The standards for creating a safe and civilized construction site in Shandong Province should be detailed, clear and accurate.

There should be records of migrant workers' schools and trade unions

1

Safety

Management

1. ★ The general contractor or subcontractors have no safety production license, and the project manager and full-time safety officer have no safety production assessment certificate;

2. ★ No responsibility system for production safety;

3. ★ There is no organization and full-time staff for production safety;

4. ★ No accident emergency plan has been formulated;

5. 1 points will be deducted for management without safety objectives;

6. 1 points will be deducted for each missing item if the special construction scheme is not prepared;

7. 1 points will be deducted for failing to conduct safety level 3 education;

8. No safety technical disclosure or incomplete disclosure procedures will be deducted 1 points;

9. 1 points will be deducted for not carrying out security team activities;

1. 1 points will be deducted for failure to conduct regular safety inspection;

11. 5 points will be deducted every time the hidden dangers of accidents are not rectified in time;

12. Management personnel and special operations personnel who do not hold relevant certificates will be deducted 5 points for each person found;

13. 1 points will be deducted for the layout plan without site safety signs;

14. If safety, security, fire prevention and public security systems are not established, 15 points will be deducted;

15. 8 points will be deducted for failing to formulate protective measures for municipal pipe network and surrounding buildings, structures and power supply facilities;

16. others.

The total assessment time is 1

8

Examiner

Note: ★ The project is a guarantee project, and the construction site lacking the guarantee project may not participate in the selection of provincial civilized construction sites and safe construction sites.

Table II Site Safety Protection Assessment Scoring Form (Building Construction)

Project Name: Project Manager:

Deduction of serial number and sub-item contents

Deduction of points

Actual score

1

Three treasures and four mouths

1. Incorrect use of safety helmet and seat belt will be deducted by 2 points each;

2. 25 points will be deducted if the safety net is not used or the safety net that is unqualified is used;

3. 2 points will be deducted for each nonconformity of "four ports" and "limb";

4. 1 points will be deducted if the protective facilities are not standardized and instrumentalized;

5. 1 points will be deducted for elevator shaft, pipeline shaft and internal protection;

6. 5 points will be deducted for each point where the protection such as access point and equipment protective shed does not meet the requirements;

7. others.

Small scale 5 5

2

Scaffolding (formwork support)

1. ★ There is no erection plan or the preparation and approval do not meet the requirements;

2. 15 points will be deducted if the scaffold is not built according to the special scheme;

3. 2 points will be deducted if the scaffold steel pipe is unpainted, seriously corroded or irregularly erected;

4. 15 points will be deducted if the vertical rod foundation of the landing scaffold does not meet the requirements;

5. 15 points will be deducted if the setting or structure of the wall parts does not meet the requirements;

6. 1 points will be deducted if the unloading platform is not instrumentalized and finalized;

7. The concrete pump pipe, unloading platform, formwork support, cable wind rope, etc. will be deducted 1 points each time they are fixed with the scaffold;

8. 25 points will be deducted if the cantilever beam of the cantilever scaffold is unused or the deformation of the steel is serious or the cantilever frame is connected by fasteners;

9. If the overall lifting scaffold is not appraised, 25 points will be deducted;

1. 1 points will be deducted for scaffolding and formwork support system without acceptance formalities;

11. others.

5 5

The total assessment time is 1 1

Examiner

Note: ★ The project is a guarantee project, and the construction site lacking the guarantee project may not participate in the selection of provincial civilized construction sites and safe construction sites.

Table III Assessment Scoring Sheet for Electricity and Mechanical Equipment for Temporary Construction on Site (Building Construction Project)

Project Name: Project Manager:

No. Item

Content Deduction Criteria

Deduction

Score Actual

Score

1

Temporary

Construction

2. If the three-level distribution and two-level protection system and TN-S neutral protection system are not adopted, 15 points will be deducted for each item;

3. 5 points will be deducted for incomplete procedures of regular inspection and review;

4. 1 points will be deducted for the mixture of protective grounding and protective zero connection, and 2 points will be deducted for each place where the repeated grounding device does not conform to the specifications;

