Summary of typhoon rescue and disaster relief work
Summary of typhoon rescue and relief work 1 1. Make full preparations before the disaster.
First, strengthen organizational leadership to ensure that personnel are on the job. Cancel the Mid-Autumn Festival holiday, formulate the duty schedule, implement the duty system of leaders in charge, implement 24-hour duty, and all staff are on standby. Ensure that all the managers of the 66 disaster avoidance points in the whole region are on duty, and ensure that all the rescue and relief teams are on duty. They are divided into two groups, each with five people, and director Zhang Zaigeng and researcher Sharla Cheung are responsible for making good preparations for disaster relief. The second is to start the emergency plan and make mobilization and deployment. Quickly start emergency response, timely issue disaster prevention and mitigation notices to the streets, mobilize and deploy the streets to make preparations for the opening of typhoon shelters, reception and resettlement, and do a good job in disaster verification and disaster reporting. On the eve of the landfall of Typhoon Kloc-0/4 at 22: 00, researcher Sharla Cheung personally led a team to inspect disaster-prone communities (village reform communities, landslide-prone areas) and communities with a large number of relocated people to guide the defense work. The third is to prepare for disaster relief and ensure sufficient materials. Check the materials in the disaster relief warehouse, prepare food and drinking water in advance at the disaster avoidance point, and notify the agreed reserve merchants and disaster relief warehouses to be ready to supply materials at any time. Each disaster shelter ensures that the affected people have food, clothing, shelter and clean water to ensure their basic livelihood.
The second is to fully invest in emergency rescue and disaster relief.
First, timely and accurately report the disaster. Strictly implement the statistical system of natural disasters of the Ministry of Civil Affairs, designate a special person to be responsible for the submission of disaster information, and report the disaster situation and disaster relief work within the specified time. The implementation of zero reporting system, smooth streets, community disaster information reporting channels, timely and accurate reporting of the disaster. The affected population in the whole region 103630 people, damaged houses 105 rooms. The second is to transfer the masses in a timely and safe manner. Always put people's life safety first. A total of 9,229 people were resettled in the whole region, including 3 165 people in centralized resettlement and 6,064 people in decentralized resettlement. The third is to distribute enough materials in time. Effectively protect the basic livelihood of the affected people, and distribute *** 10 16 pieces of clothes and quilts at all disaster-avoidance points, and give about 40% discount to other living materials. 850,000 yuan
Third, quickly carry out post-disaster reconstruction.
The first is to formulate the issuance requirements. Quickly draw up the work plan for post-disaster reconstruction, and issue Several Requirements of Huli District Civil Affairs Bureau on Post-disaster Reconstruction of Typhoon Moranti (Xia Humin [20xx] No.60) to guide the post-disaster reconstruction of street communities. Second, actively coordinate military assistance. Take the initiative to dock the troops within the jurisdiction and ask for support from the troops. Do a good job in helping officers and men, timely check the food security situation in various streets and communities, and ask the streets to fully ensure that officers and men have enough to eat, eat and rest. * * * The army has 20xx officers and men engaged in emergency rescue and post-disaster reconstruction, which has become the main force of emergency rescue and disaster relief work in our region and made important contributions to post-disaster reconstruction in our region. (Among them, the city assigned 7 10 regiment, 278 regiment of the 93rd Armed Police Division, *** 1350 officers and men of Fuzhou detachment, and the district double support office coordinated 665 officers and men. Third, the whole cadres and workers participate in reconstruction. A rescue and relief team of 30 people was set up. Director Zhang Zaigeng personally led a team to the street community to participate in the obstacle clearing work, and successively ***200 people went to Changle Community, Teachers' Training School, Shuangshi Middle School, Gulong Apartment, Crystal Forest, Shangcheng and other communities, schools and residential areas in Heshan Street to participate in the garbage removal and road obstacle clearing work. The fourth is to mobilize social forces to participate extensively. More than 100 social workers from Peishan Social Service Center, Xiahui Elderly Service Center, Sheikh Social Worker and Aibo Social Worker spontaneously went to the front line of disaster relief, actively participated in post-disaster reconstruction in 53 resident service communities in the whole region, and helped to do a good job in garbage removal, road dredging, elderly appeasement and temporary traffic command. At the same time, more than 20,000 registered volunteers in our region were mobilized to participate in disaster relief and post-disaster reconstruction. Influenced by volunteers, many residents have joined the volunteer team consciously, and "social worker+volunteer" has become a beautiful landscape in the rescue and relief team in our district.
