Report on work resumption after the Spring Festival
The following is a sample report on resumption of work after the Spring Festival. You are welcome to read it.
Report on resumption of work after the Spring Festival
Sample article 1
In order to further strengthen and improve the safety work of the Nanqin Garden Community Project Department and effectively protect the safety of the lives and property of the employees , to ensure the normal construction order of the project, and based on the actual situation of the project department, the safety work of the construction site was carefully and meticulously inspected before the start of construction, and hidden danger inspection and management activities were carried out on the construction site. The self-inspection and rectification situation is summarized as follows:
1. On-site construction safety conditions
1. Safety education for workers before the start of construction and inspection of on-site openings and edge protection
Safety education for on-site workers before the start of construction , improve workers’ awareness of safe construction after the holiday, so that one person entering the site can educate one person. The openings and edge protection at the construction site have been rectified and repaired in place.
2. Temporary power consumption:
Temporary power equipment should be provided at the construction site: one machine, one box, one gate, one leakage, and one grounding to ensure the safety of electricity use. ; Warning signs are installed on power supply equipment, primary and secondary distribution boxes are neatly rectified, and protective accessories are in place; the metal distribution box shell protects the neutral line, the leakage protection device is intact, and the distribution box is clearly marked.
3. Construction machinery
Before construction, check the steel machinery and circular saws to ensure that their protective terminals and protective devices are reliable and effective; the protective terminals of electric welding machines and no-load voltage reduction protectors are safe and reliable; The protective devices for submersible pumps and handheld power tools are sensitive and effective.
4. Group tower operations
Before the start of construction, the tower crane installation unit is required to conduct special maintenance inspections on all tower cranes 1# to 11# at the construction site for resumption of work after the Spring Festival, so as to ensure that the structure and The working mechanism and parts are all normal and reliable. All safety devices and all indicating instruments are complete and intact; the oil levels of each tower crane gearbox and hydraulic oil tank meet the regulations; the connecting bolts of the main parts are not loose, the wear of the wire rope and the threading of each pulley comply with the regulations; the power supply cable is not damaged, and the limit device is in place , fully functional. The safety warning signs of each tower crane are eye-catching and the group tower operation management system is in place. After passing the inspection by the project department, it will be submitted to the project supervision unit for acceptance.
5. Formwork support construction
The formwork support erection is strictly in accordance with the "Safety Technical Specifications for Fastener Steel Pipe Scaffolding in Construction" JGJ130-2011. The fasteners used on the frame are all It is qualified and has no damage, and the steel pipes used have no cracks or twists; all bolts and nuts are fastened in place, the foundation is stable, and there is no settlement; the scaffolding boards on the working floor are in good condition, the joint boards are tightly sealed according to the specifications, protection is in place, and warning and safety signs are in place.
6. Fire management
(1) The power distribution facilities, mechanical vehicles, warehouses and other parts of the construction area are equipped with fire-extinguishing equipment and fire-fighting facilities, and the fire extinguishers work normally and have good performance. The warehouse is classified and stored, and the electrical appliances in the warehouse are operating normally, and there are no random connections of wires and electrical appliances.
(2) The electrical circuits and sockets for temporary lighting in living areas, office areas, and canteens have been re-inspected and tested and all work normally without abnormality.
7. Safety protection facilities
Protective facilities and obvious signs have been set up at cave entrances and dangerous locations; safety fences have been set up near edges and empty surfaces; small equipment has been installed on site Protective devices such as protective covers are installed, and fire-fighting facilities are installed near electrical parts and flammable and explosive materials.
2. Problems during the inspection
1. The layout of construction power lines is chaotic, and individual line layouts do not meet regulations and need to be further improved.
2. The equipment is regularly inspected and various systems are improved; however, the inspection data records of the equipment themselves are incomplete; further improvement is needed.
3. Some safety protection facilities have not kept up with the construction progress due to cross-operation, resulting in safety protection lagging during construction; management needs to be strengthened.
3. Rectification measures taken
In order to ensure the safety of the construction just now and eliminate various safety hazards, the project department proposed the following rectification measures for the main problems existing during the self-inspection process:
1. We will continue to pay attention to the issue of electricity consumption in construction, strictly investigate the illegal use of electricity in employee dormitories, and conduct unified and standardized layout of on-site wiring.
2. Improve and improve systems at all levels so that comprehensive safety management work can be followed and implemented in place, and the responsibilities of all levels and departments are strictly implemented in accordance with the safety production responsibility system.
3. Strengthen the management of various protective facilities and ensure that various protective facilities are synchronized with the construction progress.
