Joke Collection Website - Blessing messages - Construction and Configuration of Huawei Cloud Server

Construction and Configuration of Huawei Cloud Server

Precautions for Huawei server installation:

1. Before removing and installing the 2288 V5 server, you must wear an antistatic wrist strap or gloves to avoid damaging the electrostatic sensitive equipment on the 2288 V5.

2. When installing 2288 V5, at least two people shall carry it, place it horizontally, put it on the slideway and push it into the cabinet.

Huawei 2288 V5 server installation steps:

1. Install the server.

(1) Wear an antistatic wrist strap or gloves.

(2) Put 2288 V5 on the slideway and push it into the cabinet.

(3) When connecting the lugs at both ends of 2288 V5 to the square holes of the cabinet, tighten the loose screws on the lugs to fix 2288.

V5 .

2. Connect the business network port and the management network port.

3. Connect the power cable.

The current specifications of the external power air switch connected to the server are suggested as follows:

AC power supply: 32A

DC power supply: 63A