IV. Next Work Plan
Do a good job in helping the poor, low-income households, low-income families, the disabled, key special care recipients, five revolutionary elders and severely affected households. Do a good job in the distribution of materials donated by Nanping to our district.
Summary of typhoon rescue and disaster relief work 2 This year's No.9 strong typhoon "Meihua" successfully passed through Shanghai this Sunday (August 7), which brought certain wind and rain impact to Shanghai. Due to the change of typhoon direction, no loss was caused to the branch factory. In order to strengthen the targeted prevention work, improve the typhoon prevention ability of the branch, further improve the practicability of the emergency system of the branch, and ensure the safety of the employees and property of the branch, the typhoon prevention work is summarized as follows:
1, the factory leaders attached great importance to this typhoon prevention work and achieved good results.
The emergency leading group of the branch factory responded positively after receiving the notice of the company on preventing the strong typhoon "Meihua". The leaders of the branch immediately organized personnel to start work, arranged to contact emergency supplies at the first time, and made arrangements for typhoon prevention.
2. The members of the emergency team of the Branch responded in time and cooperated in place.
After receiving the notice from the company, the emergency group of the branch immediately arranged a special person to contact the emergency management office of the company about the flood control sandbags, and arranged a list of flood control and emergency rescue personnel. The information about the arrival of the typhoon was immediately notified to all employees of the branch. The branch factory arranges electricians to waterproof all the electrical cabinets in the workshop and equip the distribution room with submersible pumps for drainage. In addition, the factory arranges special personnel to place sandbags at the entrance of the factory warehouse and workshop, and prepare fire buckets. Before the arrival of the typhoon, the leaders of the branch factory once again led the members of the emergency team of the branch factory to make a detailed inspection of the typhoon prevention preparations of the branch factory, so as to be foolproof.
3. Unify thoughts and deal with them seriously.
Through this typhoon prevention drill, the employees of the branch factory have further improved their ideological understanding, improved the emergency prevention level of the branch factory, and laid a good foundation for similar emergency drills in the future. With the coping experience, the branch will seriously sum up this exercise and strive to make the future work more comprehensive and solid.
Summary of typhoon rescue and relief work 3 According to the spirit of the Emergency Notice on Doing a Good Job in Typhoon Defense and Response, XX made early research and deployment, actively carried out flood control and typhoon resistance, paid close attention to typhoon movements, and implemented various flood control and drainage measures, which laid a solid foundation for this flood control and typhoon resistance and resumed production. The work is summarized as follows:
One is to unify thoughts and clarify responsibilities.
After receiving the relevant notice, XX made serious preparations to defend "XX". First, hold a special meeting on XX flood control and typhoon prevention, clarify the responsibilities of various departments and posts, analyze possible accidents, and carry out flood control and typhoon prevention work in a planned and step-by-step manner. The second is to organize all employees to learn the company's flood prevention and typhoon prevention plan and the main points of flood prevention and typhoon prevention, and have full psychological preparation for the rainstorm weather when Typhoon XX landed, recognize the seriousness of flood prevention and typhoon prevention, and leave no dead ends in emergency treatment.
Second, plan ahead.
XX started the emergency plan, strengthened the duty force in each region, and the duty personnel paid close attention to the trend of "XX"; Send a typhoon warning message to all employees, asking all employees to enter the scene and stand by, get ready at any time, and keep their mobile phones on for 24 hours; When the vehicle is driving, control the speed, drive according to the rules and operate safely; Check whether the doors and windows are in good condition and closed; Staff check whether rain gear, blankets and other service facilities are in place.
