Five Summaries on the Personal Work of the Constructor

Summary is a written material that comprehensively and systematically reviews and analyzes the study, work or its completion in a period. It helps us to find the laws of the development of work and things, so as to master and apply these laws. It is time to write a summary. The following is a summary of the personal work of the builder I compiled for you, hoping to help you!

personal work summary of the builder 1

I have been in _ _ _ _ _ _ _ Industrial Development Co., Ltd. for two months, working in the site management department of the engineering department. During this period, I learned a lot of professional knowledge about construction management, met many mentors and accumulated a lot of work experience. Thank the company for giving me the space, courage and confidence to grow up. In two months, through unremitting efforts, I learned a lot about construction projects, but I realized that I should further learn relevant professional and technical knowledge and improve construction management knowledge in order to devote myself to my work. Looking back, the work is summarized as follows:

1. Work summary

During this period of work, I have studied, supervised and managed the construction projects of single dormitory, staff canteen and Shanxi aged vinegar warehouse. And further understand and master the Fen Liang vinegar industry project.

II. Work Progress

1. On May 23rd, the single dormitory was started, and the related processes and standards of foundation pit excavation and backfill in single dormitory were studied. On May 27th, the canteen was started, and the related construction process of the canteen was studied and supervised. In the following more than half a month, I tracked the construction progress of the staff canteen and single dormitory, and learned the related process operations and technical standards such as foundation pit excavation, backfill, steel bar acceptance, template acceptance, bedding and foundation engineering. Great progress has been made in both technical standards of engineering construction and project schedule management. On the premise of continuous improvement of relevant professional knowledge, the company leaders asked me to be responsible for the construction project of Shanxi mature vinegar warehouse.

2. On June 15th, he began to be responsible for the construction of Shanxi mature vinegar warehouse. On June 15th, the foundation pit of the old vinegar warehouse was excavated, with No.16 tongs, No.17 tongs and No.19 tongs. At the end of June, the first backfilling and compaction of the foundation pit was completed.

3. Cooperate with purchasing and related logistics.

Third, the main problems in the work are as follows:

Because I just started to contact the project, I am familiar with the drawings and have relatively insufficient construction experience in the work. However, through these two months' study, I learned many process standards and professional technical management in the construction process. In the future work, I will continue to learn, improve my professional and technical knowledge, improve my cognitive ability to work, and devote myself to my work better in the future.

4. Work experience

1. During these two months' work practice, I participated in many collective work and got along well with my colleagues. In this process, I strengthened the most precious and important sense of team. On the basis of trusting yourself and others, with unified thoughts and consistent actions, such a team will be invincible. In the project, everyone reminds and supplements each other, which improves the work efficiency. Communication is the most important thing in all work, so we must deal with the information timely, effectively and clearly.

2. Every step of the work should be precise and meticulous, and strive for refinement. Under the guidance of this mentality, being able to act positively and confidently is the biggest progress in my mentality in the past two months.

3. In my work, I learned a lot of technical knowledge, and also strengthened my awareness of the quality, cost and progress of the project. The cooperation with colleagues around me is more tacit. The threesome must have my teacher. I learned a lot of knowledge and skills from them and the truth of being a man. I am also very glad to have them around when I first started on the road. I will definitely form an excellent team with them and make better achievements.

V. Work Plan

In the second half of the year, the company will speed up the progress of the project, and the work pressure will be relatively heavy. It is necessary to work hard, be diligent, do a good job in every job, handle every detail well, strive to improve its skills and execution, and grow and progress as soon as possible. Among them, the following points are my key points to improve next year:

1. We should improve the initiative of our work, do things simply and decisively, and don't drag our feet;

2. To improve the overall situation, whether other people's work can be smoother can be used as a yardstick to measure work;

3. Seize every opportunity to improve professional ability and strengthen the usual knowledge summary;

4. Thinking and practice of fine chemical industry.

As a new employee, all places need to learn. Listen more, watch more, think more, do more and communicate more. Learn from every employee their excellent work habits, rich professional skills, and cooperate with the continuous progress of practical work. No matter what the environment, I believe these two points: first, there must be a teacher in a threesome, and second, there must be a reward in heaven. Sometimes I deeply realize that if you put your energy into it, it is impossible to achieve perfection in your work. After all, the work items are too complicated, and there are many projects and few people will understand them, but you should make more and learn more. I

believe that as long as I do things seriously and treat people honestly, I will definitely become a qualified talent in the company.

personal work summary of the builder 2

1. Completion of the project progress:

The project department was set up in May, and the basement structure of the _ _ _ building was added before the construction was reported according to the owner's requirements, and the secondary construction of the office area and the construction of the workers' living quarters were completed during the owner's pile foundation construction; On December 5, the owner started to intervene in the construction when the earthwork was not finished and the foundation pit support was not finished. Before December 27, the construction of foundation brick mold and bottom cushion, and the installation and acceptance of tower crane were completed.

