Joke Collection Website - Bulletin headlines - Operating hours of Xi Metro Line 2

Operating hours of Xi Metro Line 2

06: 00-23: 50 Xi Metro Line 2 is the first subway line built in Xi, Shaanxi Province, China. Construction started on September 29, 2006, and the northern section of the first phase project (Xi North Station to Convention and Exhibition Center Station) was opened to traffic on September 6, 20 1 1. Xi Metro Line 2 runs north-south, starting from weiyang district Xi North Station in the north, passing through Lianhu District, Xincheng District, beilin district and Yanta District, and reaching Quweinan Station in Chang 'an District in the south. It is the core line running through the north-south central axis of Xi city. As of February 5, 2022, the total length of Xi Metro Line 2 is 26.5 kilometers, all of which are underground. * * * Station 2 1 block, all underground stations; The train adopts 6 B-type trains. As of May 9, 2065438, the daily maximum passenger flow of Xi Metro Line 2 was 1257600 passengers. On April 22nd, 2022, the first renewable energy popular science subway train initiated by Longji Green Energy Technology Co., Ltd. departed from Xi Metro Line 2 1 1.