Joke Collection Website - Bulletin headlines - Safety production summary in August
Safety production summary in August
Safety production summary in August
The safety production work in August is carried out to comprehensively improve the public’s awareness, satisfaction and participation in safety construction and create a good public opinion atmosphere. Now come with me to read the summary of production safety in August. I believe it can inspire everyone.
Article 1: Summary of production safety in August
1. Production safety situation this month
Due to the decision to rush the construction period, the on-site safety situation took a turn for the worse. Performance:
①. The lifting machinery is used in violation of regulations and ordered to lift steel bars of different specifications and models with different lengths on the same hook. The shortest is close to 500mm and the longest is about 6000mm. Such lifting of short steel bars It is easy to fall and injure construction workers below within the turning radius. The signal workers did not check the safety of the tied objects before lifting them. During the cleaning process of the north side car ramp, the steel bars were lifted with concrete blocks mixed in them. Once the concrete blocks were lifted during the lifting process, If it falls, it will inevitably injure the construction workers below the running track. In response to this problem, the supervisor promptly issued the Safety Supervision Notice No. 0xx on August 11, 20xx. The general contractor conducted safety education for the tower crane and signal workers, and signed a tower crane operation guarantee letter with the tower crane company, which temporarily eliminated the problem. Reoccurrence of unsafe operations and violations.
②. The safety management of the construction site this month was somewhat out of control, resulting in poor civilized construction at the construction site. Dirty, messy, and poor management represent an imbalance in the management of the construction site. There is no safe passage for smooth passage at the site. The construction surface is very difficult and some construction workers have to climb tower cranes, climb formwork, climb steel bars or drill around to reach the construction surface. The main reason is that the on-site safe and civilized construction management is not in place. In response to this problem, the supervisor raised this issue at the regular supervision meeting on August 16, 20xx, and required the general contractor to immediately organize personnel to implement rectifications. Leaders at all levels of the general contracting unit attached great importance to the work. They held a production safety meeting immediately after the regular meeting, organized personnel to implement the issues raised by the supervisor within two days, and cleaned up the building materials and scaffolding equipment on the completed structural layer and construction surface. , template materials, etc. The existing structural stairs were cleaned up in a timely manner and safety passages were set up to ensure safe passage of personnel.
③. There are many people working in violation of regulations. Due to the accelerated construction progress this month, the subcontracting unit organized a large number of people to enter the site to support the construction of this project. Because the erection of the racks was unqualified and there were no guardrails. , causing construction workers to have nowhere to hang their safety belts, so there are many construction workers who do not wear safety belts during the construction process. In addition, the springboards are unqualified and the edge protection is not in place. The dangers are everywhere. During this period, construction, After many safety inspections of the construction site, the supervision unit found that the oral notice was not effective. On August 11, 20xx, the supervision unit promptly issued Supervision Notice No. 011 requiring the safety production management personnel of the general contracting unit to immediately inspect the construction site. After receiving the attention of safety management personnel at all levels from the general contracting unit and providing safety education to construction workers, the overall safety belt fastening has been greatly improved.
④ Strengthen the management and inspection of the formwork support system. Since the elevation of the first floor structure is 5000mm and the size of the bowl buckle frame is not high enough, the construction unit uses the adjustable screw part of the U-shaped jacking bracket to align it. , causing only the adjustable part of the jacking support with a total length of 600mm to be exposed by 500mm, which is far from the 150mm exposed in the regulations. In order to prevent collapse accidents, the supervisor issued two work contact sheets in succession, requiring the general contractor to take effective measures Measures should be taken to rectify or reinforce the unqualified parts.
2. The activities to create a civilized urban area and the timely inspection of site safety by construction committee safety managers have brought about a turn for the better on site safety production
1. On August 19, 20xx, the construction unit , the supervision unit, and the construction unit respectively sent people to the Beijing Convention Center to participate in the "Chaoyang District Construction System to Create a National Civilized Urban Work Conference", requiring all construction sites to strengthen civilized construction and green construction and living area management at the construction site. The meeting required Construction units, supervision units, and construction units cooperate with the Chaoyang District Construction Committee to strengthen inspections of civilized construction, green construction, and living areas at the construction site, and promptly report problems or phenomena that violate green construction during construction to the Construction Committee.