II. Summary of construction progress control

From December 5th, _ _ Group officially issued the commencement order to this project, and the project department completed the construction according to the owner's requirements, planned the construction personnel, construction machinery and construction materials in advance, issued the construction task list to all construction teams, and quantified the feasibility of the workload and the corresponding operators in the construction task list, so as to meet the requirements of the project construction, and at the same time, did not cause.

III. Summary of Construction Quality Control

In order to build the office building project of _ _ Building into a project that the owner is satisfied with, all employees of the project department earnestly implement the project quality objectives, take their own management responsibilities according to the company's quality policy, and organize the construction and management scientifically and effectively.

quality is the life of an enterprise, and it is also the guarantee for the enterprise to create benefits. Creating high-quality projects is the purpose of our project department and the will of all employees in the project department. In order to achieve the predetermined quality objectives, in the process of project construction, our project department has formulated a set of feasible quality management schemes:

① The project construction adopts the system of model and technical disclosure, and the technical disclosure is clear: starting from the operation, the technicians give technical and quality guidance to the workers seriously, so that the workers can firmly grasp various construction technologies and ensure that every worker can understand the operation requirements and master the specifications and standards.

for the key and difficult points in the project construction, disclose to the relevant construction teams and personnel before construction, and strictly control the construction quality standards. Changed the previous practice of technical disclosure as a mere formality, and let all managers of the project department erect quality objectives, and follow them in all construction processes according to the established quality objectives. Judging from the current construction situation, this management method is effective and practical.

② materials entering the construction site are strictly controlled.

check and test the quantity and quality of the materials entering the site, and exit the materials that do not meet the quality requirements (for example, if the quality of the first batch of templates fails to meet the requirements during the construction of adding some basements, it is determined to return them).

③ Strengthen the quality control of the construction process, requiring the builder to make disclosure before the construction of each sub-project, and inspect it during the construction, and rework it in time when unqualified parts are found. Control the construction quality during the construction process, strengthen the system of "self-inspection, mutual inspection and handover inspection" and the inspection and acceptance of the builders of the project department, and strictly implement the reward and punishment system for unqualified samples, which improves the sense of responsibility of managers and workers and avoids the delay of construction period and the waste of materials caused by rework.

(4) reasonable overall arrangement of construction procedures and cross-operation, saving time limit for a project, instilling in the whole project management team the idea that saving time limit for a project means saving costs and creating benefits, establishing a protection system for finished construction products, and earnestly implementing it in construction.

IV. Summary of Safe and Civilized Construction

① Civilized construction management at the construction site, fully enclosed management for the office building project of _ _ Building, hardening treatment for the main construction site, and all temporary facilities and site layout are implemented according to the current standardized construction standards in Dongguan. Make the layout reasonable, the construction site neat and orderly, the materials neatly stacked, the safety signs obvious, and the labor discipline strict. The construction work is standardized, standardized and institutionalized, and everything has rules to follow, with special personnel in charge, supervision and well documented. Strictly control civilized construction and establish the project image and corporate image.

(2) Improve the safety production system, strengthen the management of construction safety, fire safety and property safety of the project department, carry out safety education disclosure for workers, resolutely implement the idea of putting safety first and prevention first, rectify and eliminate potential safety hazards at the construction site as soon as possible, equip the construction area of living quarters and office areas with perfect fire-fighting facilities according to standardized requirements, strengthen the quality of site security personnel, clarify the responsibilities of security personnel, and resolutely dismiss irresponsible security personnel.

personal work summary of the builder 3

__ years is about to pass, and a new year is about to begin. I have been working in a project department for four years unconsciously. Looking back on the work process in the past four years, I really feel that four years have passed quietly with a flick of my finger. 2__ is a busy and fulfilling year for me. When I say goodbye to the old and welcome the new, summing up the experience and lessons from my work in the past year will help me to make full use of my strengths and avoid weaknesses in my future work. After the project starts, I am mainly responsible for the electrical engineering of buildings 1 #-13 # in the North District, and also supervise the temporary electricity consumption at the scene. With the support of the leaders of the project department and the enthusiastic help of colleagues, I have full confidence in my work and complete my work in a pleasant and relaxed environment. During this period of work, I will summarize my work in the past year in several aspects.

