Joke Collection Website - Bulletin headlines - Five Notices on Flood Control in Rainy Season

Five Notices on Flood Control in Rainy Season

Notice is a widely used informing official document. It is used to issue laws and regulations, forward official documents from higher-level agencies, agencies at the same level, and agencies not affiliated with them, approve official documents from lower-level agencies, and require lower-level agencies to handle certain matters. So have you ever learned about notifications? The following are reference materials to share with you five relevant rainy season flood and flood control notices for your reference. You are welcome to refer to them.

Rainy Season Flood Control Notice 1

Road maintenance teams:

Our county is about to enter the flood season. In order to conscientiously implement appropriate road maintenance In accordance with the spirit of the notice [20xx] No. 4, we will do a good job in highway maintenance and highway flood prevention work in the rainy season in 20xx. We hereby notify you of the following relevant matters:

1. Raise awareness and do a good job in all aspects of highway flood prevention work. To prepare for the project, pay timely attention to the analysis and forecast of the meteorological and hydrological departments;

2. All road maintenance teams should attach great importance to highway maintenance and highway flood prevention in the rainy season, actively take effective measures, and pay close attention to implementation. The Bureau has established a road maintenance department in the rainy season. and the Flood Control Leading Group (the list of members is attached). The office of the Flood Control Leading Group is located in the Bureau Maintenance Company;

3. Further implement the responsibility system for road maintenance and highway flood control in the rainy season. Implement the responsibility system for road maintenance during the rainy season and road flood control and traffic protection to the unit offices, road maintenance teams or individuals at all levels. Main lines of the branch such as Qianda Line, Wanhuang Line, Fengdai Line, and Sitang Line, as well as tourist routes, county exits and other roads with great social impact, must strictly enforce flood control and flood protection work disciplines, and be responsible for those who do not fulfill their responsibilities and delay work. Those who cause serious consequences must be held accountable;

4. Strengthen the prevention and emergency repair of highway water damage, organize personnel to inspect road sections prone to water damage and accidents over the years, and deal with hidden dangers in a timely manner, especially for Take effective preventive measures to strengthen and repair dangerous bridges and culverts and soft and sinking road sections, speed up road maintenance and prepare materials, repair road potholes in a timely manner, and remove debris from bridge and culvert structures. Insist on patrolling roads on rainy days. If flood-damaged roads are interrupted, personnel should be immediately organized to carry out emergency repairs. Flooded road sections should be cleared after water recedes.

5. Strengthen the maintenance and management of construction sections. Maintenance responsibilities must be clearly defined on construction sections. In accordance with the principle of ensuring both construction and traffic, full-time maintenance personnel and traffic conductors should be deployed to ensure normal traffic on construction sections.

6. Rely on governments at all levels to carry out emergency repairs of highways damaged by water. In the event of flood damage, we must promptly report to the local government and obtain support and help. At the same time, during the flood season, we must obey the unified command and dispatch of the local flood control command department, organize manpower and material resources, actively participate in flood fighting and rescue, and be responsible for transportation flood prevention and disaster relief. The routes along which epidemic prevention materials and personnel pass must be ensured to be smooth and given priority.

7. Establish a day and night duty and reporting system during the flood season. In order to fully grasp and understand the flood situation, emergency repair of flood damage and meteorological conditions in a timely manner, each road maintenance team reports on the conditions of the highways under its jurisdiction during the flood season every ten days (4th, 14th and 24th). The outage situation must be reported promptly within one hour. During the flood season, each road maintenance team shall be on duty day and night. Comrade Song Lei of the branch liaised with and dispatched emergency repair work for flood damage and flood prevention. Each road maintenance team must designate a dedicated person to be responsible for flood damage prevention duty work, and report the duty location, phone number and contact person to the branch office for timely contact.

8. After receiving this notice, each road maintenance team should establish a team headquarters flood damage emergency support team to achieve unified deployment and complete responsibilities. Make careful arrangements for road maintenance and flood prevention work in the rainy season.

9. The branch will organize a special inspection and evaluation of road maintenance work during this year’s rainy season, and the results will be included in the year-end assessment.

