Emergency plan for typhoon prevention of mechanical equipment (select 5 articles)

Accidents will inevitably occur in daily life or work and study. In order to reduce the consequences of accidents, it is often necessary to make emergency plans in advance. How to prepare an emergency plan? The following is my emergency plan for typhoon prevention of mechanical equipment (selected 5 articles), hoping to help you.

Emergency plan for typhoon prevention of mechanical equipment 1 1. purpose:

Establish an emergency plan for flood prevention and typhoon rescue, strengthen the flood prevention and rescue ability of the management service area through the training and actual combat drills of emergency teams, eliminate dangerous situations more effectively and timely, reduce losses to a minimum, and ensure that the flood prevention and typhoon rescue work is foolproof.

Second, responsibilities:

The director of the management office is the commander-in-chief of flood prevention and typhoon rescue;

The person in charge of the management office is the deputy commander, who is responsible for the overall work of the equipment group;

The safety promoter is the deputy commander, responsible for the overall work of the rescue team;

The environmental organizer is the deputy commander-in-chief, responsible for the overall work of the logistics team;

The control center is responsible for the accurate transmission and coordination of information;

All off-duty personnel in the management office are emergency rescue team members for flood prevention and typhoon prevention.

Third, the division of responsibilities of the group:

3. 1 rescue team: it is composed of all the off-duty safety officers in charge of safety.

3. 1. 1 Take all measures to deal with the dangerous situation;

3. 1.2 Responsible for filling, handling and stacking flood control sandbags;

3. 1.3 use various methods to eliminate dangerous situations in time.

3. 1.4 Division of labor

3. 1.4. 1 Two off-duty central posts are responsible for loading sandbags;

3. 1.4. 2 2 No.2, No.3 and No.4 are responsible for transporting sandbags;

3. 1.4.3 Two off-duty No.6 and No.8 are responsible for piling sandbags on site and taking other measures for emergency rescue;

3. 1.4.4 The safety sponsor leads the rescue team to take all other effective methods to do all rescue work well.

3.2 Equipment group: consists of the manager of the management office and two technicians of the management office.

3.2. 1 Responsible for starting various pumps and power supply equipment;

3.2.2 Provide technical guidance to the rescue site;

3.2.3 Conduct emergency maintenance on the field equipment.

3.3 Logistics Group: It consists of environmental sponsors, domestic helpers, lifeguards, front desk attendants, cashiers and club attendants.

3.3. 1 Ensure the normal supply of all kinds of relief materials;

3.3.2 Be responsible for the rescue of the wounded on site;

3.3.3 Actively assist other groups;

3.3.4 Division of labor

3.3.4. 1 Two off-duty No.5 posts are responsible for logistics and material support;

The front desk attendants, cashiers and club attendants in 3.3.4.2 are responsible for evacuating people and rescuing the wounded, transferring the wounded to a safe place and reporting to the municipal emergency center in time;

In 3.3.4.3, lifeguards and domestic helpers are responsible for property rescue.

3.4 personnel on duty

4. 1. 1 When the personnel on duty find the danger, they shall promptly notify the center and the leaders on duty;

4. 1.2 After receiving the information, the attendant in the center shall take emergency gathering and other measures to call off-duty personnel to relieve the danger in time;

4. 1.3 The personnel on duty in the center shall immediately notify the management office manager, management office supervisor and safety director;

4. 1.4 center attendant reports to each duty post;

4. 1.5 Maintain the order of posts on site and guide personnel and vehicles;

4. 1.6 The attendant in the center should pay close attention to the site situation and seek other support when necessary.

4. 1.7 Before the typhoon comes, all posts in the management office should carefully check the potential safety hazards within their posts, eliminate the danger in time, and report the serious cases to their superiors in time.

Note: all members must obey orders, obey orders; All members should pay attention to their own safety during emergency rescue.

Emergency Plan for Typhoon Prevention of Mechanical Equipment 2 (1) Division of responsibilities of each post

1. The security department should do a good job in information transmission, resource allocation and related logistics support for rainstorm emergencies.

