Joke Collection Website - Blessing messages - Project manager's work summary
Project manager's work summary
Summary of Project Manager's Work 1 Engaged in the construction industry for many years, and accumulated rich project management experience in the construction industry. At the same time, I also participated in systematic theoretical study to do more and better things for this industry. Therefore, it is imperative to find the shortest board and find a breakthrough that suits you.
On the whole, it is superficial and insignificant to complete the content of post responsibilities, maintain a harmonious public atmosphere and rest on one's laurels. Whether it is for things or people, it needs to be effective. Insist on ideological and political study, and constantly improve their ideological and theoretical literacy.
Since xx years, I have systematically understood the spirit of creating a healthy atmosphere, building harmony and striving for first-class theme education carried out by the Science and Technology Bureau, and learned various professional and technical knowledge by buying books, surfing the Internet and going out for inspection. Through continuous study and communication, I have further improved my ideological and theoretical accomplishment and firmly established my outlook on life and values of serving the people wholeheartedly.
People respect each other and morality; Love is the intersection of people; Get along with others and take care of each other; People believe in honesty. Among them, respecting morality is the most important, which is reflected in image, in being a man and doing things, and in striving for first-class performance. The professional ethics of love and dedication is the guarantee for the smooth development and ultimate success of every job. Over the past year, I have consciously practiced the above purpose in my actions, completed every task with full enthusiasm, full enthusiasm, carefully and meticulously, strictly abided by various laws and regulations and unit rules and regulations, and adhered to the principles of fairness, justice, seeking truth from facts, openness and transparency. In daily life, we should unite with comrades, have a decent style, put an end to illegal and disorderly behaviors such as eating and getting cards, consciously resist the erosion of various unhealthy trends, win a good reputation at the grassroots level, and constantly improve our ability to deal with problems.
Hard engineering construction practice has increased my business skills and enhanced my working ability.
With the favorable opportunity of three years' great changes in X city, the budget of the Science and Technology Center Building has been adjusted again and again, and the technology content is getting higher and higher. According to the deployment of the leaders, I am specifically responsible for planning and implementing the X lighting demonstration project.
This project was planned, designed, developed and installed in the interior decoration construction stage after the completion of the main building, and was designed and developed by four scientific research units with the cooperation of more than a dozen units. During the period, I went out for more than a dozen inspections, organized brainstorming seminars for many times, contacted a large number of industry leaders, and developed dozens of special lamps and control products. After countless sleepless nights, a demonstration project of a certain scale was finally formed. After many investigations and evaluations by experts and industry units, the project scale and R&D level are at the domestic level.
Through this practice, my ability to solve practical problems and organizational skills have also been well exercised, my work style has been further improved, my understanding of building electricity has been more thorough, and my ideological realm has been further improved.
Due to the shortage of manpower in the engineering department, I am also responsible for the outdoor pipe network project and the residential environment project that started this spring. This is the first time I have been fully responsible for outdoor projects since I started my career. Designed by two units, nearly ten units participated in the construction. Some theories are very poor. In view of this situation, we did not wait, rely on and need, gave full play to the advantages of wide knowledge and strong coordination ability, and adopted measures such as consciously extending working hours, implementing the next day's work by telephone the night before, encrypting on-site guidance, and personally reviewing survey and setting out, and successfully completed the tasks assigned by the leaders. At the same time, it has experienced the test of heavy rain, achieved good engineering quality, no water on the ground, introduced high-tech flowers and trees, and used advanced technology and technology in the construction of Huai' an Road. It has produced a good reputation in the industry.
The implementation of this project is an all-round test of previous knowledge and experience, and it is also a confirmation of one's coordination and control ability, which is undoubtedly of great significance to perfecting one's knowledge structure.
In the fourth quarter, the' X Pavilion' project took over, focusing on water supply and drainage, and at the same time carrying out air conditioning system research.
In a year's time, the strong electricity major I am responsible for has successfully realized two high-voltage power transmission, and I am more familiar with and master the process and key links of the power import project. On the basis of the original system design, combined with the ever-changing indoor fine decoration design, dozens of hand-drawn lighting and power plans are another test of endurance and theoretical knowledge. Fortunately, the system runs normally and has passed the test.
No pains, no gains. My achievement is an affirmation of all my efforts in the past year.
