Joke Collection Website - Bulletin headlines - Report on political management and maintenance in the first half of the year
Report on political management and maintenance in the first half of the year
Report on the work of maintaining political stability in the first half of the year 1 According to the spirit of the Notice of the Office of the Municipal Security Committee on Preparing to Hold the Materials for the Centralized Work Conference of the City's Safety Inspection, the safety inspection work in the first half of the year is now reported as follows:
First, the first half of the production safety inspection work.
(a) held the first and second quarter of production safety work conference.
In order to strengthen the work of safety in production, our bureau has held 23 meetings on safety in production of municipal management systems. 20XX city management system safety production work analysis meeting and the first and second quarter safety production work meeting were held successively. Deputy Director Pang, the leader in charge, conveyed the spirit of the municipal safety work conference, summed up the work this quarter and deployed the work of safety production in the next quarter. Director Li Yuxin made important instructions according to the actual work, and worked hard to build? Peace and harmony? The city Council pointed out the direction for the work of safety in production.
(two) to carry out safety inspection work.
1. Do a good job in the management and maintenance of municipal infrastructure
In order to do a good job in the management and maintenance of municipal infrastructure, our bureau focuses on the safety hazards of bridges, guardrails and pavement manhole covers, and comprehensively carries out the investigation and management of safety hazards. In accordance with the relevant provisions of bridge maintenance, strengthen the inspection management of six bridges including Xijiang Bridge, Xiaojiang Bridge, Qili Bridge, Radish Bay Bridge, Xian Yi Road Li Yujiang Bridge and Majiatang Bridge. Improve the bridge emergency plan and set up a bridge emergency team. Carry out bridge-related knowledge training and emergency drills to further improve the ability to deal with unexpected accidents. Focus on strengthening the inspection and monitoring of Li Yujiang Bridge, set up restriction boards at both ends of Li Yujiang Bridge, rebuild roadblocks, restrict the passage of overweight vehicles, arrange inspection personnel of Bridge Maintenance Brigade to inspect the bridge every day, and make inspection records to ensure the safe operation of Li Yujiang Bridge. Investigate the safety hazards of roads and ancillary facilities in other urban areas, especially check whether the manhole cover is damaged, missing and covered in time; Whether the damaged guardrail is repaired and replaced in time, and check the safe use of guardrail. 9 manhole covers13 have been repaired, 39 inspection wells have been repaired, 4 damaged guardrails 14 have been dealt with in emergency, 287 guardrails (767.5m) have been replaced, 2,092 m have been replaced, and 29 damaged guardrails have been repaired in emergency.
2. implementation? Should I be punished for violating the rules? Special action
According to the Municipal Safety Committee's "Guigang City Concentrates on the Field of Safety Production? Should I be punished for violating the rules? The implementation plan of the special action requires that the whole city systematically carry out the field of safety production? Should I be punished for violating the rules? Special operations. The first is to carry out special inspections of water supply. From April 27th to 28th, led by the municipal government, the city's gas safety special inspection was carried out in conjunction with safety supervision, municipal administration, quality supervision, fire protection and other relevant departments. All water supply management departments should check whether the key facilities such as water intake, water supply transmission and distribution network, water-making chemicals delivery point, water distribution well, filter, clean water pool and water-making chemicals warehouse are in good condition. Whether the water supply plants within the jurisdiction are perfect and in normal operation, and whether the water quality monitoring system is in normal operation. For the hidden dangers found in the inspection, the Notice of Hidden Danger Rectification shall be issued immediately, and a written rectification plan shall be formulated immediately to determine the rectification measures, rectification period and responsible person. The second is to carry out special inspections of gas supply. From April 22nd to 24th, led by the Municipal Bureau, together with the Municipal Safety Supervision Bureau, the Municipal Quality Supervision Bureau, the Municipal Fire Brigade and other departments, two inspection teams were formed to conduct a thorough investigation on the potential safety hazards of 10 gas enterprises, 2 gas pipeline companies and 23 bottled liquefied gas supply stations in Guiping City, Pingnan County, Gangbei District, Gangnan District and Tantang. Through discussion, data consultation and on-site inspection, the safety responsibility system and operating rules of gas enterprises are discussed. Certified personnel and education and training; Safety management of production and business premises; Investigation and rectification of hidden dangers; Inspection of gas pressure regulating box and underground pipe network; The establishment and exercise of accident emergency plan and the configuration of emergency rescue institutions and facilities; Conduct a comprehensive inspection of seven aspects, including safe gas management and family safety inspection. Eight hidden dangers of general accidents in water supply enterprises and 438 hidden dangers of general accidents in gas supply enterprises were investigated. All hidden dangers of general accidents were rectified, and the rectification rate reached 100%.