2, engineering maintenance department is responsible for water supply and drainage, power supply, air conditioning, elevators and other mechanical and electrical equipment ` failure and emergency treatment.

3. The public security fire department of the property service company is responsible for the "three defenses" emergency treatment, security and voluntary fire fighting, and is also responsible for emergency rescue and disaster relief.

4. The cleaning and greening department is responsible for greening, environmental disaster protection and post-disaster recovery.

(2) Typhoon prevention, flood control and emergency treatment

1. After receiving the typhoon or rainstorm warning signal, the property service company should immediately mobilize urgently, and all departments are in a state of war. At the same time, a command team manager should be set up as the chief commander, and the heads of various departments should be members of the temporary headquarters of the three defenses. Relevant personnel should implement a 24-hour duty system and prepare for flood control and disaster relief.

2. Before the typhoon or rainstorm comes, measures should be taken to prevent wind and prevent water immersion, such as: do emergency work for wind and prevent water immersion, close doors and windows, and check and clean up flood drainage equipment, facilities, advertising signs, flower pots, etc.

(1) Check whether all doors and windows, especially double-door glass doors, are adequately protected and stable.

(2) Fix all items that are easy to loosen, especially those located on the roof and balcony. Some items that are easily blown down by the wind, such as flower pots, should be moved indoors or tied tightly.

(3) Check all drainage pipes, manholes, rainwater pipes, etc. , and remove the garbage, silt and sundries that may cause siltation.

(4) Ensure that all emergency appliances are available at any time, such as sandbags, raincoats, helmets, water boots, ropes, standby lighting, square timber (for fixing glass doors), etc.

(5) Check whether the drainage pump system is normal and unobstructed.

(6) Check whether the power generation system and its oil supply device are normal, and try to develop the motor set according to regulations.

(7) Turn off the neon power.

(8) Whether the intelligent system equipment runs normally.

(9) After the inspection, solve the problems found in time, and report to the leader immediately if there are any problems that cannot be handled.

3. In case of typhoon and rainstorm, the security officer on duty will strengthen the patrol of key areas and parts such as windproof and waterproof immersion, and check the condition of doors and windows. If there is broken window glass, they will rush to the scene as quickly as possible and temporarily cover it with plates. Maintenance personnel of the engineering department are on standby, and management service personnel at all levels stick to their posts. If there are complaints about equipment failure and potential accidents are found, emergency measures should be taken to solve them in time.

4, personnel at all levels to assist maintenance technicians to do a good job of flood drainage and water drainage.

5, in the typhoon, flood and other natural disasters and accidents, to prevent the occurrence of criminal cases.

(3) Post-disaster treatment

After the typhoon and thunderstorm, the engineering department organized maintenance personnel to inspect the equipment and facilities under its jurisdiction, and repaired them in time if any damage was found. The cleaning department inspected and restored the damaged trees in an attempt to minimize the impact of the disaster. The property manager reports the disaster and losses to the general manager of the company in time.

Emergency plan for typhoon prevention of mechanical equipment 3 In order to ensure the safety of life and property of all teachers and students, ensure the healthy and harmonious development of education and sports, do a good job in the prevention and disposal of typhoon disasters in our park, ensure the scientific, orderly and efficient rescue and relief work, and improve the comprehensive emergency response capability for flood prevention and typhoon prevention, this plan is specially formulated according to the documents of Zichuan District Education and Sports Bureau and the actual situation of our park.

The first is to set up a leading group for flood prevention, typhoon rescue and disaster relief.

Team leader:

Deputy team leader:

Members: Class teachers.

Second, the emergency leading group division of responsibilities

Responsibilities of the team leader: Under the leadership of the higher authorities, carry out the instructions of the district flood prevention and typhoon rescue and relief headquarters, and fully command the rescue and relief work of He Zi Central Kindergarten.

