Joke Collection Website - Bulletin headlines - What is safe and civilized construction?
What is safe and civilized construction?
article 2 (definition)
civilized construction as mentioned in these provisions refers to the construction activities in which measures are taken in accordance with regulations to ensure the working environment of the construction site, improve the city appearance and environmental sanitation, maintain the health of construction workers and effectively reduce the impact on the surrounding environment.
article 3 (scope of application)
these provisions shall be observed when engaging in construction projects, house demolition and other related activities and their supervision and management within the administrative area of this municipality.
article 4 (administrative department)
the municipal administrative department of construction and transportation is the administrative department in charge of civilized construction of construction projects in this municipality; City construction market management agencies are responsible for the daily supervision and management of civilized construction of construction projects in this city.
the construction administrative departments of all districts (counties) in this municipality shall be responsible for the supervision and management of civilized construction of construction projects within their respective administrative areas according to their duties and powers.
other relevant administrative departments of this municipality shall, in accordance with their respective responsibilities, cooperate in the implementation of these provisions.
article 5 (requirements for project bidding and contract awarding)
when bidding for construction projects and house demolition or directly awarding contracts, the construction unit shall specify the requirements and measures for civilized construction of design, construction or supervision units in the bidding documents or contract awarding.
article 6 (cost of civilized construction measures)
when preparing the budgetary estimate and budget of the project, the construction unit shall determine the cost of civilized construction measures in accordance with the relevant provisions of the state, and separately list the items of civilized construction costs in the bidding documents or project contracting contracts.
the construction unit shall, when handling the safety and quality supervision procedures of the construction project, provide a list of civilized construction measures and pay the civilized construction measures to the construction unit in time according to the contract. The construction unit shall earmark the civilized construction measures.
the municipal administrative department of construction and transportation shall, jointly with the municipal development and reform, finance and other relevant departments, formulate specific quotas for civilized construction measures.
article 7 (requirements for on-site investigation)
before the design documents of the construction project are finalized, the construction unit shall organize the design unit and relevant pipeline units to conduct on-site investigation on buildings, structures, pipelines and facilities around the construction project, and put forward specific technical measures and requirements for civilized construction.
the construction unit shall submit the specific technical measures and requirements for civilized construction to the design unit and the construction unit in written form.
article 8 (requirements for design and construction documents)
when compiling design documents, the design unit shall put forward protection requirements for buildings, structures and various pipelines and facilities around the construction project according to the survey documents of the construction project and the written opinions on civilized construction provided by the construction unit, and give priority to the selection of construction technologies, processes and building materials conducive to civilized construction.
the construction unit shall, according to the written opinions of the construction unit on civilized construction, specify the specific measures for civilized construction in the construction organization design documents and implement them.
article 9 (supervision requirements)
the supervision unit shall include civilized construction in the scope of supervision, and supervise the implementation of civilized construction measures and the use of civilized construction measures fees by the construction unit.
in the process of supervision, if the supervision unit finds that the construction unit has violated civilized construction, it shall require the construction unit to make rectification; If the circumstances are serious, the construction unit shall be required to suspend the construction and report to the construction unit. If the construction unit refuses to rectify or stop the construction, the supervision unit shall report to the construction administrative department in time.
after receiving the report from the supervision unit, the construction administrative department shall promptly go to the construction site for investigation.
article 1 (construction nameplate)
the construction unit shall set up a construction nameplate in a conspicuous position on the construction site.
the construction nameplate shall indicate the following contents:
(1) the name of the construction project, the scope and area of the construction site;
(2) the names of the construction unit, design unit and construction unit and the name of the person in charge of the project;
(3) commencement date, completion date and supervision telephone number;
(4) night construction time, permission and filing;
(5) specific measures for civilized construction;
(6) other contents that should be publicized according to law.
article 11 (enclosure setting)
except for pipeline projects, water conservancy projects, urban road projects and highway projects that are not fully enclosed, the construction unit shall set up continuous and closed enclosures around the construction site. The setting of the enclosure on the construction site of a construction project shall meet the following requirements:
(1) Hard materials with specified strength shall be used, with a firm foundation and a smooth and clean surface. ......> >
question 2: what are the main contents of site safety and civilized construction? Safety protection and civilized construction of building projects mainly include
1. Civilized construction and environmental protection:
(1) Safety warning signs: obvious safety warning signs that meet the requirements of national standards shall be set at places prone to casualty accidents (or dangers);
(2) site enclosure: the site adopts a closed enclosure with a height of not less than 1.8 m, and the enclosure materials can be colored, shaped steel plates, bricks, concrete blocks and other walls.
(3) signboard: hanging five boards at the entrance, including the general situation of the project, the list of management personnel and the telephone number for supervision, safe production, civilized construction and fire protection; General plan of the construction site.
