Joke Collection Website - Blessing messages - Flood prevention notice during rainy season

Flood prevention notice during rainy season

Flood prevention notices in the rainy season (5 general articles)

As society develops step by step, we often have to use notices. Notices are issued by agencies to internal units or parallel institutions. , a document issued to negotiate or inform matters. I believe that writing notices is a headache for many people. The following are the flood prevention notices for the rainy season that I have compiled (5 general articles). They are for reference only. I hope it can help everyone.

Flood prevention notice in the rainy season 1

All road maintenance teams:

Our county is about to enter the flood season. In order to conscientiously implement the Yi Road Maintenance Zi [20xx] No. 4 In the spirit of the notice, we will do a good job in highway maintenance and highway flood prevention work in the rainy season in 20xx. The relevant matters are hereby notified as follows:

1. Raise awareness, make various preparations for highway flood prevention work, and pay timely attention to meteorology and hydrology Departmental analysis and forecasting.

2. All road maintenance teams should attach great importance to highway maintenance and highway flood prevention in the rainy season, actively take effective measures, and pay close attention to their implementation. The Bureau has established a leading group for highway maintenance and flood prevention in the rainy season (the member list is attached). The office of the Flood Control Leading Group is located in the Bureau Maintenance Company.

3. Further implement the responsibility system for road maintenance and highway flood control during the rainy season. Implement the responsibility system for road maintenance during the rainy season and road flood control and traffic protection to the unit offices, road maintenance teams or individuals at all levels. Main lines of the branch such as Qianda Line, Wanhuang Line, Fengdai Line, and Sitang Line, as well as tourist routes, county exits and other roads with great social impact, must strictly enforce flood control and flood protection work disciplines, and be responsible for those who do not fulfill their responsibilities and delay work. Those who cause serious consequences must be held accountable.

4. Strengthen the prevention and emergency repair of highway water damage, organize personnel to inspect road sections prone to water damage and accidents over the years, and deal with hidden dangers in a timely manner, especially taking effective measures to deal with dangerous bridges and culverts and soft and sinking road sections. Preventive measures include reinforcement and repair, speeding up highway maintenance and preparing materials, promptly repairing road potholes and clearing debris on bridge and culvert structures. Insist on patrolling roads on rainy days. If water damage occurs and the road is interrupted, personnel should be immediately organized to carry out emergency repairs. Flooded road sections should be cleared after the water recedes.

5. Strengthen the maintenance and management of construction sections. Maintenance responsibilities must be clearly defined on construction sections. In accordance with the principle of ensuring both construction and traffic, full-time maintenance personnel and traffic conductors should be deployed to ensure normal traffic on construction sections.

6. Rely on governments at all levels to carry out emergency repairs of highways damaged by water. If water damage occurs, you must promptly report to the local government and obtain support and help. At the same time, during the flood season, you must obey the unified command and dispatch of the local flood control command department, organize manpower and material resources, actively participate in flood fighting and rescue, and be responsible for transportation flood prevention and disaster relief. The routes along which epidemic prevention materials and personnel pass must be ensured to be smooth and given priority.

7. Establish a day and night duty and reporting system during the flood season. In order to fully grasp and understand flood conditions, emergency repairs of flood damage and meteorological conditions in a timely manner, each road maintenance team reports on the conditions of the roads under their jurisdiction during the flood season once every ten days (4th, 14th and 24th), and reports on serious flood damage, emergency repairs and traffic obstructions The outage situation must be reported promptly within one hour, and each road maintenance team is on duty day and night during the flood season. Comrade Song Lei of the branch liaised with and dispatched emergency repair work for flood damage and flood prevention. Each road maintenance team must designate a dedicated person to be responsible for flood damage prevention duty work, and report the duty location, phone number and contact person to the branch office for timely contact.

8. After receiving this notice, each road maintenance team should establish a team headquarters flood damage emergency support team to achieve unified deployment and complete responsibilities. Make careful arrangements for road maintenance and flood prevention work in the rainy season.