3. Pay close attention to safety inspection in public places.
Adhere to pay close attention to the safety inspection of Nanshan Scenic Area, Donghu Scenic Area, Macaojiang Ecological Park, National Cultural Park, Square and other crowded places. Check the amusement facilities every month, but these facilities belong to mechanical facilities, which have mechanical wear and may have potential safety hazards at any time. To this end, the park department of our bureau implements department leaders to conduct pre-holiday investigation and regular monthly inspection before major holidays to eliminate potential safety hazards that may occur at any time due to high frequency of use, and repair and rectify problems in time when found. Regularly check whether the custody of amusement facilities and zoos has factory certificate, amusement facilities safety inspection certificate, large-scale amusement facilities operation certificate and domestication certificate. Without relevant certificates, it is not allowed to operate, and the daily safety inspection records are kept by special personnel. Find the problem and rectify it immediately. Park scenic spots have a large flow of people and complex personnel composition, which is prone to public security incidents such as robbery. In order to strengthen management, the park department arranges security guards to be on duty 24 hours a day and strengthens patrols in key areas.
4. Strengthen the on-site management of projects under construction.
The construction site of the project under construction was inspected, and the construction unit was urged to do a good job in the construction site enclosure and set up various warning signs to achieve civilized construction. In order to reduce the traffic congestion during the construction of Zhongshan Road and Jiangbei Avenue, no parking signs and signs reminding vehicles to bypass were added at the intersections of South Ring Road, South Station, 1965438, Xian Yi Road and Jiangbei Avenue, Yingbin and Jingang Avenue 12 to remind vehicles to bypass and reduce the traffic pressure caused by road construction.
5. Timely implementation of flood control and typhoon prevention.
According to the spirit of the Emergency Notice on Strengthening the Response to Rainstorms and Floods, our system has done a good job in flood control, typhoon prevention and flood fighting in time, carried out a flood control safety inspection, found out the weak links in flood control, and took timely measures to rectify the safety problems found in the inspection. Each subordinate unit of the bureau has set up a defense emergency leading group, which consists of a coordination liaison group, an emergency repair group and a logistics support group. In case of heavy rain or continuous heavy rainfall, when the main roads in the city are waterlogged, the emergency team must be on duty at the responsible section, and the team leader will make overall arrangements to clean up the garbage and other blockages at the water collection wellhead of the responsible section in time. When the waterlogging is serious, open the manhole cover in time to dredge it, increase the water flow as much as possible, and be responsible for safety care. Cover the manhole cover in time before leaving. After the accumulated water is removed, report to the team leader. The staff of Zhongshan Drainage Pump Station is on duty 24 hours a day, and the drainage is started within 0/0 minute of rainstorm/kloc; At the same time, make full emergency preparations in flood season from funds and equipment to ensure the smooth flow of main streets.
6. implementation? Safety month activities?
Is it 12 in China this year? Safe production month? . 20XX will be conducted in the municipal system from May 30th to June 30th. Safe production month? Activities. Use posters, weekly work plans, weekly work reports and various meetings to publicize safety knowledge in a big way. At the same time, combined with the disaster risk and characteristics of our city, a disaster prevention and mitigation drill was organized according to the plan to test the emergency command, coordinated operation, emergency support, emergency communication and other capabilities of the emergency teams of all units under the Bureau.
7. Do a good job in the safe disposal of ground subsidence in downtown Guigang.
Since May this year, karst ground collapse has occurred in the sections near Jingang Avenue (Xian Yi Road to Yingbin Avenue), Xingfu Community and Armed Forces Department in Gangbei District, causing damage to municipal roads and seriously threatening road traffic safety. According to the division of responsibilities in the Minutes of the Meeting of Guigang Municipal People's Government on Studying the Disposal of Geological Disasters in Recent Urban Areas (Gui [201X] No.6), in order to properly dispose of geological disasters in urban areas and protect the safety of people's lives and property in our city, our bureau has formulated the Emergency Response Plan for the Safety of Geological Disasters in the Central Urban Area of Guigang, and carried out safety emergency response to collapse points and hidden dangers. Take signs, warning signs and billboards; Migration of green seedlings at collapse points and hidden danger points; Take safety protection work such as relocation and disposal of rainwater pipes, sewage pipes, water supply pipes, street lamps and other lighting facilities at collapse points and hidden dangers. As of July 14, our bureau organized excavation to treat 7 subsidence points, 2 hidden danger points and 5 drilling hidden danger points.
Second, the existing problems
(1) The reconstruction project of five roads is short of time, heavy in task, wide in construction area and long in line, and there are certain security risks.
(2) Gas safety, especially domestic gas, still has great hidden dangers. Some users install gas that is not standardized and use scrapped gas appliance. Because the storage and distribution station was built earlier, the buildings (structures) did not exist until after the station was built. Therefore, the safe distance between some gas storage and distribution stations and surrounding buildings and structures cannot meet the requirements of the code.
(3) There is sand field and residential pollution in the water source protection area of Guigang City, and the water quality of the water source is affected; Due to the service life of some water supply networks and the nearby environment, there are many leaks in the old water supply networks; It is difficult to ensure emergency response because of the lack of backup water sources in towns and villages; There is no special person to keep the water purification agent in the township waterworks.