Responsibilities of the deputy head: According to the dangerous situation in kindergarten, put forward the plan of risk elimination and emergency rescue. Report to the Central School Security Office in time, analyze and summarize the relevant disasters, and provide scientific basis for the team leader to make decisions. According to the instructions of the team leader, direct the rescue team to carry out emergency rescue. Organize enough emergency materials to be delivered to the scene of the emergency school. Contact the medical department, mobilize medical personnel and equipment, and form a medical team to participate in the school rescue and disaster relief work. Contact the public security department to maintain school traffic order and organize the evacuation and transfer of children and park staff.

Responsibility of members

1 Fully grasp the disaster situation and all kinds of dynamic news, and submit the important information of the disaster situation at the first time according to the important information reporting system to ensure the smooth flow of information channels.

Responsible for checking the implementation of disaster prevention measures in this class and maintaining the normal order of teaching and activities in the class.

According to the requirements of superiors, do a good job in disaster relief in the park, stabilize the children's emotions, and all the work goes smoothly.

Three, the implementation of the emergency measures responsible for the school during the flood season and typhoon, strengthen flood control and emergency rescue efforts.

1. According to the principle of "who is in charge, who is responsible", organize a working group for flood control and typhoon prevention, implement necessary emergency measures, and strictly implement all work for flood control and typhoon prevention.

2. Pay attention to listen to and record the weather forecast, do a good job of prevention in time, and close the doors and windows and related electrical equipment in time.

3. In case of danger and disaster, rescue work should be organized according to the work plan, and immediately reported step by step.

4. The implementation of leadership shift, 24 hours on duty, immediately mount guard, to carry out flood prevention and typhoon prevention work, and set up temporary walkways for stagnant water areas, so as to quickly and independently rescue and ensure the safety of children.

Emergency plan for typhoon prevention of mechanical equipment. Guiding ideology:

Preventing typhoon and rainstorm is an important work related to the life safety of teachers and students and the safety of national property. In order to effectively protect the safety of teachers, students and property, and improve the ability of kindergarten to deal with flood prevention and typhoon prevention, this plan is formulated in line with the principle of "prevention first, safety first".

Two. Preventive measures:

1, list of leading groups and contact telephone number

Team leader: Director Bi Yijun

Team member: Gong Fei, head of the logistics team.

Yao Yihua, Director of Education.

Chairman of Zhang Yan Trade Union

The kindergarten started the typhoon prevention and flood control plan, and implemented the 24-hour leadership and 24-hour duty system.

Three. Emergency measures:

1. Strengthen information communication to release and report information.

When there is a big flood, all the leaders are in place, and the leading group for flood control and typhoon prevention begins to operate; The competent leader shall report the disaster to the leading group for flood prevention and typhoon prevention; Fully deploy typhoon prevention and flood control work.

2. Give priority to prevention:

Clear the corridor. Before the typhoon lands, it is necessary to clean up the sundries and flowerpots on the balcony and corridor to prevent people from being blown away by the wind when the typhoon lands.

Close the doors and windows. When typhoon and rainstorm come, the wind is strong and the rainfall is heavy. Close the doors and windows to prevent the wind and rain from damaging the doors, windows and furniture and causing casualties.

The doorman fully dredged the sewers and main collecting wells of the whole school.

Dredge drains and downpipes on school buildings, and trim and strengthen school trees.

Conduct a comprehensive safety inspection of the lightning protection facilities and outdoor wires of the whole teaching building.

Conduct a comprehensive safety inspection of outdoor antenna, outdoor unit of air conditioner and plug-in.

Conduct a comprehensive inspection of indoor power supply, sockets, doors and windows of all departments.

If the circuit and wires are interrupted due to typhoon, turn off the power switch and turn on the emergency light, flashlight or candle.

Four. Safeguard measures:

After the plan is started, kindergartens should make early warning and record information. Hold an emergency meeting, in the shortest possible time, deploy the kindergarten flood control and typhoon prevention work by telephone, inform the typhoon flood dynamics, and arrange the requirements and tasks of flood control and typhoon prevention, emergency rescue and disaster relief.

Keep close contact with superior departments and units at any time, strengthen information communication, and ensure information release and reporting.