The third is the typhoon crossing the border and actively responding.
Damage: eaves fall off, and there are many leaks on the third floor.
Countermeasures: report to the property first, and after receiving the reply that can't be repaired in time, send employees to tear off the fallen part and repair it after the typhoon leaves.
Four. Next step
According to the experience and lessons of this typhoon, our next steps are as follows:
1. Strengthen publicity and education on typhoon prevention, improve all staff's understanding of typhoon, make all staff consciously do typhoon prevention, typhoon avoidance and emergency rescue work when typhoon comes, comprehensively improve their awareness of typhoon prevention and enhance their self-protection ability.
2. In view of the problems exposed in this typhoon prevention and flood control work, carefully analyze their own shortcomings, strive to improve and perfect all the work, and strive to be detailed, practical and well done. At the same time, learn from the advanced experience of other brother units in typhoon prevention and flood control, establish and improve a long-term mechanism for typhoon prevention and flood control, and make due contributions to the smooth progress of the company's safe production.
Summary of typhoon rescue and disaster relief work. After receiving the early warning notice of typhoon "Lichima" on the 9th this year, our street immediately earnestly implemented the typhoon prevention instructions and the spirit of the district meeting. Leaders attach great importance to it and deploy it in time. Qi Xin, the broad masses of the society, made concerted efforts to take strict precautions, invested a lot of manpower and material resources, and made the most adequate emergency preparation and response. Under the correct leadership and command of the district committee and government, Loushan Street and Qi Xin, all the communities and units under its jurisdiction, made this time come true.
After the typhoon emergency response was released, the street quickly held a typhoon mobilization meeting. The main leaders of the street asked all typhoon prevention personnel in the area to improve their posts, resolutely overcome the careless thinking, and put forward the prevention work requirements one by one in view of the key hidden dangers existing in various communities and units in the area. All communities and units publicize residents' typhoon prevention knowledge and safety precautions during typhoons through the Internet and posting notices, and timely report the latest meteorological information. During the typhoon-affected period, a typhoon prevention team of 40 people was assembled in the street, and more than 200 people were organized by various communities and units to defend against typhoons. The 24-hour duty system and the leadership shift system were strictly implemented. The leaders of various communities went deep into the grass-roots units, organized investigations around key hidden dangers and weak links, urged the implementation of preventive measures, and actively mobilized the people to transfer and evacuate the old houses and sheds. * * * Relocation 165438.
After the typhoon, street leaders immediately went deep into various communities and enterprises to check the disaster situation, and no accidents such as casualties and major property losses occurred.
Summary of typhoon rescue and disaster relief work 5 According to the relevant information and trends of typhoon Nida, our bureau has been paying close attention to the progress of typhoon and taking effective measures to vigorously carry out typhoon defense actions in accordance with the requirements of typhoon prevention plan to ensure the safety of people's lives and property.
On August 1 day, Director Zhang Fuzhen presided over a special meeting on geological disaster prevention caused by Typhoon Nida No.4 in 20xx. The main leaders of various departments, land reserve centers, sub-district offices and land institutes, directors of villages with high-risk geological hazards, experts from geological teams, staff of construction supervision units of geological disaster control projects, and leaders of various stone yards attended the meeting. The meeting made specific arrangements for the objectives, tasks and requirements of typhoon prevention work, and the responsibilities of various units and departments.
After the meeting, the main leaders of our bureau led the team, and the staff of our bureau's Geology and Mineral Resources Department, various land offices and Daya Bay Geological Team formed four inspection teams to conduct on-site inspections on hidden geological hazards and quarries within the jurisdiction of three sub-district offices.
In order to ensure that the people are clear about the importance of typhoon prevention, our bureau has sent more than 300 disaster prevention short messages, and arranged for the director of the village committee led by the Ministry of Land and Resources to distribute more than 300 warm tips on typhoon prevention to residents near the hidden danger points of ground disasters.