X, Month, According to the spirit of the 20xx Flood Season Safety Production Work Conference at Construction Sites, the recent weather conditions in the XX area have been abnormal and the precipitation has been higher than in previous years. In order to effectively carry out flood prevention work at the construction site, the relevant requirements are now arranged as follows:

1. Requirements for flood prevention work

(1) Strengthen leadership and comprehensively improve emergency support capabilities

Flood prevention work implements the sixteen-character policy of "Safety first, constant preparation, prevention first, and all-out efforts to resist danger", and implements the management principle of unified command and hierarchical responsibility. All units must formulate targeted flood prevention plans and prepare for flood prevention. They must ensure that: the responsibility is assigned to the person and the command is in place; the situation is clear and the plan is feasible; the preparations are sufficient and the measures are effective.

(2) Implement responsibilities and comprehensively strengthen the construction of the contingency plan system

The main body of responsibility for flood prevention work is the general construction contracting unit, and the project manager of each project is the first person responsible for flood prevention work. All units should comprehensively strengthen the construction of the emergency plan system and formulate their own flood prevention emergency plans based on their own actual conditions. Ensure clear responsibilities, in place command, timely warning, and rapid response.

(3) Strengthen training and drills and improve actual combat capabilities

Each unit must organize training and drills based on its own actual conditions. First, organize various forms of professional training, focusing on emergency command, Plan preparation, information publicity, material management, etc.; second, each unit must organize professional rescue teams to conduct rescue drills.

The training and drill work should achieve ? 3 combinations, 2 in place and 1 achieved. That is: training and drills should be combined with the five implementations of flood control (organization, responsibilities, measures, funds, flood control materials), combined with the flood control emergency plan, and combined with the prevention of disasters that have occurred (such as foundation pit collapse accidents caused by rain). Integration; ensure that the responsible persons for flood control are in place and all measures are in place; overall, the actual requirements must be met.

(4) Seriously carry out flood prevention inspections and completely eliminate safety hazards

Each unit must conduct investigation and research on the progress of the project, carefully organize the investigation of flood prevention safety hazards and the identification of hazard sources, Establish a ledger to ensure that detailed, complete and verifiable checks are carried out, and the ledger is clear; problems discovered must be dealt with promptly and practical measures must be taken; experts must be organized for hidden dangers that really affect flood control safety and are difficult to solve. Demonstrate, formulate and implement safety emergency flood relief measures.

2. Specific measures for flood prevention

1. During the flood season, all units must strictly implement the "production duty system" and strictly enforce duty discipline. Leaders responsible for flood prevention work are not allowed to leave their posts at will.

2. The flood season is rainy and humid, which is a period of high incidence of electric shock accidents. Construction units must do a good job in waterproofing construction machinery and equipment, and in particular, carefully check temporary electrical equipment, related electrical circuits and protective grounding measures to prevent short circuits, electric shocks, and lightning strikes.

3. All units should formulate flood and lightning protection measures for tall scaffolding and tall machinery and equipment during strong winds and thunderstorms, and should strengthen inspections of the foundations of the above-mentioned equipment after rain. For the rainy season construction of large steel structures, a special lightning protection plan should be formulated as soon as possible and organized and implemented before the flood season to ensure the safety of construction in the rainy season.

4. All units should strengthen safety education during the flood season for on-site management personnel and construction personnel, and continuously improve workers’ awareness of production safety, self-protection and safety during rainy season construction.

5. All relevant units should strengthen information reporting, report flood prevention work dynamics in a timely manner, and keep information flowing. If there are any abnormal situations or emergencies, they should immediately report to the District Construction Bureau and activate the construction site emergency plan. Report incidents step by step as required.

3. Key points of flood control work

All foundation construction and trench construction should take prevention of collapse and rainwater backflow as the key points of flood control. Monitoring of the project and surrounding buildings should be strengthened. We also formulate preventive measures and prepare emergency plans based on the characteristics of the project and the surrounding environment, and prepare materials for flood prevention in advance, such as water pumps, sandbags (sand and gravel), grouting equipment, temporary lighting equipment, etc. If abnormal conditions are discovered during the monitoring process or are hit by heavy rain, measures must be taken promptly to prevent accidents.

There are many new construction projects in our district this year. The flood control situation is severe and the task is arduous. All units must attach great importance to it and make careful arrangements to ensure that their construction projects can survive the flood safely in a spirit of being highly responsible for people's lives and property.

Rainy Season Flood Control Notice 3

Various departments of the company:

According to the weather forecast of the XX City Meteorological Bureau, July 19 and 20 (today and tomorrow) ) There will be heavy to heavy rain. All departments are requested to make the following preparations in accordance with the requirements of the 20XX Flood Control Work Notice:

1. Keep the main factory duty phone open;

2. The Armed Security Department organizes a flood control rescue team Personnel implementation;

3. Each branch factory and relevant departments should conduct material inspection and personnel implementation before flood prevention;

4. Each branch factory and relevant departments’ flood prevention and rescue teams organize personnel to maintain Communication is smooth.

