Joke Collection Website - Bulletin headlines - State regulations on the installation of cell phone signal towers

State regulations on the installation of cell phone signal towers

Legal analysis: the base station antenna is installed on the building or transmission tower at a distance of 0/5-50 meters from the ground. According to China's laws, the construction of mobile communication base stations must meet the requirements of Regulations on Protection of Electromagnetic Radiation and Hygienic Standard for Environmental Electromagnetic Waves. It is stipulated that as long as the electric field intensity is less than 0/2 volt per meter/kloc-or the power density is less than 40 microwatts per square centimeter, it will meet the safety standards, even lower than the radiation level of mobile phones and computers, so it will not affect the health of nearby residents.

Legal basis: Article 42 of the Environmental Protection Law of People's Republic of China (PRC), enterprises, institutions and other producers and operators that discharge pollutants shall take measures to prevent and control the pollution and harm of waste gas, waste water, waste residue, medical waste, dust, malodorous gas, radioactive substances, noise, vibration, light radiation and electromagnetic radiation to the environment.

Enterprises and institutions that discharge pollutants shall establish a responsibility system for environmental protection, and clarify the responsibilities of the person in charge of the unit and relevant personnel.

Key pollutant discharge units shall install and use monitoring equipment in accordance with relevant state regulations and monitoring norms, ensure the normal operation of monitoring equipment, and keep original monitoring records.

It is strictly prohibited to illegally discharge pollutants through concealed pipes, seepage wells, seepage pits, perfusion or tampering with or forging monitoring data, or through the abnormal operation of pollution prevention facilities to avoid supervision.