2. Office safety engineer Wang Junguo came to the construction site in the rain at 5:20 pm on August 21, 20xx to inspect the construction site and the steel processing area. Inspection records were signed for issues such as connecting wires, using small fans, permit for waste disposal at the construction site, workers working at heights not wearing safety belts, and the lack of guardrails at the square brackets where the pillars and steel bars are bound and framed, and requested to stop work for rectification.
Through this "Chaoyang District Construction System to Create National Civilized Urban Work Conference" meeting and Xiaoguan Safety Engineer Comrade Wang Junguo's regular inspections and inspections of the construction site, we discussed the importance of doing a good job in safety production , patiently explaining and effectively supervising and rectifying the safety management personnel of the construction unit. With the attention of leaders at all levels of the general contracting unit and the full cooperation of the subcontracting units, on the evening of August 23, 20xx, all employees worked hard to make comprehensive rectifications overnight. This has brought about earth-shaking changes to the entire construction site, eliminating many civilized construction, green construction and on-site problems and safety hazards. It is hoped that the general contractor will cherish the results of this rectification, continue to respond to the spirit of the superiors’ instructions on creating a civilized urban area, implement green construction and civilized construction work on the construction site, and make due efforts to create a civilized urban area.
3. There are problems on site that need to be solved in time
The issue that needs to be solved urgently this month is the acceptance of the formwork support system. The general contractor did not conduct its own internal acceptance inspection after the construction of the formwork support system was completed. During the supervision and inspection process, it was discovered that the buckle rack vertical poles and the horizontal connections were not tightly buckled, or even partially connected, and the support system lacked scissor support. , construction is not carried out according to the plan that has been verified by experts, resulting in safety hazards in the support system. This issue has been solemnly raised at the last regular supervision meeting this month, requiring the general contractor to strengthen the presence of every detail of the construction process. Conduct investigation of hidden dangers and inspection and acceptance before concrete pouring to ensure the integrity, firmness, stability and safety of the system.
4. Continue to strengthen communication and coordination to ensure smooth construction
In the process of safety production management, communication and coordination between various units are always inseparable. Only when the communication channels are smooth will The coordination work will be easier. Every work done at this construction site from the beginning to the present is carried out in accordance with the communication and coordination mode, whether it is with the construction unit, general contractor unit, subcontracting unit or with the superior management department Among the leaders, many problems that arise on the construction site are solved through communication and negotiation. Therefore, coordination and communication are very important in safety management and other aspects of on-site management. Article 2: Summary of production safety in August
Since the province and city deployed the work of creating safety, our district has attached great importance to it and actively deployed it. While promoting special actions in a rapid and orderly manner, it has closely combined with the actual work and accelerated Intense publicity efforts have created a good publicity atmosphere, and the publicity work for the establishment of Ping An is impressive.
1. Leaders attach great importance to and organize carefully
In order to ensure that the publicity work is carried out in an all-round way, the district’s leading group for creating a safe Luohu attaches great importance to it and immediately requires the district’s safety office to set up a publicity responsibility group and allocate a special project Propaganda work funds, timely printing of diversified brochures and promotional materials to ensure the smooth implementation of publicity activities; the district safety office immediately organized and held publicity work coordination meetings to convey the provincial and municipal safety office publicity work requirements and require all member units Attaching great importance to it, designated a dedicated person to take charge, formulated a work plan, implemented the reporting reward mechanism and specific publicity measures, etc., and timely formulated and issued the "XX District? Peace Construction into the Community? Series of Publicity Activities Plan" and other documents to further clarify the key points of publicity for the establishment of peace, Division of responsibilities and job requirements. Mobilization meetings for safe creation were held at the street and community levels to fully mobilize the enthusiasm of cadres at all levels to participate, continue to strengthen their understanding of the work of safe creation ideologically, attach great importance to the publicity work of safe creation, and the heads of each unit personally intervened and took charge, forming a Powerful publicity synergy.