Emergency plan for typhoon prevention of machinery and equipment 5 In order to effectively prevent geological disasters of unstable slopes of dangerous rocks and unstable slopes of mid-levels in xx town, minimize accidents and avoid personal safety and property losses of people, the following emergency rescue plan is formulated in combination with the actual situation of our town.

I. Main points of disaster situation

(A) xx unstable slope of dangerous rock mass

The unstable slope of xx dangerous rock mass is located behind Longshan Temple in Liyang Town. There are several prominent dangerous rocks on the top of the mountain, which affect the safety of people and property in Longshan Temple. In case of heavy rainfall for a long time, landslides may occur. In case of heavy rainfall for a long time, notify the personnel in Longshan Temple to evacuate in time.

(2) The unstable slope of Banbianshan dangerous rock mass

The unstable slope of Banbianshan dangerous rock mass is located in the south of Xiaolongshan Mountain in Liyang Town. Banbianshan Mountain is almost vertical, and there are many raised rocks on the surface, which are easy to fall. There are special police schools and houses near the dangerous rock in Huangshan City. Long-term heavy rainfall may lead to landslides. In case of long-term heavy rainfall, notify nearby personnel to evacuate.

Second, the emergency work leading group

Team leader:

Deputy team leader:

Members:

Three. Emergency response and action

(1) Emergency personnel

Tester: xx

Settlement point: xx

Contact: xxx

Transferee: Releasing.

(II) Emergency Team: xxx

(3) Emergency material reserve

The flood control and disaster relief materials in the town mainly include: raincoat/KOOC-0/2 sets, helmet/KOOC-0/2 sets, four folding charging recording and talking microphones, shovel/KOOC-0/0 sets, sacks/KOOC-0/00 pieces, and some sand. The above flood control materials are stored in the instrument room of the town and uniformly deployed by Comrade Lin Tianyou.

(4) Emergency response:

1, the town's leading group for flood control and disaster relief held a meeting to report the disaster situation and disaster relief work in the jurisdiction, analyze and predict the possible greater disasters, and deploy disaster relief work in the jurisdiction. Immediately report the disaster situation and disaster relief work in the jurisdiction to the District People's Government and the District Flood Control and Drought Relief Headquarters, and request the support of the district government.

2. Organize the whole town personnel to inform the residents of flood information in time by telephone, SMS, microphone and other means according to the urgency of the flood season; In case of emergency or interruption of power supply and communication, residents in disaster-prone areas should be informed separately, especially when related disasters may occur at night, and the reliability of information transmission should be ensured, so as not to miss one household or one person.

3, emergency personnel according to their respective responsibilities and tasks, after receiving the disaster weather forecast, should be on standby at any time, not to go out, after receiving the assembly command, should be in 15 minutes to the designated place, according to the command to organize rescue.

4. Publish the disaster situation. The town headquarters office summarizes the disaster situation and reports it to the district flood control and drought relief headquarters.

Fourth, post-disaster relief work.

1. Hold a meeting on self-help in production and life in time, and quickly organize the recovery of production and life.

2, seriously organize the nuclear disaster investigation, focusing on the verification of the collapse of houses caused by the disaster, especially the loss of particularly heavy victims such as all households.

3. According to the disaster situation after the nuclear disaster, formulate a rescue plan for the victims and implement it step by step.

Five, the basic requirements of flood control emergency work and work discipline

1. The Office of the Leading Group for Flood Control and Disaster Relief implements a 24-hour duty system during flood control. Strict work discipline, carefully record the situation on duty and report in time. During the flood control period, if a member of the headquarters needs to leave the local area on business, it must be approved by the main person in charge of the unit and arrange the flood control work within the scope of his duties.

2. The responsible person is fully responsible for flood control and disaster relief, and must ensure that the telephone is open 24 hours a day, arrange the duty in this area, supervise and urge the duty record and duty handover, and report the danger within 30 minutes, and shall not delay the rescue work.

3. Where in the flood season on duty and flood control and disaster relief work, dereliction of duty, irresponsibility, late reporting or personnel are not in place in time, the responsibility of the relevant personnel should be seriously investigated; If serious consequences are caused, the main responsible person shall be investigated for responsibility according to law.

;