Through one year's efforts, the achievements are as follows:
1, responsible for more than a dozen sub-projects such as strong electricity, weak electricity, outdoor pipe network, residential environment, power supply introduction, landscape lighting, emergency lighting renovation, garage lighting, solar hot water, natural gas introduction, steam introduction, indoor landscape pool design and construction, and coordination of Beijing Federation, making history. One person does the work of three people, one day is used for two days, and there is no rest day all year round, which gives full play to his personal potential and tangible and intangible benefits to the center construction.
2. Going out for bid evaluation for three times, evading funds, and directly wasting 50,000 yuan, which was praised by Party A. ..
No safety and quality accidents occurred in the implementation of the project he was responsible for.
4. Responsible for the security work, and personally deployed the security measures for the opening and opening activities, which ended perfectly and won favorable comments.
5 responsible for the design and construction of centralized solar hot water system, which has been put into use, must be in the province.
6. Assist in the implementation of solar energy hot water engineering in the office building of the Bureau, and consult Yishengtang Power Project.
Summary of Project Manager's Work 2 Time flies, and 20xx years have passed quickly. Looking back on the past year, I can't help but feel deeply. From the completion and acceptance of xx Street, the commencement of xx Road to the end of the year, the work of this year passed by in front of us. With the care and guidance of the head office leaders and the mutual care and cooperation of colleagues, this year's work practice and study have come to an end. Next, I will report on my work in the past 20xx years as follows:
A, the project quality completion
Xx road xx municipal engineering started in xx month, 20xx. As a project manager, I immediately set out to set up a project department. Firstly, according to the characteristics of the project, the quality management system, project management objectives and post responsibility system of managers are established. After the project starts, we strictly control the construction quality, starting from the foundation and step by step.
The pipeline project is a concealed project, which focuses on controlling all links in the construction. Only by strengthening the quality control of each link in the construction can we prevent the occurrence of various quality common faults and ensure the excellent construction quality of the whole project. Power trench engineering focuses on controlling the quality of trench excavation, formwork installation, steel binding, brick masonry, concrete pouring and backfilling on both sides of trench. Road engineering focuses on the control of subgrade survey and setting-out, lime soil and lime-fly ash macadam laying construction.
In the process of construction, I demand that the content of preventive measures be resolutely implemented, so as to foster strengths and avoid weaknesses and improve the quality awareness of project department personnel. During the whole project construction, we carried out the implementation seriously.
So far, no common quality problems have been found. The construction of the whole project, after careful control of the project, all the construction contents meet the requirements of self-inspection, and the main quality is good, reaching the expected quality goal.
After the commencement ceremony of xx, xx, xx river embankment improvement project, coordination was not in place, which led to the mechanical entry of the project on xx, xx, xx. The main contents of the project include embankment foundation, slope protection, culvert and subgrade engineering. Large-scale construction will be carried out in an all-round way after the year.
Second, the project production and schedule control
Since the commencement of xx Road xx Project, I have organized and formulated the construction schedule network plan, machinery and labor plan according to the construction period required by the contract. And according to the requirements of construction progress, with the construction team and management personnel held a meeting on quality, progress and safety in production. Make detailed and specific requirements for its specific progress and production.
In the production process, according to the actual situation, I made a monthly plan and a weekly plan to control and manage the whole project production. Judging from the progress of the whole project, it lags behind the original contract period, but it still reaches the progress required by Party A. The spring construction in 20xx reduced the workload and ensured the smooth completion and timely delivery of the whole project.
Third, safety management.
In the process of construction preparation, I organized the project department to plan and arrange the construction work area of the whole site. According to the characteristics of this project, in the construction process, I insist on safety management as the focus of daily management. To this end, I have strengthened the management work from the following aspects:
1, strengthen safety technical disclosure. Strengthen the safety awareness of employees through three-level safety education when entering the site and special safety disclosure when taking up the post.
2. Strengthen safety inspection and patrol, find problems in time, rectify them in time, and put an end to potential safety hazards. Strengthen the safety protection of the construction site.
3. During the construction, the site temporary electricity utilization inspection shall be carried out regularly, and potential safety hazards shall be found in time, and timely maintenance and replacement shall be carried out. During the whole construction period, no potential safety hazard occurred, and the expected safety production goal was achieved.