From the evening of August/KLOC-0 to 9: 00 the next morning, 77 experts from seven emergency working groups and geological teams led by the main leaders of our bureau were on emergency duty at four emergency command points of the State Land Branch, Hesheng Binhai City and three state land offices. Deputy Director Zhang led the staff of the Ministry of Geology and Mineral Resources to continue emergency duty from August 2 to August 4.
From August 2 nd to 4 th, Deputy Director Zhang led experts from the Ministry of Geology and Mineral Resources and Daya Bay Geological Team to review the hidden danger points of geological disasters in the jurisdiction. After inspection, the hidden dangers in various places are stable and no new geological disasters have occurred. There are no property losses and casualties among residents around hidden danger points and two stone yards in the whole region. As of August 5, our bureau has not received the report on the danger and disaster of geological disasters.
Summary of typhoon rescue and disaster relief work 6 I. Basic situation of typhoon
Typhoon 10 "David" was centered at 301/north latitude on August 2nd. 4 degrees, east longitude 130. 8 degrees, the maximum wind force near the center 12, and continue to move to the west-northwest direction at a speed of about 40 kilometers per hour. It will enter the northeastern part of the East China Sea tonight, and may land in southern Jiangsu to the southern coast of Shandong Peninsula on the night of the 2nd. Affected by the typhoon, there will be obvious wind and rain weather in our city, and the wind will gradually increase, with 6-7 gusts on land and 8 gusts at sea, 9-11; The rainfall is moderate to heavy, and local heavy rain is a great threat to our company. However, under the unified command and deployment of our company, we made the most adequate emergency preparations to ensure zero casualties and minimize disaster losses. The work of defending against Typhoon David in Welded Pipe Factory is summarized as follows:
Second, the disaster statistics:
1, zero casualties;
2. Engineering losses.
Third, typhoon defense work
Company leaders attach great importance to typhoon prevention. The leaders of all departments of the Welded Pipe Factory sat in the headquarters of the base, made unified arrangements and made careful arrangements, and held an emergency mobilization meeting to prevent typhoon in time. All units responded quickly, cooperated closely, started the "Three Preventions" emergency plan and emergency work procedure in time, established the patrol system on duty at all levels, strengthened measures, and took the initiative to take precautions. All defense work was carried out in an orderly and effective manner, ensuring zero casualties and minimizing disaster losses.
The main work is as follows:
1, carry out typhoon prevention work on site.
After the typhoon yellow warning signal is issued, immediately notify all units to stop aerial work and reinforce all equipment and facilities. Subsequently, the heads of the workshops at the headquarters led a team to conduct on-site inspection and confirmation.
2, the implementation of key drainage work
According to the weather forecast, the typhoon will be accompanied by heavy precipitation. Therefore, before the typhoon is officially affected, we should concentrate on dredging all temporary drainage pipes in the outfield to ensure that the base can discharge flood quickly and effectively in the process of heavy precipitation. This work was completed before the typhoon yellow warning signal was issued.
3, the implementation of personnel transfer work
Disaster prevention and mitigation work has always unswervingly implemented the most basic principle of "people-oriented" typhoon prevention, with ensuring zero casualties as the biggest goal of typhoon prevention. On the evening of August 2nd, Rizhao issued Typhoon red warning signal, and the company leaders immediately issued two emergency instructions for Typhoon red warning signal:
First of all, stop production, and all workshop personnel must be evacuated to the established resettlement sites;
Second, all personnel entering the resettlement site must obey the unified arrangement of the workshop and the headquarters, and must not damage the equipment and facilities in the resettlement site;
4, the implementation of emergency rescue work
In order to carry out emergency rescue work quickly and effectively in the event of danger, the headquarters has equipped a sufficient number of sandbags at the gates of various factories and organized rescue and relief teams.
On the morning of August 3, the typhoon warning signal was lifted.
The Electrical Machinery Division held a special meeting on the repair of damaged parts such as workshops and windows to study and determine the on-site repair scheme.
Four, disaster prevention and mitigation work plan and measures
1, set up typhoon prevention headquarters, with the factory director as the commander, the production section chief as the deputy commander, and other members as members of the headquarters.