(4) corporate logo: the entrance to the site should be equipped with the corporate logo or corporate logo.
(5) Appearance of the site: the roads are smooth, the drainage ditch and drainage facilities are smooth, the ground of the site is hardened and afforested.
(6) Material stacking: when materials, components and tools are stacked, signs such as names, varieties and specifications are hung. Cement and other fine-grained building materials that are easy to fly should be stored in a sealed manner or covered, and flammable, explosive, toxic and harmful materials should be stored in different categories.
(7) On-site fire prevention: the configuration of fire-fighting equipment is reasonable and meets the fire-fighting requirements.
(8) garbage removal: a closed garbage station should be set up at the construction site, and construction garbage and domestic garbage should be stored separately.
2. Temporary facilities
(1) On-site office and living facilities: The office, living area and working area on the construction site are set separately, keeping a safe distance, and the office, dormitory, canteen, toilet, drinking water and rest place on the construction site meet the hygiene and safety requirements.
(2) Temporary power consumption on the construction site: five-core cable, four-core cable and three-core cable shall be equipped according to the requirements of TN-S system; Erect poles, cross arms, porcelain clips, porcelain bottles, etc. of temporary power lines as required, or trench where cables are buried; For external power lines close to the construction site, protective facilities such as wood and plastic insulators shall be provided; According to the requirements of three-level power distribution, it is equipped with three types of standard electrical boxes: general distribution box, distribution box and switch box. The switch box shall conform to one machine, one box, one brake and one leakage. All kinds of electrical appliances in the three types of electrical boxes should be qualified products; According to the requirements of two-level protection, select the leakage protectors in the general distribution box and switch box that meet the capacity requirements and qualified quality; There shall be no less than three repeated earthing points for protection change on the construction site.
3. Safe construction
(1) Edge protection for floors, roofs, balconies, etc.: Close-mesh safety net is used, and protective railings on both sides and skirting boards with height of 18cm are added to the operation floor.
(2) protection of access opening: a protective shed shall be set up, which shall be a wooden board with a thickness of not less than 5cm or two bamboo basketry with a distance of 5cm. Both sides should be closed with dense mesh safety net along the railing frame.
(3) reserved hole protection: fully enclosed with wooden boards; The short side of the hole is more than 1.5m long, and there should be protective railings around it besides being closed.
(4) elevator wellhead protection: set up a stereotyped, instrumentalized and standardized protective door; Set a safety flat net every two floors (not more than 1m) in the elevator shaft.
(5) Stair side protection: 1.2m high stereotyped, tooled and standardized protective railings and 18cm high skirting boards are provided.
(6) protection for vertical cross operation: set up protective isolation shed or other facilities.
(7) protection for aerial work: there are suspension cables or other facilities for hanging safety belts; Have an operating platform; There are up and down ladders or other forms of access.
Question 3: What construction safety information includes:
1. Safety production responsibility system 2. Target management 3. Construction organization design 4. Safety technical disclosure of divisional/sub-divisional projects, safety inspection 6. Safety education 7. Pre-shift safety activities 8. Special operations with certificates 9. Engineering accident handling 1. Safety signs
11. Management of temporary facilities fee and permit for safety protection 12. Acceptance and inspection records of all kinds of equipment and facilities 13. Civilized construction
Question 4: What aspects of safety civilized construction measures in construction projects include 1. Safety protection appliances: safety nets, safety belts, helmets, etc.
2. portal and edge protection facilities: edge safety protection facilities such as stairway, elevator portal, passage portal, reserved portal, balcony periphery, floor periphery, roof periphery, foundation pit periphery, both sides of unloading platform and upper and lower passages;
3. All-steel internal and external scaffolding, supporting protective facilities and all-steel main support bars of structural formwork;
four, tower crane, external elevator, tic-tac-toe hoist and other construction lifting equipment and supporting protective facilities;
5. Construction electricity consumption: temporary electricity consumption system, standardized electrical box, electrical protection device, laying of power lines, external protection measures, etc. that meet the requirements of specifications;
VI. Construction machines and tools;
VII. Safety inspection fee: including inspection of construction lifting equipment, external elevators, safety nets, steel pipe scaffolding, etc.
VIII. Safety education and training;
IX. Safety signs, signs and safety bulletin boards;
1. Civilized construction and environmental protection: enclosure of the construction site and hardening of the site, dust control, noise control, drainage measures and garbage discharge;
Xi. Temporary facilities: including office, dormitory, canteen, bathroom, shower room, etc.