Four, materials, cost reduction and labor cost management
In terms of material management, according to the construction budget, I organized the construction material demand plan. In the use of materials, I ask everyone to adhere to the quota acquisition system. According to the construction budget, arrange the project manager to count the construction content and quantity of each team in time, and make a comparative analysis with the budget in time to control the material use and labor cost distribution of each subdivisional work.
The machines, tools, materials and worn-out materials used by each team shall be evaluated according to the budget, and each item shall be counted. If waste is found, it should be corrected in time. Turnover materials shall be returned by the team after use, and each team shall be responsible for compensation for the insufficient quantity.
Five, the shortcomings of the work throughout the year
1. project quality: strictly control the project quality during the construction period, and the overall project quality is good. But there are also some shortcomings. In order to build high-quality projects, I need to make more efforts to remind myself that the quality management in the later period needs to be further strengthened.
2. Construction progress: Generally speaking, the progress basically meets the requirements of the owner. However, compared with the contract period and other tenders, the progress is slow. We also need to further strengthen the schedule management, sum up the shortcomings, strengthen the human organization, and make up for the shortcomings of the previous construction.
Project manager's work summary 3 Time flies, the sun and the moon fly like a boat. In a blink of an eye, I have been in the company for X years, and my performance has reached a stage of steady development, which is inseparable from the company's management system and strict requirements. Thanks again for the wise decision of the higher authorities and the hard work of colleagues. Looking back on this year's works, the overall form is considerable. During the year, individual projects were not optimistic in the process of completion, which is summarized as follows:
A, the management and supervision of the construction site
Management is not only a reasonable arrangement and scheduling of workers, a clear division of labor, but also a responsibility to people. Supervision is to track the progress of on-site construction work. The details that should be paid attention to in each stage, and every possible unfavorable situation in the next stage can be guaranteed in time through supervision. It is precisely because of these two points that I didn't do it properly, which led to a mistake in X's single business and failed to live up to the expectations of the company leaders and the enthusiastic help of all my colleagues. I feel very ashamed. Failure is the mother of success. In the future, it must be strictly managed, and the responsibility must be clear to people, so that workers can understand their responsibilities. This is the importance of ensuring quality; On-site supervision should be well informed and follow up in time!
Second, the guidance and training of technical posts
The decoration industry is increasingly sophisticated, the market is tight and the competition is fierce. Technical requirements are the key to survival, there is nothing better than this! The operation of technicians in the construction process is the fundamental guarantee of quality! China has a large population, but any company or enterprise needs talents more. Excellent technicians are one of the indispensable talents for the company's development. Only by providing guidance and training to employees, consolidating skills, collecting talents, recruiting talents, adapting to people's needs and tapping people's strengths can the technical content be continuously improved. Therefore, we plan to continue to expand the team next year, eliminate the fittest, achieve unqualified technology, and resolutely do not take the technical post!
Customer is God, and service increases the negative value of products. Under the premise of not affecting the interests and reputation of the company and individuals, we should be responsive, consolidate old customers and enhance their reputation. Customer demand is our pursuit!
Summary of Project Manager's Work 4 Time flies, and a year is about to pass. In order to better carry out our work in the future, we will sum up our work in the past year and make our work plan for next year as follows:
First, the preliminary construction preparation stage
As an investment promotion project in xx county, the xx department store project can basically get government support and help as long as it is conducive to the construction progress. However, before the smooth start of construction, the following work must be completed.
1, laying out the basement control line.
2. Building alignment.
3. The planning department shall conduct line inspection.
4. Submit the leveling points and coordinate control points provided by the surveying and mapping department to the general contractor.
5. Organize the design disclosure of foundation pit supporting construction drawing and the blue prints.the design twice.
6, pile foundation construction drawing design disclosure and the blue prints.the design.
7. The planning department shall provide the drawings of municipal pipelines around this project.
8. Assist to complete the expansion work of temporary power shortage on site.
9. Before construction, go through the quality supervision procedures at the quality and safety station.
Second, the construction stage
Before piling construction, the foundation pit earthwork has been dug to a depth of about two meters and five meters. Because there were no construction drawings at that time, most places were not excavated in place. Considering that there are enough working faces in the surrounding row of piles, it is necessary to cooperate with the earthwork excavation unit to dig out the remaining soil. For a long time, the earth excavation unit didn't cooperate with our work arrangement, kept antagonistic feelings with us, and even made trouble at the construction site, so the construction site work could not be carried out at the moment. Through our patient and meticulous communication, we learned the unit price of earthwork excavation in other local sites, and finally reached an agreement with the earthwork excavation unit through rewards.
