Joke Collection Website - Blessing messages - What materials are included in the whole set of decoration?

What materials are included in the whole set of decoration?

1. Basic decoration part of all-inclusive decoration (including auxiliary materials and labor required for decoration)

(1) indoor wall renovation: mainly including the demolition of old walls, wall building, trunking and underwater pipeline isomeric construction, etc. Negotiated by the owner.

(2) It is also necessary to provide water pipes (hot and cold water pipes), electric wires (strong electricity and weak electricity), tracheal materials and installation and laying works for families.

(3) The toilet needs to be laid with drainage pipes, backfilled with light materials and leveled.

(4) Waterproof treatment of kitchen, bathroom, balcony wall (not less than 1.8m) and ground.

(5) each room ground leveling processing

(6) The living room has 623*623 antique floor tiles and the viewing balcony has 300*300 floor tiles.

(7) Toilet, kitchen, life balcony floor tile and wall tile paving.

(8) The base and top surface of the wall shall be putty, and the surface shall be painted with latex paint.

(9) Bathroom sanitary ware and hardware installation

(10) Lighting installation in all rooms

2. Decorate the modeling part of the whole bag (including all auxiliary materials and labor)

(1) TV wall modeling, living room, dining room, master bedroom, master bedroom porch, cloakroom ceiling;

(2) Wooden parts: mainly including shoe cabinets or TV cabinets, kitchen cabinets, etc. If you buy it yourself, you can omit it.

What should I pay attention to in the whole package decoration?

1. Does the decoration all-inclusive company have a construction management department to supervise the construction quality and progress?

2. Investigate the projects built by the company: whether the design is reasonable and whether the construction quality meets the requirements.

3. The supervisor will supervise the decoration project, and will definitely report the situation of the project site to the owner by telephone, text message and email. , and provide some suggestions. Owners need to pay attention to leaving these reports in writing to avoid future disputes.

4. Payment method: make reasonable payment according to working procedures and write it into the contract. After each step of work is completed and the materials and process standards are accepted, the project payment will be paid. If the terms of the contract are less than half of the renovation, most of the project funds have been paid, so choose carefully.