What is a civilized construction site?

Tianjin civilized construction site evaluation standard

Chapter I General Principles

1. 1 In order to further strengthen the construction site management of construction enterprises, comprehensively promote the standardization of construction sites, and effectively promote the basic management of enterprises, this standard is formulated in combination with the specific conditions of our city.

1.2 this standard is compiled according to relevant national laws, decrees, regulations and relevant operating procedures.

1.3 The competent department of the construction enterprise shall take this standard as the assessment basis when assessing the basic management and on-site management level of the enterprise and selecting civilized construction enterprises and civilized construction sites.

1.4 This standard is applicable to all construction sites in Tianjin.

Chapter II Evaluation Methods and Scoring

2. 1 evaluation method

2. 1. 1 The evaluation of "civilized construction site" should be based on "standard", and graded and summarized according to the sub-item standards.

2. 1.2 this standard is divided into ten sub-items according to "three clean-ups, six good and one guarantee". The percentage system shall be adopted for each sub-inspection. When scoring, it shall be converted into standard score according to the requirements in the table, and the comprehensive standard score shall prevail after summary.

2. 1.3 methods such as impression, actual measurement and consulting relevant data were adopted in the inspection.

2. 1.4 The maximum penalty for this project is due score.

2. 1.5 If there is any missing item, it shall be calculated according to the following formula:

Sub-item score = sum of sub-item scores/sum of sub-item scores * 100.

Comprehensive standard score = sum of actual standard scores of each item/sum of actual standard scores of each item * 100.

2.2 classification of "civilized construction site"

2.2. 1 "civilized construction site" is divided into four grades according to comprehensive standards: civilized construction site, bureau-level civilized construction site, municipal civilized construction site and unqualified construction site.

2.2.2 "Civilized construction site": the comprehensive standard score is above 70 (including 70 points), and the scores of the two sub-items of excellent project quality and excellent safety production are above 70 (including 70 points).

2.2.3 "Bureau-level civilized construction site": a "civilized construction site" with a comprehensive standard score of 85 or above.

2.2.4 "Municipal civilized construction site": a "civilized construction site" with a construction area of over 3,000 square meters or a cost of over 6,543.8+200,000 yuan, and a comprehensive standard score of over 90 points (inclusive).

2.2.5 "Unqualified construction site": the comprehensive standard score is below 70, or the score of either of the two sub-items of excellent project quality and safe production is below 70.

2.3 organizational assessment

2.3. 1 This standard is an important basis for strengthening construction site management of construction projects. All relevant units and individuals engaged in construction activities in this Municipality must abide by this standard.

2.3.2 The evaluation of "civilized construction site" shall be conducted once a year.

2.3.3 "Civilized construction site" shall be inspected and approved by the superior competent department on the basis of enterprise self-inspection.

2.3.4 "bureau-level civilized construction site". The construction industry owned by the competent authority of each construction industry shall be evaluated by the competent authority.

The construction enterprises owned by each district and county shall be evaluated by the district and county construction committees.

Each industrial bureau is a first-class construction enterprise, which is assessed by the superior competent department (bureau level).

Suburban construction enterprises are evaluated by suburban construction management stations.

The central construction enterprises in Tianjin are evaluated by the competent bureau-level units.

Independent contracting construction enterprises from other places in Tianjin are evaluated by the municipal foreign construction team management station.

2.3.5 "Municipal Civilized Construction Site". From "bureau-level civilized construction site",-recommended by the competent department and approved by the Municipal Construction Committee.

Chapter III Standards for Civilized Construction Sites

3. 1 main contents

Three clean-ups, six good, and one guarantee. That is, site cleaning, material cleaning and operation surface cleaning; Good professional ethics, good engineering quality, good consumption reduction, good safety in production, good task completion and good life for employees; Ensure the use of functions.

3.2 Site cleaning

3.2. 1 The construction site must be equipped with enclosure facilities. The enclosure shall be safe, firm and effective. Highly consistent. In scenic spots, busy areas and main streets, the construction site enclosure shall not be unsightly. Scaffolding along the street should be equipped with corresponding enclosure facilities. The construction site must be equipped with a gate with five obvious signs, namely: the project overview board (indicating the project name, construction area, structural form, opening and completion date, construction unit, design unit, construction unit, etc.). ); Construction management network card (indicate the person in charge of construction, technology, quality, safety and equipment, etc. ); General layout of the construction site; Safety bulletin board (safety warning board, safety production and fire control system); Civilized construction measures card. All construction materials temporarily stored in Grandpa's * * construction site on the construction site shall be packed neatly and conform to relevant regulations. For granular and fluid materials, a fence must be set up, the height of the fence must not be less than 0.5 meters, and it must be covered with lime to prevent flying.

3.2.2 The construction site shall be flat and tidy, the engineering garbage shall be cleared in time, and the road shall be solid, flat and smooth.