5. If the protection of electric lines and electrical equipment do not meet the requirements of the specification, 3 points will be deducted for each point;

6. If there are no signs or warning signs in the transformer room, 1 points will be deducted, and if the setting of the transformer room, safety devices and fire-fighting facilities do not meet the specification requirements, 2 points will be deducted for each point;

7. If the distribution lines and cables are not laid with five-core wires and PE wires are not laid with green/yellow double-color wires, 1 points will be deducted for each item, and 2 points will be deducted for each item if the erection of the distribution lines does not meet the requirements of the specification;

8. Each electrical equipment has no special switch box; If the selection of leakage protector does not conform to the specification and the power inlet of distribution box and switch box is connected by plugs and sockets, 1 points will be deducted for each item; if the setting, selection, use and maintenance of distribution box and switch box do not conform to the specification requirements, 2 points will be deducted for each item;

9. If the electric machinery and hand-held electric tools are not used and maintained according to the specifications, 2 points will be deducted each;

1. 1 points will be deducted for each place where safe voltage is not used according to the specification requirements, and 2 points will be deducted for each place where the lighting power supply and lighting devices are not in conformity with the specification;

11. Use copper wire or other metal materials instead of fuse, and deduct 1 points for each point;

12. others.

Small meter 5 4

2

Construction

Machinery 1. ★ The preparation, review, approval and acceptance of the assembly and disassembly plan for tower cranes, construction elevators, integral lifting scaffolding and other equipment are not in conformity with the procedures;

2. ★ Units that assemble and disassemble tower cranes, construction elevators, integral lifting scaffolding and other equipment have no corresponding qualifications

3. Deduct 2 points for each set of equipment used without registration;

4. Deduct 2 points for each obsolete or poor safety mechanical equipment found;

5. 5 points will be deducted for each mechanical equipment with excessive noise;

6. The tower crane and other large mechanical equipment without installation quality acceptance before use will be deducted 15 points for each one found;

7. If the safety devices of tower crane and material hoist are incomplete or fail, 1 points will be deducted;

8. 5 points will be deducted if the foundation pit of tower crane accumulates water or is buried by sundries;

9. 1 points will be deducted if the derrick cable wind rope or wall-attached device does not meet the requirements;

1. 1 points will be deducted for poor equipment maintenance or no maintenance record;

11. 3 points will be deducted for each machine whose zero grounding of mechanical equipment does not meet the requirements;

12. 1 points will be deducted for using a multifunctional electromechanical woodworking machine with a planer and a circular saw;

13. Small and medium-sized machinery safety protection devices do not meet the requirements, and 5 points will be deducted for each place found;

14. 5 points will be deducted for unlimited weight or warning signs;

15. others.

5 4

The total assessment time is 1 8

Examiner

Note: ★ The project is a guarantee project, and the construction site lacking the guarantee project may not participate in the selection of provincial civilized construction sites and safe construction sites.

Table 4 Site Civilized Construction Assessment Scoring Sheet (Building Construction)

Project Name: Project Manager:

No. Item

Content Deduction Criteria

Fraction Deduction

Score Earned

Score

1

Temporary

Facilities 1. ★ Deduction for the project under construction and dormitory 25.

2. If the temporary facilities are not arranged according to the general plan, 1 points will be deducted;

3. 15 points will be deducted if the office living area and the working area are not clearly divided;

4. 25 points will be deducted for using prefabricated concrete prefabricated prefabricated prefabricated houses as staff quarters;

5. If the ventilation and lighting in the dormitory are poor and untidy, 1 points will be deducted;

6. 1 points will be deducted if the per capita area in the dormitory is less than 2 square meters or if two people share a bed;

7. 15 points will be deducted for disorderly wiring in dormitory, using electric stove and rice cooker, and using high-power heating equipment in winter;

8. 1 points will be deducted if the canteen has no hygiene system and hygiene license;

9. 8 points will be deducted if the cook has no health certificate or wears and operates uncivilized;

1. If the raw and cooked food in the canteen are not separated and there are no fly prevention measures, 1 points will be deducted;

11. If there is no ceiling in the canteen, there are no tiles around and on the ground, and there are no smoke exhaust facilities, 1 points will be deducted;