9. The branch will organize a special inspection and evaluation of road maintenance work during this year’s rainy season, and the results will be included in the year-end assessment. Flood Prevention Notice 2 in the Rainy Season

All construction, supervision and construction units:

According to the spirit of the "City 20xx Flood Season Safety Production Work Conference at Construction Sites", the recent weather conditions in Beijing have been abnormal. , precipitation is more than in previous years. In order to effectively carry out flood prevention work at the construction site, the relevant requirements are now arranged as follows:

1. Requirements for flood prevention work

(1) Strengthen leadership and comprehensively improve emergency support capabilities

Flood prevention work implements the sixteen-character policy of "safety first, constant preparation, prevention first, and all-out efforts to resist danger", and implements the management principle of unified command and hierarchical responsibility.

All units must formulate targeted flood prevention plans and prepare for flood prevention. They must ensure that: the responsibility is assigned to the person and the command is in place; the situation is clear and the plan is feasible; the preparations are sufficient and the measures are effective.

(2) Implement responsibilities and comprehensively strengthen the construction of the plan system

The main body of responsibility for flood prevention work is the general construction contracting unit, and the project manager of each project is the first person responsible for flood prevention work. All units must comprehensively strengthen the construction of the emergency plan system and formulate their own emergency plans for flood prevention based on their own actual conditions. Ensure clear responsibilities, effective command, timely warning, and rapid response.

(3) Strengthen training and drills and improve actual combat capabilities

Each unit must organize training and drills based on its own actual conditions. First, organize various forms of professional training, focusing on emergency command, Plan preparation, information publicity, material management, etc.; second, each unit must organize professional rescue teams to conduct rescue drills.

Training and drill work should achieve "three combinations, two in place, and one achieved." That is to say: training and drills should be combined with the "five implementations" of flood control (organization, responsibility, measures, funds, flood control materials), combined with the flood control emergency plan, and combined with the disasters that have been prevented (such as foundation pit collapse accidents caused by rain). Integration; ensure that the responsible persons for flood control are in place and all measures are in place; overall, the actual requirements must be met.

(4) Seriously carry out flood prevention inspections and completely eliminate safety hazards

All units must conduct investigations and studies on the progress of the project, and conscientiously organize the investigation of flood prevention safety hazards and the identification of hazard sources, Establish a ledger to ensure that detailed, complete and verifiable checks are carried out, and the ledger is clear; problems discovered must be dealt with promptly and practical measures must be taken; experts must be organized for hidden dangers that really affect flood control safety and are difficult to solve. Demonstrate, formulate and implement safety emergency flood control measures.

2. Specific measures for flood prevention

1. During the flood season, all units must strictly implement the "production duty system" and strictly enforce duty discipline. Leaders responsible for flood prevention work are not allowed to leave their posts at will.

2. The flood season is rainy and humid, which is a period of high incidence of electric shock accidents. Construction units must do a good job in waterproofing construction machinery and equipment, and in particular, carefully check temporary electrical equipment, related electrical circuits and protective grounding measures to prevent short circuits, electric shocks, and lightning strikes.

3. All units should formulate flood and lightning protection measures for tall scaffolding and tall machinery and equipment during strong winds and thunderstorms, and should strengthen inspections of the foundations of the above-mentioned equipment after rain. For the rainy season construction of large steel structures, a special lightning protection plan should be formulated as soon as possible and organized and implemented before the flood season to ensure the safety of construction in the rainy season.

4. All units should strengthen safety education during the flood season for on-site management personnel and construction personnel, and continuously improve workers’ awareness of production safety, self-protection and safety during rainy season construction.

5. All relevant units should strengthen information reporting, report flood prevention work dynamics in a timely manner, and keep information flowing. If there are any abnormalities or emergencies, they should immediately report to the District Construction Bureau and activate the construction site emergency plan. Report incidents step by step as required.

3. Key points of flood control work

All foundation construction and trench construction must take prevention of collapse and rainwater backflow as the key points of flood control. Monitoring of the project and surrounding buildings must be strengthened. We also formulate preventive measures and prepare emergency plans based on the characteristics of the project and the surrounding environment, and prepare materials for flood prevention in advance, such as water pumps, sandbags (sand and gravel), grouting equipment, temporary lighting equipment, etc. If abnormal conditions are discovered during the monitoring process or are hit by heavy rain, measures must be taken promptly to prevent accidents.