In short, some shortcomings and omissions were discovered through this major inspection, and the project department made rectifications in a timely manner to effectively control them and ensure a safe resumption of work after the holidays; but safety work is a long-term At work, the project department will continue to pay close attention to safety, pay close attention to safety, and consolidate the basic work of safety management, so that the safety awareness of the majority of employees can be improved, so that various tasks and requirements of safety management can be better implemented; further enhance their awareness of safety responsibility, Clarify their respective responsibilities and provide safety guarantee for the smooth progress of project construction.
Sample 2
Due to the suspension of construction of this project during the Spring Festival, now that the Spring Festival has passed and the temperature has risen, all project department management personnel have arrived at work, and the construction team members of the project have basically been in place. . The conditions for resumption of work are now as follows:
1. On-site management personnel and employees are in place
There are ***10 project managers in this project, as of February 20, 2014 , all project department managers have arrived.
2. Safety education and system inspections
After inspection, the safety inspection system has been established and all safety ledgers have been collected. All emergency plans are complete, all operating procedures are in good condition, and inspection records of all mechanical equipment, temporary electricity, and fire-fighting equipment are complete. All special operations personnel involved in each process and mechanical operation must hold certificates and undergo inspections in accordance with regulations.
Our project department has conducted safety education and safety technical briefing for employees on resumption of work after the Spring Festival on March 1, and signed a safety responsibility letter with each team leader. The statistical work of new special operations personnel after the holiday has basically been completed, and the application process for special operations personnel is in progress.
3. Safety production situation
The project department inspected the safety production on site and in the office, and the situation was good. Project/fanwen/1601/The project department re-erected some temporary power lines that were dismantled before the Spring Festival, inspected the third-level distribution box and the second-level leakage protection switch, and dismantled some of the random connections. The electricity has basically complied with the specification requirements. The opening and edge protection are in place. Scaffolding has been erected as construction progresses.
4. On-site civilized construction conditions
The project department established a civilized construction team to be responsible for on-site enclosure, daily cleaning, and repair and replacement of damaged enclosures.
5. Operation status of construction machinery and equipment
At present, all mechanical equipment at the construction site has been debugged and passed the test. .
After inspection and rectification, our project department has made preparations for resuming work after the Spring Festival, has met the conditions for resumption, and plans to start work on March 6, 2014.
Sample Essay 3
p>To: xxx Co., Ltd.
Our project department plans to resume work on the 14th building in West Lake Spring City constructed by our company on February 10, 2012. Before resuming work, our project department has conducted a comprehensive inspection on the protection of tower cranes, construction electricity, construction machinery, scaffolding, and edge openings, and assigned dedicated personnel to take charge. Before resuming work, workers have been trained on production safety, and new workers have been given three-level safety production education (see corresponding photos for details). The project department has a complete organizational structure and personnel, including special operations personnel. And work with a certificate.
I am now applying for inspection of my construction site and requesting resumption of work.
Sample Essay 4
According to the spirit of Wuchengjian [2013] No. 32 document, our construction unit conducted a comprehensive safety self-inspection on the construction site, and conducted a comprehensive safety self-examination on the construction site. The existing safety hazards and defects have been comprehensively summarized and rectified. The contents are as follows:
1. On-site construction safety conditions
1. Safety education for workers before the start of construction and site openings and temporary inspections Border protection inspection:
Conduct safety education for on-site workers before the start of construction, improve workers’ awareness of safe construction after the holidays, and ensure that every person entering the site educates one person. The openings and edge protection at the construction site have been rectified and repaired in place.
2. Safe use of electricity:
At the construction site, the electrical equipment should be equipped with one machine, one gate and one leakage to ensure the safety of electricity use; warning signs should be installed on the power supply equipment. The primary and secondary distribution boxes are neatly in place and the protective accessories are in place; the metal distribution box shell protects the neutral line and the leakage protection device is intact. The distribution box is clearly marked and the distribution line direction is clear.
3. Safety measures for working at heights:
(1) Safety regulations and measures for working at heights are complete.
(2) There are complete warning signs for working at heights.
4. Special equipment:
There is no deformation of the structure of the construction elevator, no loosening of the connecting bolts, no abnormal wear of the wire ropes and pulleys, all the wire ropes are well fixed, and there are no obstacles within the operating range.
5. Scaffolding construction:
The scaffolding is erected in strict accordance with the "Safety Code for Construction of Steel Pipe Scaffolding in Construction". The fasteners used on the frame are all qualified and without damage, and the steel pipes used are free of damage. There are no cracks or distortions; all bolts and nuts are fastened in place, the foundation is stable, and there is no settlement; the scaffolding boards on the working floor are in good condition, the joint boards are tightly sealed in accordance with the specifications, protection is in place, and warning and safety signs are in place.