3.2.3 Temporary water supply and drainage facilities shall meet the use requirements, and there shall be no water leakage or leakage. Construction sewage should be recycled or discharged up to standard. Don't pollute the scene. Dangerous drains and wells must be clearly marked and equipped with night protection facilities.

3.2.4 There are slogans to publicize the Party's principles and policies, boost morale, ensure project quality, pay attention to safety, fire control and civilized construction.

3.3 transparent materials

3.3. 1 Construction material stacking area, mechanical equipment storage area, machine and vehicle parking area, component processing area, living office area, warehouse, etc. Regional signs and responsible persons shall be clearly defined according to the layout of the construction site.

3.3.2 Bricks and tiles shall be packed in rows. Building materials such as blocks should be square and stacked together. Break it and separate it, and clean it while using it, leaving no bottom. Bulk materials such as sand and gravel shall be piled up in a centralized way and shall not be mixed; The material yard should be flat and solid, and the bottom of the material should be used at any time.

3.3.3 Stockpile cement shall be equipped with stow-wood, and the warehouse shall not leak. Open storage must be covered with a lid, and there can be no loose bags. Bulk cement has no fly ash and no moisture deterioration.

3.3.4 The placement of finished products, semi-finished products, materials and components shall meet the requirements and be neat. Should be moistureproof, rainproof and moistureproof measures should be taken, and flooding is not allowed.

3.3.5 Large tools should be strictly managed and distributed according to classification codes. Fasteners and accessories should be cleaned up in time after use and kept in stock.

3.4 Operation surface cleaning

3.4. 1 The construction work area is clear, and the person responsible for cleaning is clear. Clean up the site after work, recover or clean the landing materials in time, and keep the working face clean.

3.4.2 Transport machines and tools must be tight, and roads should be kept clean at all times. Machines and vehicles should be well maintained, scrubbed clean after use and stored in designated places.

3.4.3 Before the mixing station, a drainage ditch must be set up, and a backwater pool or seepage well should be set up, which should be cleaned frequently and kept unblocked. The background is not messy, and there is no pulp before and after.

3.4.4 Mixers, mortar machines, hoists, generators, air compressors and electric welding machines must be provided with temporary sheds. Other electric machinery should also take effective sun protection and rain protection measures to keep the mechanical and electrical equipment clean at any time.

3.4.5 The processing operation surface should be kept clean, and the waste materials such as sawdust, shavings, sawdust and short steel bars should be cleared in time. There is no garbage and sundries at the site, and the finished products are neatly packed.

3.5 Good professional ethics

3.5. 1 The construction unit shall seriously abide by the national policies and regulations, strictly implement the relevant provisions of the construction market management, and abide by the contract, and shall not recruit or hire indiscriminately.

3.5.2 Project management personnel are United and cooperative, dedicated, strict in management, fair and honest, work closely with the construction unit, coordinate the relationship with local residents, consciously accept the supervision of the masses, have a good democratic style, and have a record of soliciting opinions.

3.5.3 Strengthen the ideological and political work of staff and workers, educate staff and workers to establish the thought of "four haves" and serving the people, and make it regular and institutionalized through educational records.

3.5.4 Employees have excellent work style and cooperate with each other. There is no barbaric construction. No fighting, gambling or stealing.

3.5.5 Party members should play an exemplary role, cultivate a new style, and conscientiously do a good job in civilized construction.

3.5.6 Formulate civilized construction measures such as not disturbing the people, protecting the environment and protecting cultural relics.

3.6 The project quality is excellent.

3.6. 1 Establish and improve a complete quality assurance system. Formulate clear quality management objectives and quality management measures, conscientiously implement the "three inspections" system of self-inspection, mutual inspection and handover inspection, and insist on guiding construction with samples.

3.6.2 Carry out the construction in strict accordance with the operation process and design drawings, and do not cut corners. All the test data are accurate, true and complete, meet the design requirements, and there are no major quality accidents.

3.6.3 Unqualified finished products, semi-finished products and building materials are strictly prohibited.

3.6.4 In strict accordance with the acceptance standard of construction quality, timely and accurately evaluate the quality of each division and sub-project and fill in the engineering technical management data. According to the national quality acceptance standard, the qualified rate of subdivisional work is 100%.

3.6.5 Actively carry out total quality management activities. The project selection of the quality management team is accurate, and it can be applied correctly in the construction and achieved results, which has accumulated some experience for the project quality management.

3.7 Reduce consumption

3.7. 1 Establish and improve the management system of workers, materials and machines, with clear consumption reduction indicators and safeguard measures. The consumption reduction index can be decomposed and implemented to the engineering parts and posts, and a circular saving account can be established.

3.7.2 Before the construction of the main materials, there is a comparison of "two calculations" (design budget and construction budget), and the material acquisition is limited, and the procedures for receiving and returning materials are complete.

3.7.3 Measuring ruler shall be used for sending and receiving construction materials; The accounts agree with the goods. Strictly implement machinery. Large tool inspection system, complete and accurate daily records. Template pads are strictly prohibited.