12. If there is no water to flush the toilet, and there is no designated person to clean it, 1 points will be deducted for heavy dirt and odor;

13. There is no urinating facility on the operation floor, and 5 points will be deducted for every place where workers urinate or defecate;

14. Deduct 1 points if there is no recreation room and smoking room;

15. 8 points will be deducted if there is no shower room;

16. 1 points will be deducted if the person in charge of health in each region is not clearly defined or the on-site incineration, toxic, harmful and malodorous substances;

17. others.

small meter 5 42

2

field capacity and appearance 1. 1 points will be deducted if there is no enclosure on the construction site or the enclosure is unqualified;

2. 5 points will be deducted if the enterprise logo is not set;

3. If "five cards and one map" do not meet the requirements, 2 points will be deducted for each card;

4. 5 points will be deducted if there is no washing table at the entrance and exit; The entrance and exit and the main road are not hardened by 1 points;

5. If the drainage culvert is blocked, 1 points will be deducted for the accumulated water in the construction site;

6. Deduct 1 points if sewage is directly discharged into urban sewers without precipitation;

7. Deduct 5 points for each place where the dust-prone materials are not effectively covered;

8. 5 points will be deducted if the construction and domestic garbage is not cleared in time;

9. 1 points will be deducted if the site is not cleared after work;

1. 1 points will be deducted if inflammable and explosive articles are not classified;

11. If there is no greening arrangement in the office and living area, 5 points will be deducted;

12. others.

5 43

The total assessment time is 1 85

Examiner

Note: ★ The project is a guarantee project, and the construction site lacking the guarantee project may not participate in the selection of provincial civilized construction sites and safe construction sites.

Table 5 Assessment Score Form for Site Safety Creation (Building Construction Project)

Project Name: Project Manager:

No. Sub-item content deduction standard deduction score actual score

1

Public security management 1. ★ Serious public security cases or unstable factors at the construction site are not reported to the police station in time;

2. ★ Arrears of wages of migrant workers have serious consequences and impacts;

3. The construction unit has not signed with the police station (responsibility book for public security management of construction site), and 1 points will be deducted;

4. 1 points will be deducted if there is no public security system at the construction site;

5. 5 points will be deducted if the construction unit has not signed a letter of responsibility with the construction management department.

6. 5 points will be deducted if the construction team fails to establish (site comprehensive management account) in time after entering the site;

7. (account for comprehensive management of construction site) is incomplete, and 5 points will be deducted for each missing item;

8. 5 points will be deducted if the general contractor fails to sign the security management responsibility letter of the construction personnel;

9. 5 points will be deducted if the site fails to establish the emergency plan;

1. 5 points will be deducted if the legal education is not carried out by the site project department;

11. 5 points will be deducted if there is no guard at the construction site or the guard system is not implemented;

12. 2 points will be deducted if there is no record of people visiting, or if people come in and out casually;

13. 2 points for employees not wearing work buckles;

14. If the employment is not registered, 5 points will be deducted;

15. 5 points will be deducted for failing to sign a labor contract with workers according to law;

16. Others

5 4

2

Trade union work and fire control 1. ★ No amateur migrant workers' schools have been set up in construction sites of a certain scale;

2. Deduct 1 points if no trade union organization is established;

3. Deduct 1 points if the labor protection account of the trade union has not been established;

4. 1 points will be deducted for failing to equip and train the labor supervisor of the trade union as required;

5. Deduct 1 points for failing to formulate effective measures to love the people and facilitate the people;

6. 1 points will be deducted for the construction at night without permission or the phenomenon of disturbing people;

7. 8 points will be deducted for failing to post convenience slogans or billboards around the construction site;

8. 8 points will be deducted if there are idle people and family members and children in the operation area;

9. 1 points will be deducted if there is no fire-fighting equipment or the configuration does not meet the requirements;

1. 1 points will be deducted if there are no first-aid equipment, stretchers and medical rooms and standing medicines are not equipped as required;

11. others.

5 4

The total assessment time is 1 8

Examiner

Note: ★ The project is a guarantee project, and the construction site lacking the guarantee project may not participate in the selection of provincial civilized construction sites and safe construction sites.