2. Diverse forms, comprehensive coverage
In order to effectively improve the general public’s awareness and participation rate in the establishment of safety, our district closely integrates reality, continuously broadens publicity channels, and organizes publicity in the streets. , carry out a new round of safety promotion activities in the community, into the community, into the campus, into the enterprise and other activities. At the same time, combined with theme promotions, such as: "Safety Building into the Community" summer safety education for teenagers, "Safety Building into the Community" anti-terrorism knowledge lectures, etc. During the event, Q&A sessions with prizes for Ping An Creation were designed to mobilize the enthusiasm of the masses. Use newspapers, radio, television, the Internet and other media to conduct three-dimensional publicity. Hang banners on main roads, administrative service halls, intersections, etc. in the jurisdiction; broadcast promotional slogans on pillar billboards and LED displays in shopping malls; set up special promotion columns on the Luohu Home website to publish work updates in a timely manner; use LED lights at bus stops in the jurisdiction The display screens and billboards will broadcast promotional slogans on a rolling basis; publicity columns will be opened in various community bulletin boards, functional department bulletin boards, markets, shopping malls, stations and other places with concentrated traffic, and promotional posters and banners will be posted; fully integrated with ?3.15? During important periods such as Consumer Rights Day, June 26 Anti-Drug Publicity and November 14 National Construction Publicity Week, we vigorously promote publicity into communities, companies, schools, families, etc., and promote safe creation-related content, striving to mobilize all employees, Fully launched and became a household name. Since the beginning of this year, our district has published 10 articles in municipal media, hung more than 160 slogans and banners, posted more than 10,000 posters, set up 77 billboards, set up 40 LED screens, set up 83 publicity boards, and distributed 25.4 brochures. Wanben organized more than 80 on-site publicity activities of various types, and cooperated with social organizations such as the XX City Wenxin Social Work Service Center and 37 community service centers in the jurisdiction to participate in publicity activities. The activity recruited 1,063 community safety volunteers.
3. Mechanism first to ensure effectiveness
Our district has initially established and improved the joint meeting mechanism for safety creation and publicity work, the supervision and inspection mechanism and the timely information delivery mechanism. Joint meetings on Ping An creation and publicity work are held from time to time to keep abreast of the progress of the publicity work and coordinate to resolve difficulties and problems encountered in the publicity work; a supervision group has been established to focus on supervising the arrangements and deployment of publicity work of each member unit and the production of publicity materials this year. situation, the combination of publicity and actual work, etc., to ensure timely understanding of work progress. We have organized and carried out inspection activities for the creation of peace in the lower sub-district offices and communities. We checked whether the community bulletin board has posted posters promoting the creation of peace, whether the slogans of creation of peace are broadcast on a rolling basis at each transportation platform, and whether the promotion of creation of peace is hung at each bus station. Banners, etc., the supervision team will report the inspection status in a timely manner, comment and encourage at the joint meeting, and promote the formation of a strong working atmosphere in which everyone is chasing after each other; design a special report on Ping An Luohu work, and issue a notice requiring all member units to submit it on time every month. Summarize experiences in submitted materials, discover highlights, set examples, and promote them.
IV. Next work plan
In the next step, with the help and guidance of the higher-level political, legal and comprehensive management departments, our district will focus on the work ideas and overall deployment of creating a safe Shenzhen , further strengthen the promotion of peace creation, make every effort to build the "Ten Major Systems" of peace construction, strive to build a safe Luohu, a happy Luohu, and strive to build a happy new city with healthy economic development, rule of law, fairness and justice, people living and working in peace and contentment, and social harmony and stability.