2, pay close attention to the release of the typhoon, through news, newspapers, Internet and other channels to collect and understand the nearby and local sea surface activities and typhoon forecast information, so as to prepare and defend early.
3, factories, offices, walls, color steel tiles and other things that are easily blown off by strong winds should be reinforced in time, materials and equipment should be in place, and the lighting and power cables in the venue should be laid and fixed firmly to prevent being blown off by typhoons and electric leakage and electric shock accidents. Gantry crane should be fixed with wire rope in time.
4, unified command, graded responsibility. In case of typhoon danger, the on-site typhoon prevention headquarters should conduct unified command and perform their duties to ensure that all typhoon prevention orders are issued smoothly and effectively implemented.
5. Formulate typhoon emergency plan, and formulate targeted response measures according to different characteristics such as typhoon wind force, arrival time of typhoon maximum wind force and typhoon direction.
6. Prepare materials and equipment for typhoon emergency rescue, do a good job in danger removal and reinforcement, and eliminate all kinds of safety hazards of on-site personnel and equipment.
7. When the typhoon comes, report to the local competent department in time, do a good job in the safety reinforcement of construction equipment, do a good job in the safe transfer of people and property with hidden dangers, and increase the density of safety inspection, especially in places prone to danger, and report immediately when major danger signs are found, and organize forces to carry out emergency rescue.
8, material warehouse and open-air warehouse should be checked in advance, if there is any defect, should be repaired immediately. The materials in the open-air warehouse should be placed neatly, and the vulnerable items should be put in the warehouse. Lighter items should be held down with heavy objects or tied with iron wires.
Summary of typhoon rescue and disaster relief work. Typhoon Lichima is threatening. Since the afternoon of August 9, Jiashan County has experienced heavy rain to heavy rain and windy weather. During this period, all the staff of our hospital took active actions and made careful arrangements, and successfully completed the flood control and typhoon resistance work. The work is summarized as follows:
First, the meeting deployment, emergency implementation
After receiving the notice from the higher authorities about doing a good job in defending against Typhoon Litchma No.9, our hospital immediately held an emergency meeting to fight against Typhoon Litchma No.9, with middle-level and above cadres attending the meeting.
At the meeting, director Quan Fenggen conveyed the spirit of the conference on preventing Taiwan, informed the dynamics of Typhoon Lichima, and asked all member units to attach great importance to preventing Taiwan as the top priority at present, and made arrangements for the current work on preventing Taiwan. First, it quickly issued a notice of resistance to Taiwan to the enterprises under its jurisdiction, demanding that all work be done to welcome Taiwan, with the focus on "two passengers and one danger" enterprises. The second is to implement the "Three Preventions" policy, focusing on further strengthening and implementation in terms of ideological understanding, personnel in place, material preparation, and duty, with emphasis on emergency vehicle preparation (5 trailers, 1 tractor). The third is to strengthen information release, grasp the information of class lines and bus stops in time, and report the information of typhoon prevention in time. The fourth is to comprehensively investigate hidden dangers, and all stock rooms should immediately go to the scene to guide and deploy Taiwan prevention work. Fifth, the logistics support work is in place. From today, make good preparations for duty, ensure that mobile phones are open 24 hours a day, and all staff members stick to their posts and work normally on weekends.
Second, go deep into enterprises and carry out inspections.
On the afternoon of August 9, under the leadership of Director Quan Fenggen, the enterprises in charge inspected the "two passengers and one danger" enterprises, bus companies, maintenance enterprises, driving and training institutions and taxi companies, and asked all enterprises to effectively improve their ideological understanding, make good preparations before the typhoon, and ask all enterprises to stop working when they stop working. Our hospital dispatched 46 people to inspect 20 enterprises. On August 10, except for some dangerous goods vehicles that protect people's livelihood, which are allowed to be transported by higher authorities, all other vehicles with "two passengers and one danger" are parked in safe areas.
Third, strengthen duty and submit information.
