Joke Collection Website - Bulletin headlines - Minutes of the first supervision meeting

Minutes of the first supervision meeting

Model essay on the minutes of the first supervision meeting (select 6 articles)

In daily study, work or life, meeting minutes are more and more widely used, and meeting minutes are generally written in the third person. So how do you write the minutes of the shareholders' meeting? The following is a sample essay (6 selected articles) of the minutes of the first supervision meeting that I collected. Welcome to read, I hope you will like it.

Minutes of the first supervision meeting 1 Meeting time: xx, xx, XX, XX.

Meeting place: reception room of geological and mining plant

Participating units and personnel:

Supervision unit: Supervision Department of Zijinshan Gold and Copper Mine Project of xxx Co., Ltd.

Participants:

Construction unit:

Participants:

Moderator:

The main topics of the meeting:

Communicate and coordinate the construction situation of No.7 cavern and 10 cavern and the next engineering arrangement, and put forward rectification opinions on the problems existing in each point. First of all, Xia Zhenxing, the supervision unit, conveyed the requirements and spirit of the meeting, requiring the construction unit to carefully organize and manage the contracted projects, put them in place, and complete the plans and targets issued by the mine on schedule. Subsequently, the on-site responsible personnel of the supervision unit and the construction unit expressed their opinions and put forward specific opinions and requirements on the progress, quality and safety of the project. It is hoped that the construction unit will seriously organize the implementation of rectification to ensure that all projects are promoted in an orderly manner, the project quality meets the design and acceptance specifications, and there are no problems in safety production.

The minutes of the meeting are as follows:

1, 7, 10 cavern data is not complete enough (the construction plan has not been reported to the supervision office).

2, 7 cavern lighting measures are not perfect, scaffolding spacing is too large, safe passage is not set.

The imperfect construction organization of No.3 and No.7 caverns leads to time-consuming and laborious work, which seriously affects the construction progress.

4, 7 cavern cable suspension is not standardized enough, which needs rectification.

5, 10 cavern scaffolding spacing is too large, the operating platform is more dangerous, and the cable suspension is too low, so the cable should be suspended according to the specification.

6, 10 cavern bolt mesh plate thickness is not enough, the material needs to be rectified.

7. The construction quality of10 cavern has been improved, but there are still some quality problems in some areas. The construction of anchor rod and anchor net should not be divided into two groups of workers, but should be completed by the same group of workers.

8. The slope of10 measuring well is too large, which has potential safety hazards.

9. Pay-off and set out the No.7 cavern and 10 cavern, and check whether this section is overbreak and crossing the street.

10, technical disclosure to workers, improve safety awareness, and ensure construction quality and safety.

Xxx company limited

Zijinshan gold and copper mine project supervision department

20xx April 1

Minutes of the second supervision meeting:

20xx165438+65438+100: 00 am on October 5.

Location:

Xx site project department office

Conference theme:

Check the implementation of last week's regular meeting and the work arrangement for next week.

Meeting host:

Zhang xx

Meeting contents:

xxx

Construction unit:

Bid 1: Due to personnel problems on floors 8 and 9, the progress of floors 7 and 10 is seriously behind due to personnel and material problems.

Bid Section 2: Building 18 is synchronized with the plan, and Building 17 is two days behind the plan.

Bid Section 3: It is planned to complete the first floor of Building 23 on Wednesday, the first floor of Building 24 on Friday and the first floor on Thursday.

Supervision unit:

1. Safety civilization has not been put in place. The quality inspection station came to check this Tuesday, and the safety and civilization were extremely poor.

2. Quality and progress are equally important. Pay attention to quality while catching up with the construction period. Some technicians have a very weak sense of responsibility, and several steel bar tests failed, which also affected the progress of the project.

3. The current progress is not optimistic, and the construction progress agreed in the contract has not been reached. The biggest problem is the shortage of on-site personnel and materials. Therefore, the project department should solve the problem in time and make a feasible schedule.

4. The problem of safe electricity use yesterday not only affected the progress, but also related to the life safety of construction workers. I hope the project department can find out the reason and deal with it in time.

5. The safety inspection of tower crane was not done properly and was not found in time. The project department is required to complete all tower crane safety inspections within two days and report them to us.

6. The special person's work license is incomplete, the fire control facilities are not in place, and the on-site garbage cleaning is not timely.

Construction unit:

1. According to the relevant requirements of the principal-agent construction agreement, there is no solar hot water system for residential buildings in this plot, so the reserved holes and pipes related to solar energy system in the construction drawing are cancelled.

2. Check the implementation of temporary security for the last time. The security issue should be consistent with words and deeds, as good as the slogan.

3, the safe use of electricity should be carried out in strict accordance with the specifications, equipment should meet the requirements of the specification, and should have enough security officers. In these aspects, the supervisor should strictly control and take fine measures when necessary.