After the foundation pit is excavated for 2.5m, it will have a great impact on the site piling. The concrete truck can't drive into the construction site at all, and the surface of the foundation pit is covered with silt. Once it rains, the bearing capacity of silt layer drops sharply, and piling construction is very difficult. The general contractor will use this as an excuse that there is no condition of three links and one leveling on the construction site, which leads to claims for expenses and time limit. We made a decisive decision and actively organized the local construction unit to backfill the pond slag in the site, which ensured the need of piling construction in the site.
The hardest part is actually in the beginning After three weeks at the site, the general contractor still hasn't arranged for the pile driver to enter the site. It is also true that the general contractor did not receive the official pile foundation construction drawing provided by us, which is not convenient for organizing machinery to enter the site. However, after we provided the blueprint of pile foundation construction on xx, xx, xx, the general contractor still failed to enter the pile frame. The general contractor encountered great difficulties in finding subcontractors, and found more than a dozen units back and forth, but they were unwilling to undertake this business. It was not until xx that I entered several piles in a row. On xx, xx, xx, the trial pile construction of podium and tower began, and the trial pile construction of podium was successful, but the trial drilling of tower ended in hole collapse six days later.
The tower pile must enter the rock 1.5 meters, and the circulating drilling rig encounters pebbles with large particle size in the sandy pebble layer (the largest pebble collected on site is close to 40 cm), which is easy to block the pipe. Later, with the consent of the design unit, the tower recycling hole-forming process was changed to impact hole-forming process, and the general contractor organized six impact hammer drills to enter the site on xx.
First try to make a hole in the north side of the tower, but the soil layer about three meters on the north side of the ground is quicksand. When lifting the hammer, the heavy hammer, quicksand and casing are pulled up together, which makes it very difficult to form a hole. Considering not to delay the construction period of the tower pile foundation as much as possible, the pile test construction will be started on the south side of the tower, and the pile test will be started on xx, and the concrete pouring of the first pile will be completed on xx. However, due to the limited working face on the south side of the tower, only four piles can be placed for construction. At the same time, we have not given up our efforts on the north side of the tower. After consulting various experts, we put forward some suggestions, such as dewatering first, and then arranging piling construction. The general contractor has successively carried out well point dewatering, shallow tube well dewatering, grouting and other strengthening foundation construction technologies, but none of them have achieved the required results. Geological factors on the north side affect the construction of about 60 pile foundations, and together affect the construction of about 70 uplift piles in the surrounding pure basement. The next step will be deep well dewatering, and then piling construction will be arranged.
The podium pile foundation construction task has been completed, including 57 towers and 1 15 pure basement piles, with a total of 349 piles (46%).
Third, the work plan for next year
The progress of pile foundation construction is lagging behind, and the main work in the next stage is to arrange work around earthwork excavation to ensure that the basement floor pouring is completed before the flood season. Main work arrangements
Concrete structures below 0 and 000 1 shall be completed before 65438 and 20xx.
2.20xx Complete the concrete structure of the podium before the end of the year.
The tower at the bottom of 3.20xx has been capped.
4. Electromechanical installation, curtain wall construction, secondary structure construction and fine decoration construction are carried out in the main structure construction.
Four, the current need to coordinate other work.
1. Provide a full set of construction drawings, and examine and approve the construction drawings.
2, fire, HVAC, weak current, hardcover, curtain wall, elevator and other subcontractors.
3. Determine the brand information provided by Party A and Party A. ..
In the new year, I will work hard from the following points.
1. Strengthen business knowledge learning and continuously improve management level: With the progress of the times and the application of new technologies, we must learn professional technical knowledge and management knowledge to improve our management coordination ability. Continuously improve the professional skills of subordinate employees to ensure that the quality and progress of on-site construction are effectively controlled.
2. Further do a good job in site management: In the work of 20xx, although some achievements have been made in the projects I am responsible for, there are still many shortcomings that need to be further summarized and improved. Only by summing up the past well can we serve the future better. In short, in the new year, I will further improve myself, research and improve project management methods, and make contributions to the development of the company.