3.7.4 Accounting is in place, and an analysis system of material consumption and saving is established. After the completion of some projects, the saving analysis of labor, materials and machinery consumption should be carried out quarterly and monthly, so as to find that targeted corrective measures are always formulated and reflect the cost accounting situation in time after the completion of the projects.

3.7.5 Strengthen measurement management, and do a good job in receiving, sending and using measurement materials. All kinds of measuring instruments must be measured regularly and marked as qualified.

3.7.6 Construction shall be carried out in strict accordance with the design requirements, so as to achieve "four no-exceeding" (super-high, super-long, super-thick and super-strong).

3.8 Good safety in production

3.8. 1 Establish and improve the safety production management system and safety production responsibility system with clear safety production control instructions. According to the characteristics of this project, formulate safety technical measures, and make disclosure according to the complete procedures.

3.8.2 Earnestly implement the grading standard of construction safety inspection of the Ministry of Construction, and it must reach the qualified standard or above.

3.8.3 Establish daily safety inspection. Regular inspection system, rectification should be fixed, fixed measures, and recorded. Special types of work must be certified, and unlicensed personnel are prohibited from operating.

3.8.4 Do a good job in the "three-level" education, pre-shift education and safety training of production safety.

3.8.5 Establish a fire prevention system according to the principle of "whoever is in charge is responsible". Sign letters of responsibility at different levels, equip firefighters, and implement the organization, personnel and system.

3.8.6 Conduct regular fire control and safety education for employees entering the site. Fire safety personnel and personnel in key positions must have "three understandings and three skills" (know the fire danger in their own production, know the safety measures to prevent fire, and know the fire extinguishing methods; Can call the police, can use fire extinguishers, can save and deal with accidents.

3.8.7 Flammable, explosive and other dangerous goods should be kept by special personnel and in a special warehouse. The warehouse should meet the requirements, and there are strict procedures and examination and approval systems for receiving and returning materials.

3.8.8 The construction of the on-site supervision room shall comply with the fire prevention regulations. Electrical wiring meets the requirements, and low-voltage wiring is used for dormitory lighting. The fire escape is unblocked and the width is not less than 3.5 meters.

3.8.9 The construction site must be equipped with sufficient fire-fighting equipment, which should be maintained frequently to ensure its sensitivity and effectiveness and reasonable setting. Warning signs must be set up in no-smoking areas.

3.9 Excellent completion of tasks

3.9. 1 The construction site must prepare the approved construction organization design, organize the construction scientifically, and ensure that the project is completed on schedule.

3.9.2 Guarantee materials and construction records of construction projects. Test records (reports), hidden inspection records, quality evaluation, as-built drawings and other management information are detailed and complete, which provides an accurate basis for project acceptance and future building modification, expansion and maintenance.

3.9.3 According to the construction progress plan, analyze the progress regularly and take corresponding measures to ensure the project progress.

3.9.4 The actual completion progress of key projects is not less than 95% compared with the planned requirements, and the actual completion progress of general projects is not less than 90% compared with the construction progress plan.

3. 10 workers live a good life

3. 10. 1 Formulate life management and health management systems. Implement heatstroke prevention and cooling, cold protection and heat preservation measures.

3. 10.2 The temporary dormitory in the living area is clean, windproof and rainproof, with complete doors and windows, and mosquito and fly prevention facilities in summer.

3. 10.3 The venue should be equipped with canteen (food delivery equipment), drinking water equipment, bathing (toilet) facilities, lounge, locker room (box), health station (box), toilet, etc. If conditions permit, bicycle sheds and clubs can be built.

3. 10.4 do a good job in disease prevention and epidemic prevention, strengthen food hygiene management, keep living and office areas clean, remove domestic garbage in time, clean the canteen to prevent rats, and have mosquito and fly prevention facilities.

3. 10.5 Toilets on the construction site should be tightly covered, and feces should be eliminated in time.

3. 1 1 guarantee function

3. 1 1. 1 clean-clean. Engineering waste soil and construction surplus materials should be thoroughly removed, indoor and outdoor should be cleaned, painted and decorated with bright colors and no pollution.

3. 1 1.2 End-intact. Strengthen the protection of finished products to ensure that building products are intact.

3. 1 1.3 Ping-Ping. The ground and walls are solid and flat, and there is no empty drum. The skirting board and dado have the same height and thickness, and the upper lines are straight.

3. 1 1.4 Qi-complete. Sanitary ware, equipment and embedded parts meet the design requirements.

3. 1 1.5 is firm. All installation and embedded parts meet the design requirements.

3. 1 1.6 Tightness-door and window frames are straight, joints are tightly plugged, doors and windows are closed, doors and windows are flexible to open, and the roof is tightly sealed.

3. 1 1.7 "four-way Yi Deng"-there is no running water in the upper water supply, no water leakage in the lower water supply, no smoke in the flue and no leakage in the lighting.

3. 1 1.8 Safe and convenient-stair handrails are firm and safe, with consistent step height, and building products can be safely used.