Joke Collection Website - Bulletin headlines - Ten rules for civilized construction on the construction site?

Ten rules for civilized construction on the construction site?

1. A 2.5-meter-high enclosure must be set up on the construction site, and closed management shall be implemented. Two, the construction site import and export must be set up iron or wooden gatehouse, gatehouse height not less than 3.5 meters, width not less than 4 meters. Enterprise logo should be set at the door head, and standardized safety slogans should be set at the top and both sides of the gate building. Three, the entrance to the construction site must be set up with a unified "five cards and one map". Four, the construction site should be "three links and one leveling", and the pavement in the site should be hardened, and the separation of "three areas" (operation area, material area and living area) must be implemented. Five, the construction site of all kinds of building materials, components, materials, etc. should be in accordance with the provisions of the position, classification, stacking, stacking, neat, and set up signs. Six, construction personnel strictly abide by the Fushun environmental noise pollution prevention and control miscellaneous cases. In line with the principle of "whoever pollutes is responsible", it is strictly forbidden to work overtime and the noise will disturb the people. General construction time limit: 5 am-1 pm. Construction period from June to mid-July: 6: a.m. to 8: p.m. Seven, strictly abide by the relevant provisions of environmental protection, take measures to control the environmental pollution of all kinds of dust, waste gas, waste water and solid waste, and prohibit throwing and dumping construction waste in the air. Simple gravel access roads should be laid at the entrance and exit of the construction site, and facilities for cleaning wheels should be set to prevent the wheels from getting muddy on the road. Eight, the construction personnel are not allowed to urinate anywhere on the floor, and are not allowed to dump domestic garbage at will. Household appliances should be placed in a clean, tidy and orderly manner. Nine, construction personnel should pay attention to their own language accomplishment, do not swear words, and be polite to others. Ten, the construction site should be "four in time" and "six clean": "four in time": after the completion of the three heads (bricks, wood heads, steel heads), ground ash, residual soil and remaining materials in a timely manner. "Six cleanings": the working surface is clean, the material bottom is clean, the machinery is clean, the mixer is clean, the scaffold is clean, and the safety net is clean.

for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd