How to write a project acceptance plan

Question 1: How to write the "Project Acceptance Standards and Acceptance Methods" in the bidding plan? It is included in the bidding documents. After copying it, see if there is anything missing, or whether the standards used by your company are higher. You can add more

Question 2: How to write an application for acceptance of environmental protection upon completion of a construction project (Sample application form for environmental protection acceptance upon completion of construction project)

Letter regarding application for environmental protection acceptance upon completion of ××× construction project< /p>

××× Environmental Protection Bureau:

In accordance with the approval of your bureau

××× construction project

Environmental impact

(report,

report

form) or environmental impact registration form (document number), my unit is at ××××× (location)

< p> The main body of the ×× project (project name) under construction has been completed.

The main contents include:

……

, (description and environmental impact assessment documents and whether their approvals are consistent), the pollution control facilities supporting the project have been built, and various pollution control and ecological protection measures have been implemented.

(and

conducted a trial production run with the consent of your bureau).

According to

"Construction Project Environmental Protection Management Regulations" and "Construction Project Completed Environment

Protection Acceptance Management Measures

" , our unit entrusted ××××× (monitoring survey

unit name) to prepare the environmental protection acceptance monitoring for completed construction

{

survey

}

Report

{

Table

}

)

Or fill in the construction completion environmental protection acceptance application registration card. We hereby submit it to your bureau, please

approve the environmental protection acceptance of the completed construction project.

Attachments

:

1

, Construction project completion environmental protection acceptance monitoring (survey) report (form);

2

, Construction project completion environmental protection acceptance application report (form, registration card);

Question 3: What are the assessment indicators for project completion acceptance? The question-based assessment and acceptance is mainly based on the target tasks in the project book. Now that you have applied for this project, there must be a feasibility study report, an implementation plan, and a project contract. The target tasks are based on those in the contract, which are the assessment indicators. It mainly includes the completion of project tasks (technical achievements achieved, published papers, patents, awards, etc.), benefit analysis, fund usage, and application benefit certificates.

Question 4: What are the acceptance criteria for science and technology projects? Hello! The acceptance standards for science and technology projects in different provinces and cities are different. Different technology projects are also different. It is recommended that you go to the Department of Science and Technology website to download relevant information. (To apply for science and technology projects, choose Bajie Technology Services)

Take Changsha City as an example:

The main contents of project acceptance include: 1. Various contents stipulated in the project contract as well as technology, The completion of economic and social development indicators; 2. The total funds determined in the project contract, the funds allocated by the municipal science and technology administrative department, supporting funds and self-raised funds are in place, the actual expenditure of project funds and the rationality and standardization of use nature; 3. The independent intellectual property rights obtained by the project; 4. The organization and management of project implementation.

Article 6 Project acceptance methods are divided into two types: meeting (on-site) acceptance and final acceptance. Meeting (on-site) acceptance means that the project undertaking unit submits an application after self-inspection after the completion of the project, and the members of the acceptance team use the meeting format to listen to the project implementation status introduction, questioning and other procedures, and conduct on-site inspections, discussions and form acceptance opinions when necessary. Final acceptance means that after the completion of the project, the project undertaking unit conducts self-examination in accordance with the contract under the organization of the recommending unit and forms a final report.

Article 7 Major special projects and key projects shall be inspected in the form of conference (on-site) acceptance. Major special projects must conduct on-site inspections; the acceptance of general projects shall be in the form of final acceptance.

Article 8 Awards, investment and financing funded projects and post-subsidy fund projects, as well as projects directly resulting from project research and development that pass unnecessary acceptance inspections such as scientific and technological achievement appraisals at or above the provincial level will no longer be organized for acceptance.