Part 3: Summary of production safety in August
1. Adhere to the policy of safety first and prevention first, and fully realize the goals and tasks of production safety month
Safety first, prevention first Safety is the basic policy of construction. In order to conscientiously implement this policy, the project department has established a safety production leadership organization, clarified work responsibilities, established a safety production leadership group, with the project manager as the team leader, and also established a civilized construction leadership The team is also headed by the project manager, which establishes the project manager’s position as the first person responsible for safe production and civilized construction. The project department not only created a safe working condition for employees, but also worked hard to improve the working and living environment and sanitary conditions at the construction site, gradually improved and improved the safety education and training mechanism, and integrated the concepts of people-oriented and safe development into production activities. , stimulated the sense of honor and responsibility of the majority of employees, and further mobilized the enthusiasm, initiative and creativity of employees.
2. Facing the production front line, highlighting the key points, carefully preparing the construction organization design, and implementing various safety technical measures
Facing the production line, highlighting the key points, and carefully preparing the construction organization design: Construction organization Safety technical measures in design are the principles we should abide by to ensure safe construction. We prepare activity plans, formulate systems, and strictly follow the systems to ensure that all employees are 100% involved in the activities and that every employee Cadres and employees all participate in a safety activity and receive safety education. All management personnel closely focus on key contents such as hidden danger management, safety publicity and training, and emergency drills, and organize and carry out production safety, fire safety, flood control safety, safety of crowded places, special equipment safety, building construction safety, underground space safety, etc. Only with various contents and forms of safety activities can we prevent the occurrence of various accidents and achieve the pre-control goal of safe and civilized construction. In order to ensure safe and civilized production and construction, we have formulated the following safety production technical measures:
1. Conduct three-level safety education for workers entering the site, and strengthen special safety production technical explanations for the construction process.
2. The electricity used in construction strictly follows the requirements of the three-phase five-wire system, using cables to lay along the wall, using yellow and green double-color wires for grounding wires, and achieving three-level power distribution, two-level protection and one-level protection. The machine has one box, one gate and one leakage protection.
3. Provide handrails on the stairs at the construction site and hang safety nets in unsafe working locations.
4. Set up obvious fire prevention signs in key fire prevention areas such as power distribution rooms, carpentry sheds, etc., and equip them with fire extinguishers.
5. Standardize the operation of mechanical equipment, and perform correct maintenance on all mechanical equipment so that their safety and technical conditions are always in good condition, the performance of protective devices is intact, the operating methods and procedures are correct, and management is implemented Two guarantees and three guarantees (fixed personnel, fixed equipment, guaranteed use, guaranteed management, and guaranteed maintenance).
6. When building facilities, they must be inspected and accepted before they can be put into use. During use, you should be very accurate and not accurate.
7. There are 3 full-time safety officers at the construction site. Each team leader is a part-time safety officer and is responsible for daily supervision and inspection of the construction site.
3. Take the Safety Production Month activity as an opportunity to establish and improve various rules and regulations and comprehensively promote safety production management actions
We take the Safety Production Month activity as an opportunity to strictly follow the national and Beijing's requirements for promoting the three actions of production safety, establishing sound rules and regulations, and comprehensively and deeply carrying out safety production governance actions. Since the establishment of the project department, it has begun to establish and improve various rules and regulations. The project management department has The organization has established work responsibilities, and each department has made corresponding work flow charts, such as safety production flow charts. The project department has established a safety guarantee system. Based on the relevant regulations of Beijing City, based on the characteristics of the project and the company's relevant regulations, the project department has formulated in-depth and detailed "Safety Production Management Measures", "Temporary Power Use Management System", A series of systems and standards include "Civilized Construction Management Standards", "Civilized Construction Inspection System", "Safety Production Inspection Standards", "Safety Production Education System", "Casualty Accident Reporting System", "Safety Rewards and Punishment Regulations". These standards and systems strive to be detailed, specific, and operable, from responsibilities and authorities to implementation processes.
By formulating the specific contents and requirements of various standards and systems from a high starting point, we organize all employees to learn and implement them. The improvement of the above systems has made all the work of the project department follow rules, standardized management, clear responsibilities and powers, and improved the work performance of employees.
