Joke Collection Website - Bulletin headlines - Minutes of project acceptance meeting?
Minutes of project acceptance meeting?
one
Meeting time: May 8, 20XX
Meeting place:
Moderator: XXX
Participating units:
Construction unit:
Investigation unit:
Design unit:
Supervision unit:
Construction unit:
Quality supervision unit:
Participants: See the meeting sign-in form for details.
The host unit introduces the relevant units and personnel attending the meeting, as well as the relevant construction situation and foundation, intermediate acceptance procedures and methods of the project.
Theme of the meeting: quality acceptance of foundation and foundation division of buildings 27 # ~ 29 #.
Meeting recorder: XXX
Meeting contents:
A, the construction unit:
1. The XXX Phase V project undertaken by our project department started on October 8, 20XX 10, and the foundation and foundation division project was completed on February 24, 20xx 10. During the construction process, the project department strictly controls the quality, strictly follows the principle of "inspection before use" when all raw materials enter the site, and rechecks the samples according to the requirements of the specification. If there are unqualified products, clear the field immediately, and it is strictly forbidden to put them into use. Before concrete construction, sand and gravel test and concrete mixture ratio test shall be carried out respectively, and concrete test blocks shall be retained according to the requirements of specifications. Although there are some problems or exceeding the standard in the construction process, after the written rectification notice or oral rectification notice is issued by the supervisor and the owner, our project department will immediately rectify it, and the next working procedure will be carried out after the re-inspection is qualified.
2. Organize self-inspection and self-evaluation, and the quality of each sub-item of foundation engineering meets the national mandatory requirements and the latest quality acceptance specifications. Our foundation and foundation engineering quality self-evaluation is qualified.
Second, the supervision unit:
During the foundation construction of this project, the raw materials, components and equipment used in the project were carefully inspected and signed in strict accordance with the supervision specifications and procedures, and all raw materials were inspected before use. For the construction of key working procedures and key parts, we all carry out on-site supervision, focusing on the acceptance of quality inspection lots, focusing on master control projects, to ensure that the construction of general projects and other parts of the project is inspected regularly or irregularly, and once problems are found, they will be rectified immediately. Through the * * * cooperation of all construction parties, the quality of the project in this division is ensured. We have checked all kinds of sub-projects of the engineering entity, and they all meet the design requirements and relevant specifications. The technical data are true and complete. According to the Unified Standard for Acceptance of Construction Quality of Building Engineering * * GB 50300-20xx * *, the division was assessed as qualified and agreed to accept.
Third, comparable units:
According to the survey company, the overall quality of the foundation of this project is good, and the bearing capacity of the foundation meets the design and specifications. After inspection, it is agreed that the foundation and foundation engineering quality of this division is qualified.
Fourth, the design unit:
After on-site inspection, the construction unit of the foundation division of the project carried out the construction in strict accordance with the design drawings, design changes and design requirements, which met the design requirements and agreed that the division was qualified.
Verb (abbreviation of verb) Construction unit:
During the construction of this branch project, the management of survey, design, supervision, construction and other units is very responsible and the service is in place. With the cooperation of all parties, the project of this division was completed with good quality and quantity, and our company is very satisfied. Concealed works such as foundation trench inspection and reinforcement of this division must be inspected by relevant parties before the next working procedure can be carried out. All raw materials have been tested before use, with good quality and complete information. Agree to evaluate the quality of the foundation and foundation engineering of this division, and agree to acceptance.
Acceptance conclusion of intransitive verbs:
Based on the opinions of various acceptance professional groups, after reviewing the construction technical data and the on-site entity acceptance, it is agreed that the foundation and foundation division of this project meet the design requirements and relevant construction specifications, and it is agreed that the foundation and foundation division of this project are qualified.
Construction unit:
Design unit:
Investigation unit:
Supervision unit:
General contractor:
two
Meeting time
20XX May 30th at 3 p.m.
meeting place
On-site meeting room
participant
Hubei xinchuyuan real estate co., ltd
Enshi zhoutiangong construction survey and design co., ltd
Hubei sanxia construction projects management co., ltd
Enshi autonomous prefecture construction project quality supervision office
Jiangsu Yancheng erjian group co., ltd
Moderator: * * * Wang Qingran * * *
Read out the project acceptance plan and introduce the personnel of the acceptance unit:
Hubei xinchuyuan real estate co., ltd
Enshi zhoutiangong construction survey and design co., ltd
Hubei sanxia construction projects management co., ltd
Enshi autonomous prefecture construction project quality supervision office
Jiangsu Yancheng erjian group co., ltd
A, the construction unit self-evaluation:
1, Korean newspaper building foundation branch.
2. After on-site quality inspection and data inspection, the construction unit thinks that the data is basically complete, the visual quality is qualified, and the quality self-evaluation of the foundation branch project supervision is qualified. If the immature concrete specimen fails to pass the later test, the constructor shall take full responsibility and apply for the next construction.
Second, the supervision unit evaluation report
Our evaluation is based on the existing laws, regulations, design drawings and changes. Our side station is in place, and the site construction materials are qualified. Data verification: all the steel products are qualified, and the concrete is not yet mature, so no evaluation is made. In order not to affect the construction period, the next working procedure is agreed.
The safety inspection is scheduled for Friday, and warning facilities such as safety slogans, safety banners and safety signs should be done well, and safety work should be done seriously. Tower crane: the tower crane foundation has soft soil to be treated, and 1# tower crane foundation is soaked in water, so it should be treated in time; 2# tower crane should be maintained and painted with antirust paint.
Quality: The stirrup spacing of the main column is too large, which should be rectified in time.
3. Geological Prospecting Unit: Agree with the opinions of the construction unit, generally impressed, and agree with the next construction.