Chapter 3 Organization of Project Acceptance

Article 9 The Changsha Municipal Science and Technology Administration Department entrusts relevant science and technology intermediaries to organize the acceptance and performance evaluation of municipal science and technology plan projects. The comprehensive planning department of the municipal science and technology administrative department will be under the centralized guidance, and the supervision office will participate in the supervision throughout the process. 1. The acceptance of major special projects and key projects (including mid-term evaluation) shall be organized by relevant science and technology intermediaries and shall be conducted in the form of meeting (on-site) acceptance. 2. For general project acceptance, except for the projects of universities and scientific research institutes, which are organized by the science and technology offices of universities and scientific research institutes with recommendation qualifications according to the final acceptance method, other projects shall be carried out by the district according to the territorial principle. , The county (city) science and technology administrative department or the park science and technology management department organizes the acceptance by itself according to the final acceptance method. After the acceptance, the recommending unit will write a self-examination report and submit it to the Changsha Municipal Science and Technology Administrative Department Project Director Office and Comprehensive Plan The department and the entrusted science and technology intermediary agency shall register and issue an acceptance certificate. When necessary, the entrusted science and technology intermediary agency can conduct random inspections and audits.

Article 10 Except for general planned projects, an acceptance expert group should be established for project acceptance. The acceptance expert group shall consist of no less than 5 experts in relevant fields (technical and economic fields) and science and technology management personnel, among which experts in the technical field shall account for no less than two-thirds of the total number of experts. Experts in relevant fields shall be in the municipal science and technology administration. Randomly selected from the expert talent pool of the competent department.

Article 11 Project acceptance experts shall be responsible for keeping the technical content of the accepted project confidential, and shall not use or disclose the technical data under review without authorization. If the project undertaking unit has confidentiality requirements for the research content, it may apply to the organization acceptance department. After review, if it is indeed necessary, the organization acceptance department shall sign a confidentiality agreement with the members of the acceptance expert group to stipulate the confidentiality period and content.

Article 12 The avoidance system shall be implemented for project acceptance. Project completion personnel and collaborators cannot participate in the acceptance work as members of the acceptance team. Chapter 4 Application for Project Acceptance

Article 13 The project undertaking unit must submit an application for acceptance or final acceptance within three months after the completion date specified in the Contract.

Article 14 To apply for acceptance of major special projects and key projects, the following materials must be submitted: 1. Application for project acceptance; 2. Planned project documents and planned project contract; 3. Project implementation technical report and work Summary; it should include the technical research process, relevant tests and inspections, results obtained, patents and relevant product (or prototype) data, fund usage, economic and social benefits, user reports, etc. 4. Final account of project funds; 5. Contents and suggestions for further organizational research or industrialization. The self-examination report of general projects should include a summary of the project implementation, the social and economic benefits generated by the technical achievements, and the final accounts of the funds, especially the use of funding funds.

Article 15 Applications for acceptance of major special projects and key projects should be reported to the project supervisory office of the municipal science and technology administrative department. The project supervisory office will review the acceptance documents based on the project contract. If the acceptance conditions are met, the project supervisory office will sign The opinions will be submitted to Changsha... >>

Question 5: How to write the project acceptance review opinions? Several regulations on the "Technology Project Acceptance (Evaluation) Opinion Letter"

Level of regulations: National regulations; Category of regulations: Management of scientific and technological achievements; Date of promulgation: 1996-08-20;

Issuing unit: Xiamen Science and Technology Bureau

Xiamen Science and Technology Administration [1996] No. 20

Relevant ministries, commissions, offices and bureaus, and county and district science and technology committees:

In order to adapt to the scope of the "Method for Appraisal of Scientific and Technological Achievements", it is planned to declare scientific and technological progress Award projects, in accordance with the spirit of Min Kecheng [1995] No. 18, the "Science and Technology Project Acceptance (Evaluation) Opinion" is specially formulated as one of the effective documents to prove the technical, economic and other comprehensive evaluation and achievement registration of the award project.