4. In the work, the project owner, supervisor and contractor should cooperate closely, solve problems in time when they are found, communicate more and be considerate, and create a harmonious work team.

The price of cement has been basically stable, so you should contact the original factory.

6. Report the construction organization design plan in time, re-compile the overall construction progress plan of this project, and carry out backfill construction as designed.

7. The problem of progress or personnel. There is a serious shortage of personnel at present. Therefore, the project department should take measures to speed up the progress.

Minutes of the first supervision meeting for 3 times: xx year, xx month, XX day.

Venue: xx Project Department Meeting Room

Meeting theme: check the implementation of last week's regular meeting and the work arrangement for next week.

Moderator: xxx

Meeting minutes: xxx

Construction unit:

Bid 1: it is planned to complete the concrete pouring of the X-floor roof of xx, xx and xx buildings in two days; Xx and xx buildings complete the installation of X building; Complete the X-layer masonry of xx building; Kindergarten completed foundation pouring.

Bid 2: It is planned to arrive at the X-floor supporting beam and formwork of xx building next week; Xx building and column formwork support. I hope that the labor service company can do a good job in material turnover and strive to cap the xx and xx buildings as soon as possible years ago.

Bid 3: xx building plans to pour concrete ten days later; Xx, xx building No.23 completed the main capping.

Supervision unit:

1. Safety: Some external frames are still not in place. In the afternoon, the project department will send people to check and implement them one by one. Before the external frame is installed to a certain height, it is forbidden to construct the sloping roof to ensure that there is no safety problem.

2. The edge of the stair balcony of each building should be well protected to ensure the life safety of the construction workers.

3. The person in charge of each bid section and the safety section chief shall regularly check the tower crane, hoist and construction electricity; It is forbidden to make a fire indoors to keep warm.

4. Now the declaration of safe and civilized construction site has begun. I hope that the project department will strive to do a safe and civilized construction. Site cleaning work should be timely, materials should be neatly stacked, and finished materials and non-finished materials should be classified separately.

5. Quality: The formwork of the thermocline and the gutter must be firmly set up, and the technical management personnel should strictly control it without omission; The roof construction project department should make detailed technical disclosure to the workers to avoid rework.

6, water and electricity installation and powder to cooperate well, before water and electricity installation, try to finish the powder work in the bathroom, and do a good job of finished product protection. At present, the sewer pipe is seriously damaged, and severe punishment will be given if similar phenomena occur again.

7, the recent weather temperature is low, if the construction unit for internal powder construction, must take corresponding heat preservation measures, it is strictly prohibited to internal powder construction without heat preservation measures.

8. Progress: All building numbers should be capped before the year, and the project department and the labor service team should work closely together to complete all building number capping tasks as soon as possible before the year, and kindergartens and community centers should complete plus or minus zero.

9. All projects that can be constructed inside and outside the building are completed as far as possible, creating favorable conditions for the next step.

Minutes of the First Supervision Meeting 4 Project Name:

Conference name:

Meeting host:

Meeting place:

Meeting date:

Participating units and personnel:

Meeting contents:

According to the current progress of the project and the safety problems existing in the construction site, a meeting on strengthening the construction safety supervision was held, which was attended by the safety supervisors of each bid section, to specifically arrange and clarify the tasks and requirements of the next stage of safety supervision. It is hoped that all project supervision departments will abide by it, earnestly perform their duties of safety supervision in the process of supervision, and provide due supervision and guarantee for safe construction. Specific tasks and requirements mainly include the following aspects:

1. Require the project supervision department to conduct a comprehensive safety inspection on the construction site jointly with the project department of the construction unit on 20th of each month, and report the inspection and rectification results to the owner in writing before 25th of that month. Attached is a unified safety checklist.

2. Pay special attention to hidden dangers in construction subdivisional work (such as bridges and culverts) with more hazards, so as to find problems in time and rectify them in time.

3. Supervise the construction unit to organize the rainy season construction in strict accordance with the approved rainy season construction safety measures and schemes.

4. Deep foundation pit and foundation trench should urge the construction unit to do a good job in limb protection facilities and arrange corresponding warning signs.

5. Supervise the construction unit to arrange temporary power lines according to relevant specifications, and do a good job in the safety protection of the power lines that have not been dismantled in the working face to ensure a safe distance.

6. Urge the construction unit to strengthen the safety education for the drivers of construction transport vehicles to prevent casualties and ultimately affect the construction period.

7. Supervise the construction personnel on the construction site to wear safety helmets, and ask the supervisors to take the lead.

8. Each project supervision department is required to be equipped with a full-time safety supervisor, and the owner will check the site safety together with the full-time safety supervisor irregularly.

9. Other contents that should be paid attention to in strengthening supervision:

(1) Earthwork excavated in the drainage ditch shall be piled up beside the ditch according to the requirements of construction specifications.