I. Engineering drawing review and technical disclosure

When I received a certain engineering drawing, I immediately reviewed the drawing, and checked the drawing design content, power distribution system, fire protection system and weak current system one by one, so as to solve it in time during the blue prints.the design. In case of conflict with the construction in the drawings, timely handle the project negotiation, so as to lay a favorable foundation for the smooth progress of the project. According to the approved construction organization design and construction scheme and the current quality acceptance standard, the technical disclosure of technical quality, safety and fire protection for the construction team I manage is carried out. Due to the lack of design drawings to meet the use function, Party A's temporary changes often occur during the construction process, and the changes that can be signed before the construction are timely and accurate, while some of them can't be signed before the construction, and they will be verified immediately after the construction is completed.

2. Site construction management and strict control of quality

In order to improve the quality awareness of the construction team, the team leader is given corresponding preventive measures for the defects of quality, reserved rebar box and reserved pipeline protection of the secondary structure, and a special meeting of electrical engineering is held at the same time to analyze the causes of the common faults of pipeline laying in the main body reservation and put forward corresponding preventive plans, and negotiate with the civil construction team in time so as not to affect the progress of the main body project. Subsequently, strict requirements were made on the construction quality of this department, and the quality problems in each building were inspected and rectified in time. In order to better cooperate with the overall progress of the project, the working procedures that affect the overall progress of the project will be solved on the spot in time.

Third, raw material control and data archiving

With the intensification of market competition, all kinds of unqualified products can enter the site at any time. In order to ensure the engineering quality, all electrical materials entering the site are strictly inspected. I fully realized the importance and arduousness of this work, so I made up my mind to do this work well and prevent unqualified materials from entering the construction site. In March, the project department launched the "Three Guarantees and One Reduction" campaign. In order to avoid the waste or loss of engineering raw materials, I issued a notice on the cleaning and utilization of raw materials to all construction teams. At the same time, the route of the electrical construction drawings was redesigned without changing the design intention of the construction drawings, which played a certain role in the management of the building number. During the construction of the main body of the project, I collected the building number information managed by me in a timely and accurate manner, and conducted material tests, concealed works acceptance, inspection lot quality acceptance, and partial works quality acceptance, and found the signature and seal of the land engineer and supervision engineer of Party A in time, so as to ensure that the dates of inspection lot, partial division, concealed acceptance and material test of construction materials can be consistent with the actual construction date, which meets the requirements of construction data compilation. And the engineering data are sorted and filed in time to ensure the authenticity, integrity and effectiveness of the construction data.

IV. Safe and civilized construction

According to the spirit of safety instructions of the project department, the temporary electricity consumption and civilized construction on the construction site are inspected every Monday. I am mainly responsible for the temporary electricity inspection in the North District, and handle any potential safety hazards in time. It reduces the occurrence of electricity safety accidents in the construction process, and creates favorable conditions for the smooth construction of the overall project.

During my working time in a certain project, my biggest gains are:

1. Quality control of each building

2. Reducing the cross-working surface between this project and the overall project

3. Controlling the waste of raw materials

4. The ability to deal with practical problems in the construction site.

the biggest deficiency in my work:

○○○○○○○○○○○○○○○○○○○○○○○○○○

Future work plan:

By summing up my work in the past year, I find out many shortcomings in my work, so that I can overcome them in my future work. At the same time, I need to read more books, study well the norms and regulations and relevant documents, master professional knowledge, improve my work ability, strengthen my sense of responsibility, and do my work well in time. Generally speaking, I don't feel satisfied with my work in a certain project. I will constantly sum up and reflect on my future work, constantly spur myself and enrich my energy, overcome my work shortcomings, and strive to learn new working methods to improve my work level. I firmly believe that I will improve myself in my future work. Adapt to the times and the development of enterprises, make progress and grow with the company.