5. For sewage pumping stations managed by the power plant, please lower the water level below the water inlet at any time according to actual conditions to ensure the safety of the company during the flood season.

Notice hereby.

XX Machinery Flood Control Headquarters

July 19, 20XX

Rainy Season Flood Control Notice 4

All units in the school:

p>

A sudden heavy rain fell in XX City last night and this morning, and there is no sign of relief so far. There are many waterlogging situations in the school. There is serious water accumulation around the school's main entrance archway and the undergraduate college, and vehicles are temporarily unable to pass. There is a small area of ??landslide 100 meters from Dongshantou to Huanshan Road in Department XX, and traffic control has been implemented and no access is allowed. The second attached small to The Chagang community is severely waterlogged and vehicles cannot pass through. At the same time, there is a threat of water intrusion in several power distribution rooms, and power outages may occur at any time to ensure safety. In order to do a good job in safety work under extreme weather conditions and ensure the safety of teachers and students' lives and property, the relevant matters are now notified as follows:

1. All units must attach great importance to it, adhere to the responsibility of guarding the territory, and earnestly assume the responsibility of their units Responsibility for emergency and disaster relief work within the scope of duties. The main responsible comrades should immediately go deep into the front line, fully understand the situation, take command from the front, and actively organize the cadres and workers of the unit to carry out emergency rescue and disaster relief work.

2. All units must have smooth access to information, and report major dangers and disasters to the school emergency and disaster relief headquarters (the headquarters is located in the Logistics Support Department, contact number: 68771388), so as to facilitate the overall coordination of the school and mobilize all departments. Force to deal with it promptly. Before 16:00 every afternoon, each unit will report the rescue and disaster relief situation to the rescue and disaster relief headquarters via email.

3. All units should promptly adjust teaching and scientific research arrangements according to rain conditions and disasters, and strengthen safety warnings for teachers and students; the student affairs department should organize counselors to conduct safety education and reminders among students, We should pay close attention to the safety education and management of students who carry out internships, social practice and other activities outside, effectively prevent accidents, and ensure the personal safety of teachers and students and the safety of teaching and scientific research activities.

4. Each unit must conduct a thorough investigation of potential safety hazards within the scope of its responsibilities, especially those buildings and walls that are prone to collapse within the area of ??responsibility, and promptly set up warning signs to remind teachers and students.

The laboratory and equipment management department and all units must take effective measures in a timely manner to strengthen the safety management of laboratories and equipment; the logistics and security departments must provide timely warnings to potential secondary disaster locations such as landslides and tree toppling, and prepare appropriate responses. .

5. Each unit should further improve the emergency response plan. If any safety hazards that need to be coordinated and resolved are discovered, please report to the school in a timely manner.

XX University

July 6, 20XX

Rainy Season Flood Control Notice 5

Dear residents and friends:

< p>According to the latest news released by the XX Meteorological Observatory and the latest meteorological data analysis, extremely heavy rain is expected to occur in XX from this evening to evening. It is expected that from the night of the 23rd to the evening of the 24th, there will be heavy to heavy rains in the two cities of XXXXX, the north of XX City and along the XX Mountain. The cumulative rainfall is 50 to 80 mm. Some towns and villages can reach more than 80 mm. Moderate rain (10 to 25 mm) will occur in other areas. ), among which there is heavy rain (25-38 mm) in the southwest of XX, which may cause flash floods, urban waterlogging and geological disasters, and have a certain impact on transportation, tourism, urban and rural infrastructure, and people's production and life. Please strengthen prevention.

Residents and friends are requested to be vigilant and pay attention to the following safety matters to prevent problems before they occur:

1. Please do not charge outdoors or in the garage today and tomorrow to avoid causing electrical accidents.

2. Try not to park vehicles in underground garages to avoid damage.

3. Do not drive through water, and do not restart the vehicle after it stalls in the water.

4. People should pay attention to safety and take good care of the elderly and children at home.

5. Ensure that property is not damaged and take preventive preparation measures.

6. Residents who live in bungalows or have underground garages should take waterproofing measures in front of their doors. It is best to bring sandbags to prevent rainwater from pouring into the house.

Reminder: In the event of danger, residents and friends are advised not to panic and take relevant first aid and self-rescue measures. At the same time, we cooperate with the community and property management companies in emergency response work.