(4) The foundation bolts of the street lamp of the approach bridge of Yujiang Bridge on Zhongshan Road are short, and the lamp poles are not firm enough; The Zhonghua lamp on Jingang Avenue has been worn for a long time, the anchor screws are seriously corroded and the lamp poles are not strong enough. Most of the lampshade fixing screws have rusted and the lampshade has fallen off. Street lamp lines in some small streets and lanes in the old city are aging.
(e) The drill of accident emergency plan needs to be strengthened. Although the drill has achieved good results and accumulated some practical experience, there are still some problems that cannot be ignored: there are different degrees of disconnection between the drill and the emergency plan.
Three, the second half of the work arrangement of production safety
(a) unremittingly do a good job in the investigation and management of security risks. On the basis of the carpet inspection in the previous stage, intensify the inspection and rectification, especially in public places such as squares and parks, immediately rectify the problems and hidden dangers found, and do a good job of prevention to ensure that once an accident occurs, the harm will be minimized.
(two) continue to do a good job in production safety during the flood season. Ensure material reserves, ensure the normal supply of gas and domestic water in flood season, and conduct a major investigation on the safety of municipal facilities and drainage pipe network in the central city to ensure the smooth drainage system in flood season and ensure the stability and safety in flood season.
(three) in accordance with the work arrangements of the municipal government, continue to do a good job in the safe disposal of land subsidence in the downtown area of Guigang.
(4) Arrange duty. Adhere to all-weather safety production monitoring, collect, submit and dispose of information in time.
(five) clear responsibility for production safety. To be more clear? Who's in charge? Who's in charge? Principles, strict implementation of management measures, and constantly strengthen the sense of responsibility for production safety, in order to implement the post safety responsibility, so that everyone is responsible for production safety.
(6) Improve the emergency mechanism and plan system, organize research on various emergency plans such as flood prevention and typhoon prevention, strengthen the construction of emergency teams, improve the emergency response capability of personnel, and ensure that once an accident occurs, it can be quickly controlled and rescued.
2. Report on political management and maintenance in the first half of the year. Daily municipal maintenance work
1, 2065438+engineering cost of dredging 23 main roads with 68679m from February to May 2007 1 1.35 million yuan.
2. Grid management allocated 160 municipal sporadic works in ***8 phase, including sidewalk main road damage maintenance and square environment management.
During the road inspection in March 20171-May, 838 manhole covers were damaged, and all of them have been rectified. Eliminate potential safety hazards in time.
4.65438+05,000 yuan to purchase cast iron manhole covers, complete the relevant bidding procedures, and the winning bidder has been determined. Procurement of flood control materials 1 16440 yuan has been completed.
In May and February, 783 ***69 famous-brand roads were purchased and installed, and the project cost was 1, 7 1, 000 yuan, which has been accepted at present.
Second, the recent comprehensive improvement of ditch and pond environment
Since mid-May, some gullies and ponds in our county have been comprehensively rectified:
1, the dredging length of Wuxi long ditch in Erli is 760m, and the transportation of silt weeds is 5500m? ;
2. Dredging length of East Wilder 100m, dredging length of West Wilder: 280m, and silt weeds transported out of the country: 3500m? ;
3. The yard length of Huayang Textile Factory is110m, and the dredging garbage is 5m deep, totaling 4,620m3. After dredging, the newly-built stone slope protection retaining wall is1.6m high, 4m wide at the bottom of the ditch and 7m wide at the mouth of the ditch, which is basically completed at present.
4. The total length from the outer wall of Mengdie Garden to the east side of the intersection of Qiushui Road and Dongguang Road is 563 meters. After the slope protection is reshaped, the upper mouth is 5m wide, the lower mouth is 3m wide, and the dredging garbage is 3 124 m3.
Third, the next step
1. Continue to complete the management and maintenance of municipal infrastructure according to the work plan made at the beginning of the year.
2, actively cooperate with the grid management and the mayor's hotline to do a good job in the maintenance of individual municipal sporadic projects in urban construction, and make a timely reply.
3. Strengthen the road inspection, focus on the investigation of rainwater manhole covers, and report the safety hazards to the rectification in time.
4. Do a good job in urban flood control and drainage in the coming flood season, do a good job in flood control emergency material deployment, personnel preparation, inspection and disposal scheduling, and make full preparations for safe flood season.
- Related articles
- Seeking Pairs in A Dream of Red Mansions
- Coca cola slogan
- Inspirational morning reading of high school students' vows
- Write a 300-word essay introducing the 12th part of "Monster Master"
- Congratulations on the opening of the supermarket
- Making Opening Posters ¡ª¡ª How to Design Opening Posters for Children's Photography
- What are the requirements for building renovation in Jiangdu District of Yangzhou City?
- Harvest season slogan
- Conclusion of thesis defense
- Team personal work summary