According to the deployment of superiors, our hospital has arranged 24-hour duty personnel, requiring all staff to be on duty, do a good job on duty and submit the "three defenses" information.
Four, start the plan, delivery of goods and materials
After receiving the notice from the superior about supporting the coast, our unit started the emergency plan as soon as possible, got in touch with Jiaxing Fiona Fang Logistics Co., Ltd. in time, and arranged 1 trucks to transport rescue equipment such as assault boats to support the coastal disaster relief.
Summary of typhoon rescue and disaster relief work 8 After the formation of the ninth typhoon "Meihua" on July 28 this year, our town attached great importance to it, and the town party Committee and government paid close attention to the development of typhoon and actively made preparations for typhoon prevention and resistance.
First, attach great importance to and fully understand the situation of preventing Taiwan
With a highly responsible attitude towards the safety of people's property and combined with the current flood fighting and disaster relief work, our town focused on typhoon prevention and established a typhoon prevention responsibility system with the top leaders of the party and government as the core. Strengthen communication with all departments in time to analyze and judge the possible harm caused by this typhoon. Typhoon No.9 has strong intensity, strong wind and heavy rainfall. We are fully aware of the grim situation we are facing, always pay attention to the typhoon trend, formulate targeted countermeasures according to the typhoon prevention plan, do a good job in typhoon prevention seriously and carefully, and minimize the losses caused by disasters.
Second, act quickly, make careful arrangements and guard against Taiwan.
Our town has quickly started the plan, taking typhoon prevention as the top priority of the current work. According to the working principle of "prevention first, combining prevention with rescue", the typhoon prevention work in our town is fully deployed. Hold a meeting of heads of villages and stations in the town, implement the spirit of important speeches by leaders at all levels, and quickly put typhoon prevention work in place. Arrange the team members to guarantee the village, and implement the responsibility to the specific head. All villages and units are required to immediately convene an emergency mobilization meeting to defend against typhoons, establish a responsibility mechanism for preventing Taiwan, and convey all the arrangements at all levels to cadres and the masses, requiring cadres and the masses to overcome their paralyzed thoughts and luck, and go all out to do all the preparations for preventing and resisting Taiwan. Party and government leaders are required not to go out, and those who have already gone out should come back immediately, strengthen the leadership of preventing Taiwan and direct the work of preventing Taiwan from the front.
The third is to highlight key points and seriously investigate potential safety hazards.
All units in the town should strengthen measures and strengthen leadership according to their job responsibilities, and the main leaders of the units should take overall responsibility. Do a good job in the management and protection of efficient agricultural facilities, especially the reinforcement of vegetable greenhouses and breeding communities and the drainage and drainage of farmland and water bodies; Do a good job in the protection of reservoirs, rivers, sluices and dikes; Do a good job in the safety inspection of school houses, rural dangerous houses and construction sites. All villages and units are required to carefully investigate hidden dangers, arrange special personnel to be on duty, be responsible for observation and inspection, and organize emergency protection and early warning in time once dangerous situations are found. The main leaders and personnel on duty of villages and units should keep smooth communication, timely, comprehensively and accurately grasp the information of typhoon dynamics and defense work, and report emergencies in time.
Fourth, make preparations to improve disaster prevention and resilience.
According to the division of responsibilities, all villages and units in the town are ready, and emergency supplies and rescue teams are ready to ensure that disaster relief personnel, materials and funds are in place as soon as possible. At present, the whole town has collected 6 ships, updated a number of flood control woven bags, life jackets and shovels, and equipped some raincoats, rain pants, emergency lights, wire steel pipes and other flood control materials. Establish an emergency rescue team 14, with a total number of 4 18 people. Solid preparations have further improved our town's ability to prevent and resist Taiwan, and minimized the losses caused by typhoon disasters.
In the next step, our town will pay close attention to the latest trends of typhoons and further strengthen its leadership and work in accordance with the deployment and requirements of typhoon prevention in provinces, cities and counties. Strengthen the implementation of various defensive measures, make comprehensive preparations for emergency rescue and disaster relief, and strive to win the final victory in the work of preventing and resisting Taiwan.