The following are the stipulations for the acceptance (review) of science and technology projects:

1. The acceptance (review) of this science and technology project is applicable to projects that are outside the scope of the "Appraisal of Scientific and Technological Achievements" and are intended to apply for the Science and Technology Progress Award. Including: (1) new scientific and technological achievements applied in socialist modernization construction; (2) promotion and application of existing scientific and technological achievements; (3) adoption of new scientific and technological achievements in the construction of major projects, development of major equipment and technological transformation of enterprises. Technology; (3) Introduction, digestion, absorption, development and application of foreign advanced technology; (4) Soft scientific research results; (5) Technical basic work (standards, metrology, scientific and technological information, etc.) serving social welfare; (6) The theoretical research results have been published for more than one year. It is one of the valid documents to prove the comprehensive evaluation and achievement registration of the award-winning project in terms of technology, economy and other aspects.

2. The procedures described in the acceptance (review) regulations of this science and technology project can be carried out in conjunction with the technical review, acceptance or professional academic activities of the relevant units. The acceptance (evaluation) personnel should be 5-7 peer experts with intermediate professional titles or above (including Sichuan scientific research, teaching, production and individual scientific and technological management personnel). Among them, the chief and deputy chief reviewers should have senior professional titles.

3. The acceptance (review) work of science and technology projects shall be accepted by the department responsible for assigning the project tasks or the scientific and technological achievement management department of the science and technology committee at all levels (the above departments are called the organization acceptance (review) unit) to accept applications and be responsible for the organization.

p>

(1) Projects assigned by *** departments at all levels will be reviewed by the assigning task department, and then submitted to the Municipal Science and Technology Commission Achievements Management Department for approval.

(2) The unit chooses or For horizontally linked projects, according to the administrative affiliation of the unit that completes the project, the municipal competent department or the county or district science and technology committee will accept the application and review it and then submit it to the municipal science and technology committee's achievement management department for approval.

(3) If combined. For technical review, acceptance or other professional academic activities, the project completion unit shall first obtain the consent of the unit hosting the above activities before applying to the organizing review unit

(4) Organize acceptance (review). After accepting the application, the unit shall review it in a timely manner and notify the applicant unit of whether it agrees to organize the review. The organization acceptance (review) unit may host or entrust relevant units (including review, acceptance or hosting units of professional and academic activities) to implement the project. Unit, etc.) to preside over the work.

Question 6: Briefly describe the conditions, scope and standards for project completion acceptance? The completion acceptance should generally meet the following conditions: 1. The project has been completed in accordance with the approved design regulations. ; 2. The projects of each unit can operate normally; 3. The problems discovered in previous acceptance inspections have been basically solved; 4. The archived data complies with the relevant regulations on project archives data management; 5. Issues such as land acquisition compensation and resettlement for project construction have been basically solved. Completed, the relocation and project management land acquisition within the safety protection scope of the project's main buildings have been completed; 6. All project investments have been in place; 7. The completion accounts have been completed and the completion audit has been passed. However, completion acceptance can also be entered under the following circumstances: 1. . Some unit projects have not yet been completed, but this does not affect the normal operation and efficiency of the main project. Sufficient investment should be reserved for the unit project during acceptance, and arrangements for completion should be made; 2. A small amount of final work cannot be completed due to special reasons, but this does not affect The project operates normally and safely. During acceptance, the completion work should be reviewed and relevant units should be instructed to complete the work within a time limit.

Scope: 1. Check whether the project is completed according to the approved design; 2. Check the project quality, assess the project grade, and evaluate the project. Put forward processing requirements for defects; 3. Put forward processing requirements for issues left over from acceptance; 4. According to the requirements of the contract, the construction unit hands over the project to the project legal person.

Standards: 1. According to the approved design documents; 2. The state’s supervision. Quality standards and acceptance specifications and procedures for each construction project.

