1. Safety in production

1. Compilation of safety data, purchase of safety warning signs and setting of publicity columns;

2. the cost of "three treasures", "four ports" and "five borders" protection;

3. The cost of safe electricity consumption in construction, including electrical box standardization, electrical protection devices and external protection measures;

4. The expenses of safety protection measures (including warning signs) for cranes, tower cranes and other lifting equipment (including derrick and portal frame) and external elevators, and the expenses of facilities such as border protection, interlayer safety door and protective shed of the unloading platform;

5. Inspection and testing expenses for hoisting machinery on the construction site;

6, construction machinery protective shed and its fence safety protection facilities;

7, the cost of the construction site safety protection channel;

8. Purchase expenses of workers' protective articles and appliances;

9. Configuration cost of fire-fighting facilities and fire-fighting equipment;

1. Fees for electric protection and safety lighting facilities;

11. expenses for other safety protection measures.

2. Civilized construction

1. Costs of gate, five cards and one map, worker's badge and enterprise logo;

2. Wall beautification of enclosure (including internal and external painting, whitewashing, slogans, etc.) and coping decoration expenses; On-site toilet bowl whitewashing, tiling, cement mortar floor or floor tile costs, temporary defecation facilities costs in the building; The cost of decoration and beautification measures for other temporary facilities on the construction site;

3, the cost of on-site living and sanitation facilities; The cost of drinking water equipment, shower, disinfection and other facilities that meet the hygiene requirements; Cost of clean fuel for domestic use; The cost of measures to prevent gas poisoning and mosquito bites;

4, the hardening cost of the operation site on the construction site;

5. The cost of site pollution source control, construction waste and domestic waste cleaning and transportation, site drainage and sewage disposal measures; Municipal engineering dust sprinkler costs;

6. On-site greening expenses, comprehensive public security management expenses and on-site electronic monitoring equipment expenses;

7. Medical and health care equipment, articles and training expenses for emergency personnel are provided on site;

8. Expenses for heatstroke prevention and cooling, electric fans, air conditioners and other equipment and electricity consumption for field workers;

9. Cost of noise prevention and nuisance prevention measures for site construction machinery and equipment;

1, other civilized construction measures.

-----------. To "come to work happily and go home safely", it is necessary to strengthen the safety management of the construction site, and the project department and various construction operations will work together to create a good, safe and civilized working environment.

1. The project management department shall formulate relevant regulations on safe and civilized production in strict accordance with the requirements of Nanjing Construction Safety Production Supervision Station, implement necessary safety facilities, protection and various signs, etc., so as to ensure that the requirements of standardization are met, so that everyone who enters the site can feel safe enough and devote themselves to production and construction.

2. The project department set up a safety leading group with the executive manager as the team leader, the person in charge of each operation department as the deputy team leader, and the safety officer as the team member, responsible for the daily command, supervision and implementation of safety production. Adhere to daily arrangement, inspection, recording and results, evaluate every Monday and summarize every month, so that mistakes must be corrected and never slackened; When someone works on the construction site, we will have a safety officer on the scene. We should find hidden dangers in time and deal with them in time to nip them in the bud, so as not to cause any safety accidents of any size.

3. All personnel who enter the site for construction must be educated on the safety instructions for entering the site, especially those who have weak safety awareness and low educational level, and should be educated patiently and carefully to ensure that they can understand and do it, instead of just talking about it. The project department will organize them to study in various forms according to the characteristics of the site unit price project, ask questions about the knowledge of safety production, and even take exams, so as to do a good job in safe and civilized production in a targeted manner.

4. Safety management personnel who enter the construction site must be trained and hold relevant certificates, and should have a strong sense of responsibility, be able to bear hardships and stand hard work, and be quick-sighted (can find problems), diligent (patrol the site more) and diligent (speak more when problems are found), and earnestly do their jobs. Special types of construction personnel (electricians, tower crane drivers, welders, scaffolders, machine operators, etc.) who enter the construction site must receive formal training from relevant departments, hold employment certificates, be familiar with various safety operation procedures, and be able to maintain the machines and tools frequently to ensure that the machinery works well and does not work in spite of illness.

5. The key point of safety production is to do a good job of safety technical disclosure in advance. At the same time of disclosure of construction technology and quality requirements of each division and sub-project, safety technical disclosure must be done well, construction operation precautions, whether scaffolding and protective facilities meet the requirements of safe operation; Do not hurt yourself or others during construction.

6, in the process of construction operation, to strengthen the patrol work, strengthen the process control. Problems found on site can be corrected in time to eliminate any unsafe hidden dangers in construction.