Summary of Project Manager's Work With the care and support of leaders at all levels in the company, under the wave of reform in which the project manager is responsible for the company's projects in 5-20xx years, xx Project Management Department has always implemented the service concept of "building a quality life" for the owners, followed the principle of "excellent service and fine management", and carried out various services and management work, which has achieved certain results, but also exposed some shortcomings. The work summary report for the year is as follows:
First, the team was successfully formed.
Reasonable integration of human resources, effective training, efforts to improve cohesion and combat effectiveness, team building from the initial stage to the running-in period and then to the standard period of a smooth transition.
On xx, xx, I was appointed by the company leaders to work in xx project management department. At first, the project was based on local conditions and multi-channel recruitment, and the personnel formation was basically completed before the delivery of the house at the end of XX. After a year of training, running-in and experience, employees have moved from turmoil to stability. The Project Management Department currently has xx employees and xx key personnel, with a retention rate of xx%, and organized training for various employees for xx times, with a training coverage rate of 100%.
On xx this year, due to the negligence of the construction unit, a heavy rain in the evening caused a lot of water leakage in the basement of the community. The project manager department immediately launched the emergency plan for flood control, and all the staff present cooperated sincerely, using sandbags to divert water, and fought until late at night, without causing any economic and property losses; On xx, xx, xx building, the sewer pipe of xx unit in the residential area was blocked, and dirty water had poured into xx room. Due to the limited manpower of the construction party, in order not to affect the sale of houses by the sales department, the project manager department immediately took measures to transfer personnel from the engineering class, cleaning class and maintenance team to clean up. After several hours of dredging and flushing, the interior was restored to its original state. These examples fully reflect the enthusiasm of employees and the idea of "ownership". In xx, with the completion of community, business and sales 17 cough closure, a United, cooperative and centripetal team gradually formed 17.
Second, reduce staff and increase efficiency, save energy and reduce consumption.
Open source and reduce expenditure, continuously increase the charging rate and complete the annual economic indicators.
1. Fees: In daily work, including off-duty hours and holidays, our project personnel will send a "payment notice" by phone and SMS, and then send a registered letter to collect various fees, and actively try to ensure the rate increase. The monthly rate of xx has reached xx%.
2. In terms of material procurement: the project adheres to the principle of proximity, low price and high quality to develop local suppliers and control costs.
3. Reducing staff and increasing efficiency: By outsourcing the cleaning team, integrating the staff of the living, commercial and sales departments, and recruiting xx personnel to supplement the order maintenance team, the labor cost can be saved by about xx million yuan;
4. In terms of energy saving and consumption reduction: by controlling the turn-on time of courtyard lights, landscape lights, unit lights and corridor lights, adjusting the turn-on times of fluorescent lamps in the basement, and turning on a transformer to reduce reactive power loss, energy consumption can be saved by about xx thousand yuan;
5. In saving consciousness: through training, the consciousness of "saving glory" has been established in the hearts of all employees. In xx this year, through many consultations with the construction party, it successfully took over its elevator car protection measures, saving nearly xx million yuan. In xx this year, after the rain grate at the entrance of the underground garage was crushed by heavy vehicles, the engineering class used their brains to make temporary rain grate by themselves, which not only avoided damaging the owner's vehicle, but also saved nearly xx thousand yuan.
In 20xx, the project management department mobilized the enthusiasm of all employees and tried to increase income and reduce expenditure. By the end of xx, it is estimated that the annual economic indicators of xx billion yuan income and xx% profit rate can be exceeded in the whole year.
Third, adhere to the tenet of "excellent service and fine management"
Clarify the division of responsibilities, sort out and standardize the workflow, and gradually improve the service quality and management level, thus improving the satisfaction of the owners.
1, standardization of workflow such as handover procedures, transformation, rectification and cooperation.
From the centralized delivery at the end of xx, to the decoration formalities for the owner, and then to the coordination of the owner's indoor rectification, the customer service staff of the project management department grew up in fatigue and injustice. At present, the customer service team has gradually standardized the process for the owners, which not only reflects the high-quality service quality but also avoids all kinds of risks. By the beginning of xx, more than xx households had been handed over for renovation, and more than xx rectification orders had been processed, delivered and recorded, and complaint services had been provided for more than xx times, and various warm reminders and work contact sheets had been issued.