Question 7: How to write a sample letter for completion acceptance of the construction unit? Housing construction project completion acceptance and quality assessment report Jianjian [2000] No. 142 "Interim Provisions on Completion Acceptance of Housing Construction Projects and Municipal Infrastructure Projects" (hereinafter referred to as the "Interim Provisions") issued by the Ministry of Construction and Ministry of Construction Order No. 78 The "Interim Measures for the Management of Completion Acceptance and Registration of Housing Construction Projects and Municipal Infrastructure Projects" (hereinafter referred to as the "Interim Measures") have been promulgated and implemented for one year. The completion acceptance of construction projects has been reformed from the verification system to the registration system. The quality of construction projects that have been used for many years has been The supervision agency's assessment of the quality grade of completed projects has been changed to the construction unit organizing participating units and relevant experts to form an acceptance team to inspect and accept the completed projects, which will be confirmed through filing procedures. However, during the actual completion acceptance process, some supervision engineers still do not understand the procedures and content of the completion acceptance, are not familiar with the "Interim Provisions" and "Interim Measures", and are not clear about the work to be done by the supervision unit and the quality assessment report that the supervision unit is required to provide. content. Therefore, this article summarizes and summarizes the procedures and contents of completion acceptance, the work that the supervision engineer should do during the completion acceptance stage, and the content of the quality assessment report. Can be used as a reference for peers. 1. The duties of the supervision unit at the completion acceptance stage 1.1 Review the engineering technical data submitted by the contracting unit and conduct pre-completion acceptance of the project quality. 1.2 Evaluate the project quality and submit a project quality assessment report. And sign the supervision opinions on the project completion report and project completion inspection form submitted by the contractor. 1.3 Participate in the completion acceptance organized by the construction unit. 1.4 At the completion acceptance meeting, report on the performance of the supervision contract and the quality of the project. 1.5 Accept the review of supervision archives by relevant parties. 1.6 Sign the completion acceptance report and completion acceptance record form signed by all parties involved in the acceptance inspection. 2. Assist the construction unit in the completion acceptance stage 2.1 Provide suggestions and consultation to the construction unit on the procedures and content of the completion acceptance, assist the construction unit in formulating the completion acceptance plan, determine the list of acceptance team members and the completion acceptance procedures. 2.2 Assist in obtaining approval documents or approval documents from urban and rural planning, public security fire protection, environmental protection and other departments. 2.3 Assist in notifying the local construction project quality supervision agency. 2.4 Assist in organizing completion acceptance. 2.5 Summary materials that record and summarize the performance of project contracts and the implementation of laws, regulations and standards by all parties involved in construction, survey, design, construction, supervision, etc. 2.6 Assist in reviewing the project files of the above participants. 2.7 Assist in organizing on-site project quality inspection. 2.8 Assist the construction unit to make a comprehensive evaluation of project survey, design, construction, equipment installation quality and management links, coordinate the opinions of all parties, and draft completion acceptance opinions. 2.9 Assist the construction unit to submit completion acceptance filing documents to the local construction administrative department. 3. Completion acceptance procedures 3.1 Completion pre-acceptance 3.1.1 When the unit's project meets the completion acceptance conditions, the contractor should fill in the project completion acceptance form and submit all completion acceptance information after completing the self-examination, self-inspection and self-evaluation work (Quality assurance data, assessment data, construction technical data, construction management data, and as-built drawings) are submitted to the project supervision department and applied for completion acceptance. 3.1.2 The chief supervisory engineer shall organize various professional supervisory engineers to conduct a comprehensive inspection of the completion data and the quality of each professional project. The contracting unit shall be urged to make timely rectifications of the problems found during the inspection. 3.1.3 After passing the acceptance inspection, the chief supervision engineer will sign the project completion inspection form and submit a quality assessment report to the construction unit. 3.2 Completion acceptance The supervision unit shall participate in the completion acceptance organized by the construction unit. 3.2.1 The construction unit, survey unit, design unit, construction unit, and supervision unit shall respectively report in writing the quality status of the engineering construction project, the performance of the engineering contract, and the implementation of national laws, regulations, and mandatory standards for engineering construction. . 3.2.2 Check the completion data provided by all parties involved in the project construction. 3.2.3 Check the physical quality of the project. According to the specific conditions of the project, random inspections will be carried out on the usage functions of the construction project. 3.2.4 Summarize and discuss the completion acceptance status, formulate completion acceptance opinions, and fill in the "Construction Project Completion Acceptance Record Form" and "Construction Project Completion Acceptance Report".