(2) Make temporary drainage around the subgrade to prevent the formed subgrade from being soaked by water.

(3) If you need to use the formed subgrade for paving, you can only pass in a fixed area, and you are not allowed to occupy other areas without authorization, so as not to damage the subgrade.

Minutes of the First Supervision Meeting 565438+1October 30th, the first on-site meeting of Tangjiaba River, Zhongxing Bridge Port and Wujiashe Port in Hangzhou was held in the conference room of the municipal engineering project department of Tangjiaba River comprehensive improvement project. The meeting was attended by the construction unit, supervision unit and the construction unit of each bid section. The meeting was presided over by xx, Yuhang District Urban Construction Office, Hangzhou. The meeting mainly introduced the situation of all parties, including their respective on-site organizations, personnel and their division of labor, and the construction unit reported the preparation for entering the site. The supervision unit introduces the main contents of supervision planning and puts forward relevant requirements for each bid section; The owner announced the authorization and introduced the project preparation, and at the same time put forward opinions and requirements for the construction preparation of the construction unit, and finally formed the following minutes:

1. xx, the site manager of the construction unit, introduced the safety hidden trouble investigation, monthly supervision report, monthly construction report, contact list, attendance and other related project management requirements of the construction unit. At the same time, the organization and division of labor of the participating units on site are introduced.

2. The construction unit introduced the general situation of current work: Tangjiabahe municipal unit can organize construction at present; Wu Jiasheng port municipal units can organize their own construction; Other units should make good preparations for construction, and then organize construction according to the situation of land acquisition and demolition.

3. The supervision unit of this project: Hangzhou Tianheng Investment and Construction Management Co., Ltd. The main personnel are Yang Weifeng (director) and Lu Ping (professional supervision engineer), and other personnel will be deployed with the progress of the project.

4. Introduction by Director Yang Weifeng

(1) supervision planning.

(2) The schemes submitted for approval in the near future include: overall construction organization design, lower pile foundation construction scheme, safe and civilized construction scheme, etc.

(3) Materials and equipment submitted for approval; The project department shall handle quality and safety inspection and filing as soon as possible.

(4) Acceptance procedure for concealed works: if the self-inspection is qualified-after being reported to the supervisor for acceptance-proceed to the next working procedure.

5. Emphasize the necessary system: site meeting system: twice a month, at 9: 00 a.m. on June 5438+05 and 30, respectively, the site meeting was held in Tangjiaba site office on time, attended by the person in charge of the construction site, the main person in charge of the construction unit and the person in charge of the supervision unit.

Report the current production situation and the next step plan, and all units communicate and discuss the problems existing in the current construction and construction-related matters; Monthly report system: work flow, in strict accordance with the system norms;

6, the work in place, including the surrounding coordination, personnel level 3 safety education; Requirements for the supervision unit: the supervision party is required to attach great importance to the construction site, and the construction party actively cooperates, and the approval cannot exceed its authority; Construction and supervision should actively cooperate with the owner's work and strengthen internal communication.

7. Require the construction unit to recheck and measure the delivered leveling points.

8. Tangjiaba municipal units and Wujiashe municipal units have made preparations for construction according to the construction scope, and can enter the site for construction immediately.

Minutes of the First Supervision Meeting 6 Project Name:

Meeting place:

Meeting time:

Participants:

Meeting host:

Meeting minutes:

One is on-site management; All personnel must work with certificates, step by step. The completed project requires the construction unit to conduct self-inspection first, and make safety signs to ensure the quality and safety of the project and provide guarantee for the construction of an effective and qualified project.

Second, the quality problem; First, when it comes to quality, we must first control the quality of raw materials. Without qualified raw materials, there is no qualified project, and without the inspection report of raw materials, it is regarded as unqualified project. According to the second measurement basis and the mixture ratio given by the laboratory, there should be special personnel to cooperate in the construction site, and special measuring instruments should be placed near the mixing station. Third, the project data should be synchronized with the project construction progress.

Third, the issue of progress; There is not much time left in the progress of our project. Similarly, in order to save costs, we must speed up the construction progress. The weather is ok at present, but it will change at any time in the future.

Fourth, construction safety; Our engineering front is long and mobile, so we should pay special attention to traffic safety. It is impossible for our construction site to be completely closed. We should pay attention to our own safety and the safety of others. The next one is building safety. In the process of digging construction trench, because our trench is deep, we should prevent landslide, observe flexibly at the same time, pay attention to the trend of excavator and dodge in time. At the same time, our wires must be protected and their erection must be standardized.

Five, data management, must be synchronized with the construction at any time, to have specialized personnel to manage.

Director Zhao and Director Chen finally made a concluding speech, demanding that the principle of paying equal attention to quality and progress and putting safety first should be adhered to to to do a good job in this project. Manager Li and Manager Zhang finally made up their minds and won the battle according to the requirements of the leaders.

;