6. Fire management:
(1) Fire extinguishing equipment and fire-fighting facilities are equipped in construction areas and other power distribution facilities, mechanical vehicles, warehouses, etc., and fire extinguishers work normally and have good performance . The warehouse is classified and stored, and the electrical appliances in the warehouse are operating normally, and there are no random connections of wires and electrical appliances.
(2) Comprehensive safety regulations for the storage of oxygen acetylene
(3) Electrical circuits and sockets for temporary lighting in living areas, office areas, and canteens have been re-inspected , the tests all work normally without abnormality.
(4) There are no flammable or explosive materials around the welding shed at the construction site.
7. Safety protection facilities:
Protective facilities and obvious signs have been set up at the entrance and dangerous locations; safety guardrails have been set up near edges and empty surfaces, and stairs have been set up. Handrails and protective railings; protective covers and other protective devices are installed on small equipment on site, and fire-fighting facilities are installed near electrical parts and flammable and explosive materials.
2. Problems during the inspection
1. The layout of construction power lines is chaotic, and the layout of individual lines does not comply with regulations and needs further improvement.
2. The equipment is regularly inspected and various systems are improved; however, the equipment’s own inspection data records are incomplete; further improvement is needed.
3. Some safety protection facilities have not kept up with the construction progress due to cross-cutting operations, resulting in safety protection lagging during construction; management needs to be strengthened.
3. Rectification measures taken
In order to ensure the safety of the resumption of construction and eliminate various safety hazards, the project department proposed the following rectification measures for the main problems existing during the self-inspection process:
1. We will continue to pay attention to the issue of electricity consumption in construction, strictly investigate the illegal use of electricity in employee dormitories, and conduct unified and standardized layout of on-site wiring.
2. Improve and improve the systems at all levels so that comprehensive safety management work can be followed and implemented in place, and the responsibilities of all levels and departments are strictly implemented in accordance with the safety production responsibility system.
3. Strengthen the management of various protective facilities and ensure that various protective facilities are synchronized with the construction progress.
IV. Management of construction hoisting machinery
1. Standardize the company’s internal construction hoisting machinery management system. When purchasing and leasing equipment, you must choose a cooperative unit with strong strength.
2. The installation, disassembly, use, daily repair and maintenance of machinery shall be carried out in accordance with the requirements of the relevant building construction safety management system, and written records shall be formed of use, daily repair and maintenance.
3. Special operations personnel must hold a certificate to work. Those without a certificate are strictly prohibited from working.
4. Various machinery should be operated in strict accordance with the instructions and relevant specifications. Equipment that has exceeded its service life should be re-accepted and the relevant usage procedures can be certified.
5. Special action plan to eliminate fire hazards and ensure safety in winter and spring
1. The project department organizes voluntary fire brigade, conducts extensive fire protection publicity and training, conducts regular fire emergency drills, and fully cooperates Be prepared for fire fighting and emergency rescue.
2. Establish a fire safety system at the construction site, establish a fire safety leadership group, implement fire safety responsibilities at all levels, establish various fire safety management systems and strictly implement them, and equip with corresponding emergency resources.
3. The construction site shall configure required fire-fighting facilities and equipment in accordance with relevant regulations, draw fire-fighting floor plans, keep fire-fighting passages set up and unobstructed, and establish fire-fighting water supply systems and ensure that they are in good condition.
4. Workers who perform electric welding, gas welding, electrical work and other work at the construction site must hold certificates to ensure that managers and workers master fire-fighting skills
5. Use open flames at the construction site to carry out fire fighting Approval procedures, electricity and fire usage of temporary buildings on the construction site must comply with relevant production safety requirements.
6. Implement fire management responsibilities in temporary office buildings, dormitories, canteens, warehouses, carpentry rooms and other places, strictly control the power consumption and use of high-power electrical appliances, and strictly prohibit illegal use of electricity.
Construction unit:
Supervision unit:
Construction unit:
- Previous article:Love words to express love on Double 12
- Next article:What should I do if I suddenly lose weight? Is the god of knowledge flustered?
- Related articles
- Children's Hundred Days Banquet WeChat Invitation
- I wish my sisters happiness.
The first 1, white clouds fall into the world and become drizzle; Meteorites fall into the world and become meteors; Sunlight falls into the world and becomes a rain
- China Postal Insurance Office of Postal Bank gave an insurance policy. Is it okay if there is no red seal on the contract?
- The mobile phone can't receive the news of the school newsletter, but others can. What is the reason?
- How to delete the information of the previous owner of a mobile phone card?
- A mentally ill relative keeps making harassing phone calls
- Solution combination of spam flooding
- How many text messages can I send at most a day?
- Cai Kangyong's Classic Quotations
- Can I recharge my mobile phone by texting?