly ask old comrades to standardize my work attitude through their enthusiasm and enthusiasm for work; On the other hand, we should carefully study the books and magazines such as Production Technology Monthly, Alumina Production Equipment and Technology, Modern Enterprise Management and so on, draw nutrition from them, and strive to master the professional knowledge about quality, so as to shape ourselves into a qualified quality inspector in the shortest time.

Third, other work.

I also work part-time in workshop statistics, taking "strengthening management and paying close attention to quality" as the starting point to ensure the accuracy of statistical statements and the timeliness of statistical analysis. In order to improve the quality of annual statistical work and statistical analysis, constantly strengthen and improve their own quality, self-study statistics and other books. In statistical analysis, we should strive to be comprehensive and consistent with the key points. On the basis of comprehensive analysis, carefully analyze the outstanding key issues and report the changes of main indicators to the workshop leaders in time, so as to understand and master the production trends in time.

Fourth, shortcomings.

Over the past year, I have made some efforts, and with the care and support of leading comrades, I have made some achievements, but there are still many gaps from the requirements of leading comrades:

1, insufficient communication with leaders at work.

2. Because I am young and lack of work experience, I lack courage in my work. Lack of comprehensive coordination ability, work organization and command is not firm enough.

3. There are some shortcomings in the specific work, such as insufficient inspection and low work enthusiasm. Sometimes you don't consider the problem comprehensively enough and deal with it carefully enough. Not enough study, not wide knowledge.

All the above needs to be overcome, further improved and improved in the future work.

In a word, I have fulfilled my duties as a quality inspector in my post and achieved certain results. But the achievements only belong to the past, and the focus of next year's work is to ensure the stability of product quality first; Secondly, the quality is stable and high, so the product quality will go to a new level. Improve personal work management ability and make your own contribution to adapt to the rapid development of the branch. I will meet new challenges, cherish new opportunities, foster strengths and avoid weaknesses, do a good job and strive for new progress!