Four, the construction unit quality evaluation:
The basic work of 10# 12# has been basically completed, and it has been accepted together with 13# and 18#. It is necessary to hand in the acceptance supervision notice quickly.
Agree with the opinions of design, geological exploration and supervision, and ask the construction unit to attach great importance to the quality of column reinforcement and grab back the construction period.
Five, Enshi quality supervision station
Agree to the acceptance of 10#, 12#, 13# and 18#, and notify three days in advance when issuing acceptance applications in the future. The data is a little behind. The final evaluation of the main body of this project is based on the results of the same test block, not the standard test block. 13# 18# earthwork compaction test report hasn't come out yet, so you must read it at the next acceptance.
Six. Construction side
Manager Han: We must improve the deficiencies and lack of information in the construction and make the construction better.
VII. Project Director Announces Acceptance Results: Supervision Engineer Symposium.
After the experience, the team agreed that the sensory quality evaluation was qualified. Because the test block is not yet mature, the quality grade is not evaluated for the time being, and other acceptance items are qualified. Agree to the construction of the next working procedure, and the constructor shall take full responsibility for the immature concrete test block.
Eight, Enshi quality supervision station:
1. Acceptance personnel, acceptance basis and acceptance procedures meet the requirements.
2. Spot check data meet the acceptance conditions.
3. All contractors agree to the acceptance and the construction of the next working procedure.
4. Not all concrete block reports have been published. In accordance with the principle of separation of test scores, agree with the acceptance opinions of the acceptance team. Our radio station recognizes this acceptance,
* * * seal of the construction unit and signature of * * * representative:
* * * Seal of geological prospecting unit * * Signature of representative:
Supervision unit * * * seal * * representative signature:
* * * Seal of the construction unit * * Signature of the representative:
three
Meeting time: September 5, 20XX
Meeting place: Office of on-site project department of Hushu Guanzhi Phase II of Wuhan Changbo Construction Group Co., Ltd.
Participating units:
Construction unit: Wuhan Hongya Holiday Real Estate Co., Ltd.
Participants: Li Xiu and Wei.
Supervision unit: Hubei Southern Supervision Co., Ltd.
Participant: Be frugal.
Designer: Hubei Zhongjiang Architectural Design Institute Co., Ltd.
Participant: Gong Jing.
Survey unit: CMC Sankan Geotechnical Engineering Co., Ltd.
Participant: Wu Ziqiang.
Construction unit: Wuhan Changbo Construction Group Co., Ltd.
Participants:, Zhou,, Wang,.
Supervision Station: caidian district Construction Engineering Quality Supervision Station.
Participants: Gao
Main contents:
Construction unit Wei:
Thanks to the leaders at all levels who participated in the acceptance of C8# and C 10# foundation projects. This project is a pile foundation. Foundation reinforcement, concrete, concrete raw materials and mix design, formwork and cast-in-place structure subdivisional work all meet the requirements of design and current construction quality acceptance specifications after inspection and acceptance. In order to meet the safety level of structural design, the general contractor of Wuhan Changbo Construction Group Co., Ltd. invited leaders at all levels to conduct self-evaluation on the basic acceptance of this project.
Construction unit week:
In the process of construction, our unit strictly controls the quality and carries out the construction according to the requirements of design and acceptance specifications. The project acceptance procedure shall be implemented according to the requirements of Hanyang District, Wuhan. The inspection system shall be implemented for the incoming materials, which shall have the factory certificate, and the construction of the next working procedure can only be carried out after sampling, sample delivery and inspection by the supervision engineer. The construction process and quality meet the requirements of design and acceptance specifications, and the project self-inspection is qualified.
Whether the supervision unit is diligent:
Since the project construction, the project has always been under control, and the construction process has passed the self-inspection of the construction unit. After being submitted to our company for review, the next working procedure can be carried out. Since the earthwork excavation construction, the quality control data and guarantee data of this project have been strictly implemented in accordance with the current relevant regulations of the state, and the whole process has been supervised. According to the comprehensive judgment of engineering appearance quality acceptance data, engineering construction management data and warranty data, the engineering quality is qualified.
Investigation unit:
Agree with the supervision unit, and agree with the acceptance of the foundation and foundation division of C8# and C 10# buildings.
Design unit:
Agree with the supervision unit, and agree with the acceptance of the foundation and foundation division of C8# and C 10# buildings.
High stationmaster of quality inspection station:
All contractors, designers and surveyors have been in place to participate in this acceptance work, and the procedures are legal and meet the requirements of the specification.
Countersign column:
Construction unit: Wuhan Changbo Construction Group Co., Ltd.
* * * Signature * * *:
Supervision unit: Hubei Southern Supervision Co., Ltd.
* * * Signature * * *:
Designer: Hubei Zhongjiang Architectural Design Institute Co., Ltd.
* * * Signature * * *:
Survey unit: CMC Sankan Geotechnical Engineering Co., Ltd.
* * * Signature * * *:
Construction unit: Wuhan Hongya Holiday Real Estate Co., Ltd.
* * * Signature * * *:
- Related articles
- Wong Lo Kat advertising slogan
- How to treat the consequences of selling fake masks in Kangbaixin Pharmacy?
- How to get out of the airport bus when arriving at Guiyang Longdongbao Airport?
- Twentieth anniversary school slogan
- What are some sentences about prayer?
- What should I pay attention to when opening a dry cleaner? What should I pay attention to when opening a dry cleaner
- How strong is LeBron James in the 20 17- 18 season?
- What does it mean that the spirit mouse takes off to send blessings and the Taurus welcomes the Spring Festival?
- Strengthen Party Spirit Cultivation Slogan
- Love books slogans and warm reminders