4. Strengthen the education and training of production safety for employees and strive to improve the awareness of safe and civilized construction
The education and training of production safety is an important basic work to achieve production safety. In accordance with the policy of safety first and prevention first, we have carried out various forms of publicity and education, so as to make unremitting efforts and keep the alarm bell ringing. In order to further consolidate and deepen the safety month activities, we timely summarize and promote safety production education, and gradually improve and improve the safety training mechanism. First, new employees must participate in three-level safety education and take a written examination. Only those who pass the examination are allowed to work. The second is: pay close attention to on-site safety publicity and education. While we use publicity boards and slogans to do safety work, we also set up standard warning signs. The third is: Strengthen professional and technical training and comprehensively improve the technical quality of employees. Enhance employees' safety awareness, lay a good foundation for achieving safe production, achieve results in the Safety Production Month activities, create a safe and stable social environment, and celebrate the 60th anniversary of the founding of New China.
5. Strict safety inspection, promote safety culture, and serve scientific development
Since the launch of safety production month activities, we have implemented planned, scientific and reasonable measures on limited construction sites The layout ensures that materials arrive accurately, timely, and are stacked in an orderly manner, reducing backlogs and secondary handling, and ensuring smooth road transportation and fire escapes.
During construction, safety work must be carried out to ensure five "no constructions". That means no construction without safety, technology, and quality assurance measures; no construction if safety conditions are not met; no construction if protective measures are not fully configured; no construction without safety education and technical briefing; no construction of the next process if the previous process is unqualified. It effectively controls the unsafe behaviors of people and the unsafe status of objects, forming a safety management model that controls all employees, all aspects, processes and procedures. According to the provisions of the "Technical Specifications for Safety in Construction", combined with the progress of construction and the setting up of each type of work, prepare safety technical briefings for sub-projects at each stage, safety technical briefings for small and medium-sized machines and tools, and safety technical briefings for general and special types of work. Technical briefing; prepared corresponding safety plans for some key processes. It ensures the implementability of safety measures, refines safety work standards into all aspects of construction and production, and achieves the best safety state with standardized behaviors. Use safety standards to inspect and accept various safety facilities. In terms of construction safety, we adhere to the combination of self-inspection, mutual inspection, and handover inspection. For those facilities that do not follow the standards or fail to meet the standards, we will immediately stop the work for rectification until the acceptance is passed. Work will be resumed later. Relevant violations and safety hazards detected on-site will be punished in accordance with the "Rewards and Punishments for Work Safety", which will fundamentally prevent the occurrence of various work-related injuries such as illegal command and illegal operations, and nip various safety hazards in the bud. , and effectively solved the weak links and outstanding problems in production safety.
6. Strengthen patrol inspections and promptly rectify and report safety records
During the event, we conduct weekly safety production inspections and issue rectification notices in a timely manner for the problems detected We will continue to invest in ensuring safe production, conduct 24-hour uninterrupted monitoring of major hazard sources, and report weekly safety inspection records to the resident supervisor in a timely manner for the management of the supervisory unit. At the end of each month, we are led by the deputy project manager to conduct thorough safety production and civilized construction inspections at each construction site, and gradually establish a long-term mechanism for safety production. Through activities, our unit effectively solves the main problems existing in safety production, It has ensured that various safety hazard factors have been significantly reduced, and safety hazards have been effectively managed and controlled. ;
- Related articles
- Clean up the slogan of littering in the jurisdiction
- The plot of "Special Police Corps" is based on the week in the case.
- Is Xinzhou epidemic situation open?
- How to do brand marketing well?
- Translation of Chinese Slogans of China Tourists
- How to write a promotional slogan for garbage classification?
- A brief history of changchai co., ltd.
- Army physical training slogan banner
- Ten gods, eight characters and four pillars for free fortune telling "four pillars and eight characters", ten gods will die.
- Please help me think of some real estate banners.