7. The project department plans to organize on-site management personnel to conduct a major inspection of the site's safe production and civilized construction every Friday afternoon, score against the standardized site scoring table, and carry out competition among construction operations. If the score is lower than 85, it will be educated and punished, and it will be ordered to make rectification within a time limit; Those above 95 points will be rewarded accordingly. With education as the purpose and rewards and punishments as the means, the self-management level of the construction team will be improved, and a new climax of safe production and civilized construction will be set off.

8. The safety goal of this project is no major accident, and the general accident frequency is controlled below 2%. Once it is found that there is a safety accident (the loss is below 1 yuan) in any operation place during the construction, the person in charge of the operation place must be punished and the safety officer replaced.

9. We will implement a safety management system in which the first level is responsible for the first level, each taking responsibility and earnestly performing their respective work, so as to ensure that the management is up to standard, and strive for a standardized construction site.

I. Construction Safety and Civilization

Creating a civilized construction site, carrying out civilized construction and civilized operation are the basic work to ensure safe production and establish a good image of the enterprise. Practice has proved that safety leads to civilization, and civilization leads to safety. Nowadays, many construction enterprises have realized that it is necessary to create a civilized construction site and carry out civilized construction and civilized operation as a major basic work to ensure the safety of construction and production and establish a good image of enterprises. Creating a civilized construction site, carrying out civilized construction and civilized operation is not only a highly managerial work, but also a highly technical work. At the same time, it also requires employees to have the corresponding safety and civilized production quality as its foundation. Therefore, it includes the construction and development of management, technology and staff quality training, and the safety and civilized construction technology is an important part of it.

2. Standard management regulations for creating civilized construction sites

(1) and regulations on "safe production"

1. Improve and perfect all kinds of safety management accounts, and strengthen the safety management software information work, including: safety responsibility system, safety education, construction organization design, technical disclosure of division (project) safety, special operations with certificates, safety inspection, pre-shift safety activities, and compliance with rules and discipline.

2. The use of the "Three Treasures" and the four-port border protection facilities must meet the standards, including the use of safety helmets, safety nets and safety belts; Stairs, elevators, reserved holes, pits and openings, and border protection of balconies, floors and roofs.

3. Scaffolding facilities meet the inspection standards and have acceptance procedures, including external scaffolding, climbing frame, scaffold hanging hands, non-scaffold picking hands, scaffold hanging hands, etc., which are inspected once a week, rectified in time, and hidden dangers are controlled.

4. Three-phase five-wire system shall be implemented when the temporary electricity consumption for construction reaches the standard, with professional management. The distance between the construction project and the high-voltage line, branch line erection, on-site lighting, power transformation and distribution equipment, fuses and low-voltage trunk line erection must meet the standards issued by the Ministry of Construction. 5. The tic-tac-toe frame and gantry are qualified and listed for use. The safety device is sensitive and reliable, the signal of the insurance sign is eye-catching, the frame body is stable, and the derrick is safe and protected, and the winch and gantry are used.

6. The standard of large-scale construction machinery and the safe use of tower cranes, all kinds of cranes and dual-purpose elevators for people and goods must meet the ministerial standards, and they can only be used after passing the acceptance and listing. Their drivers and commanders hold valid certificates and have records of operation every day; The three insurances and five limits of the tower crane are complete, sensitive and reliable, and other items conform to the regulations; The insurance limit of the dual-purpose elevator for people and goods is complete and effective, and other requirements are met.

7, small and medium-sized machinery in good condition and safe use to keep in good condition, transmission and knife edge protection and grounding standards, operators according to their use requirements special valid certificates.

8. To implement strong safety monitoring, there are specific safety monitoring implementation plans and specific practices for floor safety monitoring. Floor safety monitoring personnel must hold relevant certificates, and all personnel on the construction site must wear badges.

(II) Provisions on "Site Capacity and Appearance"

1. The enclosure for the construction site shall be set according to the location of the project: the height of the main road section and the city landscape road shall not be less than 2.5 meters and shall be stable, neat and beautiful; Other sections of the fence height of not less than 1.8 meters, to ensure stable and beautiful; Facade of building and decoration engineering: The enclosed height of enclosure must be more than 1.5m higher than the working floor to prevent objects from falling out.

2. Establish enterprise characteristic signs on the site. The door, gate and flagpole of the site shall be set according to the unified standards of each enterprise with its own characteristics, and the abbreviations of the specifications of the group and the enterprise shall be marked. Three flagpoles shall be erected in the site to raise the flags of the group and the enterprise.

3 The site area is reasonably and orderly distributed, and the site appearance is neat and civilized. The construction area and living area are strictly separated, and the site appearance is neat, tidy, orderly, civilized and material areas are neatly stacked, and security measures are taken.

4 set up eye-catching safety signs. Set up eye-catching safety warning signs in the construction area and dangerous area.

