Joke Collection Website - Bulletin headlines - What is the "August 1st Edition" of architecture?

What is the "August 1st Edition" of architecture?

"Eight pictures and one edition" may have different names in different places.

For example, some people say that "seven cards and one map" mainly include: project introduction and quality supervision report phone card, project leader card, safety production system card, fire protection system card, environmental protection system card, engineering excellence card, civilized construction and site construction layout card. The size of the single frame is1.2× 0.64m, with 25mm surrounding frame, 8mm thick line and 4mm thin line. The panel is made of steel plate with blue background, and the font is bold. The title text is red and white, and the font height is 45 mm. The content text is white on blue background. The logo is fixed by angle steel and the steel pipe is erected. The height from the bottom of the signboard to the ground is1.3m. In general, the "Seven Signs and One Map" is placed in an eye-catching position near the entrance to the construction site. 1. On-site project introduction and quality supervision report calling card: project name, project overview, main engineering quantity, construction scope, name of construction, design, construction, supervision unit, commencement date and supervision telephone number reported by quality supervision department: for example: project overview: project name: project owner: design unit: project owner: survey unit: project owner: supervision unit: director. For example: organization list Project manager: builder: technician: quality inspector: safety officer: tester: material clerk: data clerk: bricklayer's class: carpenter's class: steel bar class: paint class: electrician's class: hydraulic class: shelf class: welder's class: III. Safety production system board: mainly introduces the objectives and requirements of safety production. For example: safety in production 10 measures 1, use of "three treasures" according to regulations; 2. Complete and effective protective devices for mechanical equipment; 3. The machine is not allowed to run with diseases, overload or carry out maintenance during operation. 4, the erection of wires must conform to the requirements, all electrical equipment to zero grounding. 5. Electric machinery and hand-held electric tools have leakage and tripping devices. 6, scaffolding materials and put, must conform to the requirements of the specification. 7, all kinds of cables and their devices must conform to the requirements of the regulations. 8. When working high above the ground, it is forbidden to wear high heels, slippers, hard-soled shoes and shoes with nails. 9. The "four entrances" of the construction site must be protected by cover plates, and red lights should be set up at night to warn them. 10, the roads on the construction site are clear and the materials and components are neatly stacked. Fourth, the fire control system card: fire control points and daily safety production fire control work. Fill in according to Article 10 and Article 18 of the Measures for Fire Control Management in the document of "Six in One" management system. For example: 1, when compiling the construction organization design, there should be fire safety requirements. 2, the construction site barrack construction, between areas to comply with fire regulations. 3, all overhead wires, fixed with porcelain, wall line must wear tube. 4, hot work on the construction site, must be approved by the relevant departments before hot work. 5. Fire prevention signs should be posted in warehouses, wooden sheds and places where inflammable and explosive articles are piled up on the construction site. 6, the construction site must be equipped with a sufficient number of fire prevention facilities and equipment. 7. Establish the fire safety responsibility system and divide the fire safety responsibility area. 8, the construction site should have someone on duty, found theft report in time. 9, the construction personnel are not allowed to enter the site, must wear a helmet when entering. 10, take things out and check them before releasing them. 5. Environmental protection system board: According to the special requirements of environmental protection where the project is located, formulate a practical system that meets the requirements of national laws and local environmental protection laws and regulations. For example: 1, no spitting, littering, scraps of paper and cigarette butts. 2. Don't run the red light and walk freely. 3, no parking, the road is crowded. 4. Don't set up stalls, which will affect traffic and health. 5. Don't build indiscriminately, which will damage the city appearance. 6. Don't litter. 7. Don't scribble and paste, set up advertisements and slogans. 8, do not damage the green space, occupy the green space. 6. Brand for creating excellence in engineering, such as: Ten prohibitions on the construction site 1, and no one is allowed to enter the construction site without wearing a safety helmet. 2, don't wear a seat belt, are not allowed to climb. 3, the mechanical operators, are not allowed to start the mechanical equipment. 4, hanging basket it is forbidden to manned, are not allowed to take people up and down. 5. Scaffolding materials and all protective facilities on the construction site are not allowed to be removed. 6, mixer hopper, are not allowed to stand. 7, high homework personnel are not allowed to throw debris from top to bottom. 8, are not allowed to wear slippers or barefoot into the construction site. 9. Children are not allowed to enter the construction site. 10, it is forbidden to work after drinking. Vii. Civilized construction brands, such as: Ten Standards for Civilized Construction 1, sign the "Three Guarantees" management contract in front of the door, specify the responsible person and make a list. 2, civilized construction should be included in the organization design content, the site should have the construction site plan. 3. There should be brick walls around the construction site. 4, construction machinery, building materials, garbage piled up according to the layout. 5, the main entrance to the construction site to set the door. 6, the construction site to achieve smooth roads, no water, material classification piled up, garbage removal in time. 7, transport all kinds of building materials, garbage should be protected. 8, the construction site water, organized emissions after precipitation. 9, after the completion of the project, it is necessary to do the work, the expected net site is clear, and the shed is dismantled in time. 10, strengthen employee education and do a good job in surrounding mass relations.