XII. Fire fighting equipment and facilities;
XIII. Emergency rescue equipment;
XIV. deformation monitoring of foundation pit support;
XV. Safety protection and monitoring in underground operation.
Question 5: What does the safe and civilized construction plan include? Technical measures for civilized construction
This project is located in-----; The project includes four two-story shops, a five-story (local six-story) commercial office complex building, buildings 1# and 2# with cast-in-place concrete mixed structure, and buildings 3#, 4# and 5# with cast-in-place reinforced concrete frame structure, with seismic grade 4 and total construction area of 13,716 square meters. This project is developed by--------------------------------------------------------------------------------------
Civilized construction is an important content of enterprise spiritual civilization construction and an important measure to speed up the project progress, reduce the project cost, improve the project quality and ensure safe production and construction. Our project department will implement it in the following aspects:
First, do a good job in site layout
According to the requirements of construction progress and construction plan, the construction site will design and compile specific targeted site layout to make the materials piled up and the construction operation smooth and reasonable; And consider from the aspects of safety management, publicity and education. So that the development of safety work can be strongly guaranteed. This project is located in the west of Nanwan Road in Zhapu and the south of Zhongshan Road, and the site appearance of the site has good conditions for civilized construction. At the same time, a project with high management goals should not only have a high starting point, but also cover all aspects. Therefore, it is increasingly prominent and necessary to strengthen the management of civilized construction, and we will try our best to increase investment to improve facilities.
ii. On-site enclosure
The construction area is separated from the office area, and the construction site is separated from the external roads. A fence with a height of 2.5 meters is continuously set around the project to be firm, stable and beautiful. The inside and outside must be painted, and the tone of the facade is white, which visually forms a sense of integrity and stability. The writing contents include the construction unit, survey unit, design unit, construction unit and supervision unit.
Third, closed management
1. Set the gate at the entrance and exit of the construction site with a height of 2.5 meters; The pier height on both sides is 3.2 meters, and the enterprise logo is set on the gate, on which the name of "South Bridge Construction" enterprise is written; The color of the gate is white, and the gate is equipped with two inner doors with a total width of 5 meters. The sign of Nanqiao construction enterprise is in the middle of each door, and the requirement is to ensure the complete position of the sign.
2. A guard room shall be set up at the gate, and the guard shall be a full-time security guard who will patrol on duty 24 hours a day. There should be a guard system, a list of security personnel and their responsibilities in the guard room, and a personnel entry and exit registration file should be established. When project management and construction personnel enter the construction site, they must abide by various safety systems and wear safety helmets and badges correctly.
IV. Construction site
Harden the main road at the entrance of the ground and in front of the office to make it smooth, flat, neat and free of scattered objects. At the same time, do a good job in the temporary water supply and drainage system in the site along the hardened floor, so that the drainage of the site is smooth and there is no water. A smoking room is set up on the site, and smoking at will is strictly prohibited, and greening arrangement is carried out in the open place.
v. stacking of materials
Building materials and turnover materials on the site shall be stacked according to the general construction plan, and the materials shall be sorted and stacked neatly, with name, variety and specification signs attached, so as to be clear at a glance. In paint, oxygen, acetylene bottles and other flammable and explosive places set up obvious danger signs. On-site construction waste is piled up neatly, emphasizing that all types of construction workers must do a good job of cleaning up their hands every day.
VI. On-site fire prevention
The fire prevention responsibility system is strictly implemented at the construction site. Fire prevention and inflammable and explosive materials shall be managed by special personnel, equipped with sufficient and qualified fire-fighting equipment (fire extinguishers and fire boxes, etc.), and the layout shall be reasonable. Smoking is strictly prohibited in woodworking rooms, warehouses and places where inflammable and explosive substances are stored, and special safety measures are taken.
VII. Comprehensive management of public security
Strengthen the education of safety, civilization and courtesy of on-site construction personnel, formulate the public security system, implement the responsibilities, and decompose them into people. Workers should abide by the operating rules, pay attention to the construction of spiritual civilization, set up study and recreation rooms on the site, carry out various kinds of workers' cultural and sports activities, prohibit gambling, fighting and other illegal acts, actively cooperate with the comprehensive improvement of social security, and do a good job in all work. It not only relieves the worries of employees and improves work efficiency, but also strengthens the spiritual civilization construction at the scene.
Set up migrant workers' schools, with "Code for Students in Migrant Workers' Schools" and "Management System for Migrant Workers' Schools" hanging on the wall, and carry out learning activities regularly and irregularly.
- Related articles
- Write an essay about "I am a little environmental protection guard"
- Urgent reminder from Xingtai Xinhe County on epidemic prevention and control measures for express mail
- How to set the background dynamics of WeChat friends circle?
- Complete Buddhist birthday wishes
- What does real estate mean?
- Buddhist shopping slogan
- Inspirational sentences
- What is the difference between team spirit and team training?
- Poetry and famous sayings about messages
- Tian ZibingĄ¯s personal resume and achievements