Joke Collection Website - Blessing messages - Description of on-site reconstruction monitoring and power failure report of distribution center

Description of on-site reconstruction monitoring and power failure report of distribution center

Informed by the superior: from 7: 00 am to 65438+ 8: 00 pm tomorrow, our unit will be cut off. The management personnel of the central computer room are required to shut down all system-related equipment in the central computer room in advance and restart all system-related equipment after power supply is restored. In order to avoid the situation that the computer room managers do not arrange the time and operation process reasonably in this emergency, they are in a hurry to operate each system, and even the system cannot be used after the power supply is restored. In this case, the following suggestions are made: 1. Shut down all systems and equipment before power failure. Shut down all systems and equipment in the central computer room 30 minutes before the predicted power outage time: (1) Shut down all server hosts in the central computer room (2) Shut down the network equipment in the central computer room (3) Shut down the UPS in the central computer room and turn off the external power switch of UPS. 2. Start all systems and equipment after the call. Turn on all systems and equipment in the central computer room: (1) Turn on two groups of servers in the central computer room respectively, in which CarManage 1 server is turned on first, and then CarManage server is turned on after CarManage 1 server is started normally; In the SHSERVER group server, start SHSERVER 1 first, and then start SHSERVER2(2 after it is started normally. (2) Turn on each network device in the central computer room: one for the core, one for routing and one for access in the No.2 cabinet; One core and two units in No.3 cabinet are connected; (3) Finally, turn on the external power supply of UPS, turn on the UPS power supply and modulate UPS online standby (non-bypass). 3. Start the central software system program (1). After the server and the central network equipment are started normally, the central transmission and bank transmission applications are started on 1 and No.2 (main and standby machines) respectively, and the FTP client program of bank transmission is started, and the TOMCAT service related to the central WEB query is started on the host. (2) Open the company system file sharing server in the computer room on the second floor of East Station and the print server computer in the small cabinet on the second floor of East Station.