2, the owner's indoor decoration inspection and public * * * area, public * * * facilities and equipment inspection, maintenance normalization.
The engineering class of the project management department insisted on the daily inspection of decoration, dealt with the violations in decoration, damaged the facilities in public areas for more than xx times, and received fines and compensation of more than xx yuan. At the same time, learn from the experience of other projects handed over by the company, actively cooperate with developers and various construction units to handle the handover of public facilities and equipment step by step, establish a facility and equipment account, and adhere to various inspection systems and maintenance plans for more than 1000 sets of various facilities and equipment, so that it is normal for someone to be responsible, inspected and recorded. Throughout the year, the timely maintenance rate of our property service center was 100%, and the qualified rate was 100%.
3. Focus on safety work.
Due to the geographical location of the community and the complicated surrounding social environment, the characteristics of the community are destined to be the most important. Over the past year, the personnel flow of the order maintenance team has been relatively large, but with the implementation of various trainings and personnel integration, the team is relatively stable at present. During the period, the community experienced various unexpected xx, which was handled in time and properly, and the risk was well avoided. At the same time, the order maintenance team conscientiously summed up the experience and lessons, adjusted the post setting, and made every effort to do a good job in civil air defense. At the end of the year, with the electronic fence, west gate, pedestrian access control gradually in place, the fire control system gradually in place, the safety prevention and fire safety work of the project management department has been greatly improved.
4, outsourcing units, maintenance units, convenience services and on-site maintenance personnel supervision institutionalized.
Community cleaning belongs to outsourcing. In the past six months, the project management department has adhered to quality standards, strengthened supervision, insisted on twice-weekly assessment by special personnel, refined and quantified quality standards, distinguished work responsibilities, and ensured that the environmental sanitation of the park reached the standard. In addition, the management of greening, elevator maintenance personnel and convenience service personnel is also assigned to the team leader level, and the management of these personnel is becoming more and more standardized, and cooperation is also better, which solves some daily difficulties of the project.
Since the reform of project management, the staff of project management department have worked hard to learn and understand the new management methods and the corporate culture of "cultivating talents while cultivating experts" and constantly improve their own quality. After clarifying the division of responsibilities of each team, each team leader and key personnel shall set an example, abide by rules and regulations, adhere to work standards, pay close attention to work execution, reward diligent and punish lazy, reward excellent and punish bad, and the project intends to punish xx points at the beginning of xx. In addition, the project management department emphasizes walking service, requiring managers to actively communicate with owners, employees and local superior administrative departments, listen to opinions and suggestions, and constantly improve their working methods. The effective combination of management and service has greatly improved the satisfaction of owners. By the beginning of xx, the project management department had received two pennants and two thank-you letters.
Fourth, look at yourself
Recognize the shortcomings and make clear the direction of improvement.
1, individual team leaders and employees still have selfish departmentalism and one-sided thinking, which is not conducive to team harmony and deepening reform. The project manager will further strengthen the training on the significance and essence of the reform, pay attention to cultivating employees' awareness of the overall situation and responsibility, and improve their comprehensive quality.
2. The security work of the community needs to be refined and improved. At present, the public security situation in residential areas is still grim. All the staff of the project management department should be highly alert ideologically, check for leaks and fill vacancies in their work, highlight the effective cooperation between civil air defense and technical defense, sound the alarm bell and make unremitting efforts.
3. There are still some shortcomings in increasing the income of parks and business districts. In the future work, the project manager department will continue to explore ideas and strive to generate income for enterprises in advertising, network coverage and special services.
Looking back on 20xx, xx project management department has experienced an extraordinary year from the preparation at the beginning of the year to the running-in in the middle of the year and then to the maturity at the end of the year. The new year is coming, and all our staff will continue to unite sincerely, forge ahead together and work hard to make more and more contributions to the development of the company and the project!
- Related articles
- Jiamusi senior high school entrance examination sports scoring standard
- Provide SMS for mobile phone activities.
- How to make a first deposit of one yuan in Dandan Island 2?
- How to query the received SMS records?
- Can the police restore the formatted mobile phone?
- How to write the sentence announcing divorce?
- Soul, someone tagged you in a text message.
- 2019 Spring Festival condolence letter from the property company to the owners
- Will Pratt & Whitney send a message if the loan is successful?
- Will you call me when the express arrives?