Summary of typhoon rescue and disaster relief work 9 In the process of defending against Typhoon Mangosteen No.22, the discipline inspection and supervision organs at all levels in XX City took action at the first time, resolutely put supervision ahead, earnestly improved their political positions, and strictly implemented them with a high sense of political responsibility, which provided a strong guarantee for doing a good job in defending against typhoons.
Front-line combat command requires strict discipline. /kloc-Since September of 0/6, Liang Riduan, member of the Standing Committee of the Municipal Party Committee, secretary of the Municipal Commission for Discipline Inspection and director of the Supervisory Committee, immediately rushed to Jiangzhou District and daxin county to personally supervise the on-the-job performance of party committees, governments and discipline inspection organs at all levels; According to the requirements of division of labor, the leaders of the Municipal Commission for Discipline Inspection supervised and inspected the implementation of the work of defending against the super typhoon Mangosteen in counties (cities, districts) by telephone and unannounced visits, requiring discipline inspection and supervision organs at all levels not only to strengthen the supervision of the implementation of disaster prevention and mitigation measures in relevant departments to ensure that responsibilities and work measures are in place, but also to strengthen the investigation and review of their own office safety hazards, and to investigate safety hazards to ensure foolproof.
Earnestly perform supervisory duties and compact responsibilities at different levels. Discipline inspection and supervision organs at all levels in the city, through field visits, telephone spot checks, etc., focus on the supervision and inspection of personnel placement, relief materials preparation, transfer of personnel to be transferred, hidden dangers investigation, shelter arrangement, establishment of emergency teams, uploading and issuing mechanisms, and opening of help hotlines in the typhoon prevention work of all units directly under the city, further consolidating the responsibility of all units in the city to do a good job in typhoon prevention. Discipline inspection and supervision organs at all levels and accredited institutions are required to strengthen supervision and inspection of violations of laws and regulations such as official inaction, fraud, dereliction of duty and infringement of the interests of the masses. Causing serious consequences or adverse social impact, not only the direct responsibility will be seriously investigated, but also the relevant leadership responsibilities will be investigated, and typical cases will be selected for public exposure. At present, the discipline inspection and supervision organs at all levels in the city have conducted more than 260 telephone inspections and sent personnel to supervise 184 person-times.
Investigate all kinds of hidden dangers to ensure the safety of disciplinary review. The Municipal Commission for Discipline Inspection comprehensively considered the safety risks such as water and power outages that may be brought by typhoons. On September 15, after asking the Commission for Discipline Inspection of the autonomous region, the detained personnel who may have potential safety hazards in the first case handling point in XX city were transferred to the second case handling point in XX city in time. Convene a special meeting, demanding that the first case-handling point be investigated again for potential safety hazards, conduct a comprehensive inspection of the water and electricity situation in the detention place, and clarify the safety responsibilities and implement them to people; In view of the fact that the second case handling point is close to the mountain, we will organize professionals to investigate geological disasters such as collapse, landslide, mountain torrents and mudslides, fully consider the safety hazards brought by typhoons such as wind and flood prevention, debris flow prevention, rockfall prevention and power failure prevention, and take corresponding preventive measures to ensure the safety of disciplinary review.
- Previous article:How to query the information of real estate license under personal name?
- Next article:Happy 7th birthday wishes to my son
- Related articles
- Wenzhou Bank Mobile Banking Transfer Limit
- How do telecom mobile phones open traffic by sending short messages?
- Excuse me, what is the difference between the information in Traffic Management 12 123app and the webpage? Well, I applied for an appointment for subject one and failed the first time. I received it o
- What is the telephone number of Henan Zhongyuan Consumer Finance Co., Ltd.?
- How to match your video with a sound show is actually the same.
- Where is the air defense alarm in Dalian?
- Wancheng financial dunning process
- How does HONOR intercept harassing SMS verification code SMS?
- How to choose a knowledge management system platform suitable for our company?
- Classic phrases for young people