Technical guarantee measures for intelligent system engineering construction?

What are the technical guarantee measures for the construction of intelligent system engineering? The following is a detailed introduction of Zhong Da Consulting for your reference.

Technical guarantee measures for intelligent system engineering construction

The basic principle of 1

1, in strict accordance with the requirements of construction drawings and construction materials.

2, establish a strong construction management team, overall command.

3, strictly control the quality of materials, all materials should be consistent with the sample, conditional need to have a quality guarantee.

4. Carry out the construction in strict accordance with the design and construction specifications, and implement the system of technical quality disclosure before construction, self-inspection and mutual inspection during construction, shift inspection and attendance of technicians, and conduct quality inspection and evaluation after the completion of sub-projects.

5, completes the construction model, after approved by relevant personnel to implement subdivisional work.

2 technical management

1, organize forces to do a good job of the blue prints.the design of construction, solve problems on drawings in time, and be coordinated by the technical director of the project.

2, designated persons responsible for the preparation of each individual construction scheme and process card, and combined with the actual construction strict review and follow-up inspection.

3. Organize a sample review team for processing orders, manage internal and external processing orders in a unified way, and implement a re-inspection system for processing orders.

4, in the process of construction, pay attention to information feedback, carefully accumulate technical data, so as to revise the construction plan at any time.

5. Hold a technical meeting every day to summarize the technical problems that occurred that day, which shall be coordinated by the technical director of the project.

3 construction site management system

In order to further strengthen the management of the construction site, effectively ensure the implementation of various management systems on the construction site, and achieve the purpose of civilized construction and safe production, these regulations are formulated.

1. People unrelated to work must wear cheating cards when entering the construction site. The doorman has the right to prevent them from entering the construction site. For those who make trouble unreasonably and deliberately, the doorman has the right to stop them and punish them according to their situation

2, enter the construction site must wear a helmet, it is forbidden to enter without a wearer.

3, smoking is strictly prohibited on the construction site, barefoot, slippers or high heels are not allowed. It is forbidden to make noise and engage in things unrelated to work in the venue. No visitors during working hours.

4, the construction site should be equipped with enough fire fighting equipment, flammable and combustible items should be piled up separately, and managed by special personnel, temporary electricity consumption by full-time professionals management, operation, prohibit other personnel to pull, pull temporary electricity consumption.

5. Improve safety awareness and install protective railings, protective nets and other facilities for elevators, windows and dangerous parts. Warning signs and safety slogans must be hung on the construction site.

6. Pay attention to on-site safety production. Safety belts must be worn for aerial work above 3m, and labor protection articles and safety articles must be used correctly; Scaffolding and operating platform for aerial work shall be stable and reliable; Use ladders correctly.

7. Without permission, no one is allowed to leave the site with materials and tools.

4 Strict ordering system

1, accuracy: the variety, specification and quantity of materials are in accordance with the design.

2. Reliability: the material performance and quality meet the standards.

3. Timely: The delivery time is fixed.

4. Economy: The price of materials should be lower than the market price.

5 Strict warehousing procedures

1. Materials that fail inspection or are damaged during transportation shall not be put into storage.

2. Materials shall be stored and stacked according to their classification, and appropriate storage measures shall be taken according to their respective characteristics. Wood products, carpets and wallpaper should be moisture-proof, sun-proof and rat-proof. Paint and thinner should be stored separately, and pay attention to fire prevention.

3. Small items and valuables should be packed and kept to prevent theft.

6 Strict outbound procedures

The team shall fill in the requisition list with the construction task list, handle the material delivery, and implement the responsibility system for special material acquisition. When the workload is 70% completed, the inventory shall be counted, the feeding shall be strictly controlled, and the remaining construction materials shall be returned to the warehouse in time.