5. Set up "seven signs and one map" construction signs. Set up "seven signs and one map" at the main entrance and exit of the construction site: 1. Introduction sign of the project: the name of the project, the construction, design, construction and supervision unit, the scope, area, engineering structure and number of floors around the construction site, the date of completion and the supervision telephone number; 2. Name plate of the person in charge of the project: including the person in charge of the project, engineer, safety officer, quality engineer, hygienist, builder, planner and material engineer; 3. Six safety discipline cards 4. Safety production counting cards (days) 5. Ten safety technical measures cards; 6, fire prevention information card 7, health information card (figure); 8. site construction general layout

6. the site must have three links, one leveling and smooth drainage to prevent mud, sewage and wastewater from flowing out or blocking sewers and drainage channels.

(3) Provisions on "Site Hygiene"

1 "Five Owns" facilities for living are complete, and the "Five Owns" facilities on the site are complete and reasonable. The living area should be set with eye-catching environmental sanitation publicity signs and responsibility area contract map.

2 in addition to the "four pests", drainage and sewage discharge are unblocked, and various measures for eliminating the four pests are implemented to control the four pests and evil life. Drainage, sewage flow, conditional should be green layout.

3 The dormitory and other neat and clean dormitories shall use 36V low-voltage electricity uniformly, and daily necessities shall be placed neatly. The on-site office, dressing room and toilet shall be cleaned frequently to keep them neat and clean.

4 The canteen meets the hygiene requirements. 1. The erection of the canteen should comply with the regulations and go through the approval procedures; 2, the canteen and around should be neat and clean, no water; 3. The container should be marked raw and cooked, with a veil, and the canteen with conditions should be sealed; 4. Every year from May to October, samples (not less than 5g) should be kept for 24 hours and recorded; 5. Tableware and tea sets should be strictly disinfected, and the cost of use should be disinfected every day to prevent cross-contamination. The supply of tea should meet the hygiene requirements; 6. The cook shall have a physical examination every year, hold a health certificate and a post certificate on hygiene, and must be diligent and white, and maintain good personal hygiene habits.

5 Domestic garbage shall be managed in containers, placed in designated places, managed by special personnel, and cleaned regularly

6 Health care and hygiene requirements 1. There shall be an infirmary, or on-site medical rounds at least twice a week; 2, do a good job in the publicity and education of workers' health and disease prevention, and introduce the knowledge of disease prevention and treatment to workers in the form of blackboard newspaper; 3, medical staff to supervise the health, regularly check the place such as canteen hygiene.

III. Provisions on "Civilization Construction"

1. The site publicity requires that eye-catching publicity slogans reflecting the spirit of enterprise and the style of the times be set around the site; Set up publicity posts and blackboard newspapers in the construction site to reflect the internal and external dynamics in time.

2 Team construction requires strengthening team construction, providing necessary activity places for the team, having a good class appearance, having a safety record of three posts and one evaluation, and improving the quality of the team.

3 Comprehensive management of public security requires strengthening the comprehensive management of public security on the site, so as to achieve target management, implement the system, and assign responsibility to people. Public security preventive measures are strong, preventive facilities for key parts are in place, the outsourcing team is clear, file cards are established, and public security and fire prevention agreements are signed.

4 community service requires cooperation with the region during the construction period, carrying out * * * civilized activities, thinking for the people, reducing construction noise, and striving to ensure that the construction will not disturb the people, so as to make the project a project that loves the people and facilitates the people.

5 fire safety 1. Establish fire safety organizations, voluntary fire brigades and fire prevention files; Clarify the fire safety responsibilities of the project leader, management personnel and each operation post; 2, according to the provisions, the configuration of fire equipment, personnel management and implementation of fire prevention system and measures; 3, according to the construction area, the level of hot work, hot work must have "two certificates, one device and one monitoring"; 4. Strictly manage inflammable and explosive articles and set up special warehouses for storage.

iv. Construction safety, construction civilization and safe and civilized construction technology

(1) Creating a civilized construction site means creating a safe construction site, and civilized construction will bring construction safety. The purpose of creating a civilized construction site is to establish a civilized image and ensure production safety. In the above-mentioned civilized construction site standard management regulations, most of them are related to ensuring the safety and health of employees, and they almost summarize the management requirements of all aspects of safety production. Therefore, to create a civilized construction site is to create a safe construction site, and to create construction safety with the civilization of construction.

(2) Safety and civilization are inseparable, and they are * * * in one, forming a * * body of safety and civilization. Although the above provisions list the safety clauses and civilized clauses separately, there are civilized requirements in the safety clauses and safety requirements in the civilized clauses. In fact, they are inseparable, and * * * is in one, making a safe and civilized * * * body. Therefore, we must have such an understanding of security and civilization and their relationship. <