Regulations on safe and civilized construction projects?
1. At the construction site, set up eye-catching slogans that reflect the spirit of the enterprise and the style of the times, and set up publicity facilities such as publicity boards and blackboards to reflect various developments on the construction site in a timely manner. At the entrance of the gate, eye-catching banners and slogans reflecting the corporate spirit and the style of the times should be set up to strengthen standardized management. This part is the image window of the entire project, which not only expresses the image of the project, but also reflects the image of the overall project.
2. Carry out civilized education and ensure that construction workers abide by civilized norms. Carry out civilized construction competition activities, adopt rewards and penalties, and conduct civilized construction team evaluations.
3. The layout of various facilities must be planned according to the general construction plan and arranged by the general contractor to ensure that the layout is safe and reasonable and the site is clean;
4. On-site construction personnel They all wear uniform uniforms and badges, and must wear safety helmets when entering the construction site to maintain the company's image.
5. Strengthen team building, have a safety record of three on-the-job duties and one review, and have a good class appearance. The project department provides certain activity venues for the construction team to improve the overall quality of the team.
6. All kinds of materials should be neatly stacked in different areas, discharged in rows, and hung with eye-catching signs. Fireworks are strictly prohibited to ensure safety. At the same time, ensure that passages and entrances and exits are unobstructed; everyone has a responsibility for management and organization. obligation. Materials should be placed neatly when using and processing them. And we should be more vigilant and take good measures to prevent fire and theft.
7. The construction site must have smooth roads, flat and clean roads, no random piles, no scattered objects, and cleanliness. Each type of work must do a good job of cleaning up every day. Operators should work in sequence and strengthen hand cleaning work. Prevent littering and piles of debris, and discarded items should be stored in designated locations. The storage location of engineering materials should be in a ventilated and dry place to prevent the materials from getting damp, deteriorating and causing scrapping.
8. The working floor must be clear of finished materials, and unused materials must be stacked neatly to keep the construction site clean;
9. Garbage must be piled up and processed in a centralized manner , the drainage ditch must be kept clear, and smoking is strictly prohibited to ensure safety and no hidden dangers, prevent pollution, and prevent collision damage;
10. Do a good job in coordinating the civilized construction with each bid section, strengthen contact, and at the same time have the ability to take all aspects into consideration The spirit of contribution and sacrifice for the overall situation. Strengthen the comprehensive management of construction site security to achieve target management, system implementation, and individual responsibility. Security precautions at the construction site include effective prevention facilities at key locations.
11. In each functional area within the site layout, signboards uniformly stipulated by the company shall be set up. Set up relevant prohibition signs and safety guardrails in areas such as the wood processing plant next to the escalator.
12. Set up green safety channels in the construction area. Suspensions should be installed every 2m in the channel, and materials and tools should be piled up and down the channel to ensure that the channel is smooth and tidy.
13. Each floor is equipped with 2 1# distribution boxes and 4 2# distribution boxes. The trailers are configured as needed. Fire-fighting equipment is evenly distributed according to the regulations of 4 per 100M2 and managed by dedicated personnel. Site layout The fire-fighting equipment and electrical boxes shown in the figure: material storage yard, wood processing area, and office. If any adjustments are made, they must be submitted for review and approval according to the procedures before implementation.
14. Construction workers must treat others in a civilized manner. It is strictly forbidden to fight or use bad words to hurt others. They must speak civilized language and have a correct work style. They must abide by local public security regulations. They must respect each other, treat each other with sincerity, and treat each other with brotherly units. Help and obey management. Violators will be removed from the construction site. ;
15. The lighting design must be installed uniformly in the dormitory, and random connection of electrical equipment is strictly prohibited;
16. Actively cooperate with the regular and civilized construction inspections and evaluations arranged by the general contractor, Accept criticism humbly and actively make corrections. When working with other professional companies, cooperate with each other and strengthen cooperation. When problems arise, negotiate with each other and resolve them amicably.
17. Construction and installation must strictly abide by operating procedures, implement the production responsibility system, and communicate with the team leader and project manager in a timely manner if problems are discovered. If you insist on going your own way, causing serious waste of materials, delayed work, rework and other consequences, the parties involved will be responsible for it.
18. Commuting to and from get off work must be in accordance with the time specified by the construction team, and neither late nor leaving early. The site must be cleaned up after the construction is completed on the same day, and remaining materials must be recovered. Violators will be fined.
19. Safety protection barriers must be set up in the construction edge and entrance areas in accordance with regulations and facility records must be kept. If there is any demolition or change of requirements during construction, the procedures must be strictly followed for approval and record keeping.
20. The construction scope of the bid section will be closed by setting up posts at the entrance and exit of the green channel.
And arrange security personnel for on-duty management.
21. For the closure of the construction area, the contractor should cooperate with the contractor to hand over and accept the construction products such as curtain walls, partition walls, water, electricity, and wind interfaces in the construction area, and make relevant drawings, texts, and images as records. Memo information.
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:How to write a propaganda message about caring for empty nesters?
- Next article:Rule of law propaganda slogan
- Related articles
- A brief history of gold diamond
- Famous sayings and beautiful sentences about childlike innocence, it is best to have an author.
- Is it illegal to hold up signs and shout slogans in front of the workplace?
- What brand is iw watch? Brief introduction of iw watch.
- Can you continue to work after retirement?
- What changes have taken place in the concept of education and teaching after ten years of curriculum reform?
- Campus CD Action Theme Activity Plan
- What feng shui calligraphy and painting should be hung in the boss's office?
- Service slogan domineering rhyme
- What does "Shit happens" mean in Forrest Gump? What¡¯s the deeper meaning? Why can't I see what's going on with him?