There are many new construction projects in our district this year. The flood control situation is severe and the task is arduous. All units must attach great importance to it and make careful arrangements to ensure that their construction projects can survive the flood safely in a spirit of being highly responsible for people's lives and property.

Flood prevention notice in the rainy season 3

Dear owners/residents:

According to the latest weather forecast from the municipal meteorological department, heavy rains are expected from tonight to tomorrow. In order to effectively carry out prevention work, To reduce natural disasters caused by continuous heavy rains, the management office is making relevant defense arrangements while reminding all owners/residents to take self-protection measures:

1. Minimize going out or outdoor activities, and keep doors closed Doors and windows in the room;

2. Collect clothes to be dried on the balcony indoors in time;

3. Move flowers, trees and decoration materials placed on the balcony indoors, or stabilize them on the balcony

4. If there is a private garden on the first floor, please place items in the garden that are easily blown down by the wind or should not be exposed to rain. Move items indoors;

5. Check whether the floor drain pipes on your balcony/terrace are unobstructed;

6. Properly arrange or take care of the elderly and children at home to prevent accidents;

7. When parking in the park, please carefully check whether the car windows, etc. are closed.

8. If you encounter lightning, please turn off the power of your home appliances in time to prevent damage to home appliances caused by lightning strikes. At the same time, please prepare lighting tools to prepare for temporary power outages;

< p>If you have any other urgent need for help, please contact the property management company in time. Flood Control Notice 4 in the Rainy Season

All units of the company:

According to the weather forecast and notification from the Flood Control Office of Dongfeng Company, the rainfall in the past two days has been heavy and lasted for a long time, which is very easy to induce In the event of landslides, landslides and other geological disasters, in accordance with the instructions of company leaders, all units are required to conscientiously carry out flood control and geological disaster prevention work:

1. Strengthen inspections of flood control ditches, slope protection walls and other parts of the jurisdiction, and find that In case of abnormal situations, take emergency measures immediately and report the situation;

2. Take protective measures or set up warning signs for key parts;

3. Prepare flood control and rescue materials and personnel; < /p>

4. Strengthen duty, and keep communication open between leaders of each unit and personnel on duty. Flood prevention notice 5 in the rainy season

County (city) and district property management departments:

The main flood season of 20xx has arrived. In order to effectively carry out flood prevention work in the property community and ensure public safety in the community *** To ensure the normal operation of facilities and equipment and protect the lives and property safety of residents in the community, the relevant work related to flood prevention in the flood season of our city's property community is hereby notified as follows:

1. Strengthen flood prevention publicity work

Property management companies in the jurisdiction are required to widely publicize flood prevention knowledge and preventive measures during the flood season through publicity boards, electronic displays, hanging slogans, etc. in the community, and promptly notify owners of early warnings and forecasts through various forms to help owners strengthen self-prevention implementation of measures.

2. Organize and carry out pre-flood self-inspection and maintenance work

Notify the property management company in the jurisdiction to inspect the roads, main sewer network, manholes, septic tanks and other facilities and equipment in the property management area Carry out comprehensive inspections and maintenance, and improve inspection records and assessment management systems to ensure smooth roads and drainage during flood season.

3. Strengthen safety and emergency response plan management

Require all property management companies to prepare flood prevention equipment and have dedicated personnel to keep it; implement a project manager responsibility system to enhance project managers’ sense of responsibility and safety awareness , establish a flood control emergency plan leading group, with the community project manager as the first responsible person, responsible for handling emergencies during the community flood control period, and carry out focused investigation of incidents such as heavy rain water intrusion in high-rise underground garages and sudden flooding in the community. Conduct emergency response drills to ensure that emergency plans and handling measures are in place.

During the flood season, all property management companies must adhere to a 24-hour duty system and report disasters in a timely manner. The property management departments of all counties (cities) and districts should conduct regular spot checks. ;