3.3 Completion acceptance and filing After the completion and acceptance of the construction project, the construction unit is responsible for completing the completion acceptance and filing with the filing department within 15 days. 4. The main content of the quality assessment report... >>

Question 8: How to write the acceptance method of the monitoring project. It is shameful to copy. It is for reference only.

Completion acceptance of the security monitoring project Report

Intelligent Monitoring System Project Acceptance Form

System (Project) Name: Road Intelligent Traffic Monitoring Project

System (Project) Level:

< p> Construction (User) Unit: xx Traffic Patrol Brigade

Design and Construction Unit: Shenzhen Hujiang Technology Co., Ltd.

Acceptance Date: Year Month Day

Table 1 System trial operation record

Date/time system operation status (including errors and missed alarms) Remarks on duty person

Note:

1 System operation status column If it is normal, put a "√" mark and fill it out at least once a day; if it is abnormal, please briefly explain the situation (including the date of repair) in the remarks column in a timely manner.

2. If the system has an alarm part, the alarm test shall be conducted once a day. If there is no missed alarm, put a "√" in the corresponding box; if there is a missed alarm, put an "X" and explain the situation in the remarks column; if there is a false alarm, fill in the corresponding remarks column truthfully.

Table 2 Construction Quality Spot Inspection and Acceptance

Project Requirements Method Inspection Results Spot Inspection Percentage

Qualified Basically Qualified Unqualified

Front-end Equipment 1 Installation The location (direction) is reasonable, and effective on-site spot inspection and observation is 5% to 10%

(At least 3 units of less than 10 units shall be accepted)

2. Installation quality (workmanship) Solid, clean, beautiful, Standardize on-site spot inspection and observation

3. The cable connection to the video cable must be in place, the connector is reliable, the power line is separated from the signal line and the control line, the direction is straight, and there is no twisting. Review, spot check or compare the drawings and data

p>

4 On-site power-on inspection is 100% if the power supply is working normally

Terminal equipment in the control room 5 The console and rack are installed smoothly and reasonably. On-site observation experience and spot check

6 Control equipment installation Easy to operate, safe on-site observation and experience

7 Flexible switches and buttons, safe on-site observation and inquiry

8 The rack and equipment grounding comply with GB50057 equipotential grounding requirements on-site observation and inquiry

9 The grounding resistance complies with the relevant requirements of Article 3.9.3 of the GB50348 specification. Check the inspection report or the relevant requirements of Article 6.3.6 of the GB50348 specification.

10 The lightning protection measures comply with the relevant requirements of Article 3.9.5 of the GB50348 specification. It is required to check the inspection report and conduct on-site observation

11. The rack cables are neatly tied and marked, with obvious numbers and markings. On-site observation and random inspection

12. The power supply cable is marked and the lead-in end is clearly marked. , Reliable on-site observation

13 On-site power-on inspection is 100% if the power supply works normally

Pipeline laying quality 14 The exposed pipelines are firm and beautiful, coordinated with the indoor decoration, and anti-interference On-site observation and spot check 1~2

15. There are junction boxes at the vertical and horizontal intersections of junction boxes and cable joints. Cables are installed and fixed. On-site observation and random inspection of 1~2 places are carried out according to regulations. 16. Concealed projects are carried out along with the work. Acceptance review: There is an acceptance form for concealed projects along with the work and the acceptance is reviewed

(If there is no acceptance form for concealed projects, please give a brief explanation in this column)

Inspection result statistics: KS ( Qualification rate) Installation quality inspection conclusion

Signature of the construction acceptance team: Acceptance date:

Note:

1 The acceptance requirements and methods involve the specific specifications. The relevant requirements of the "Technical Specifications for Safety Prevention Engineering" (GB50348 Specifications) shall prevail.

2 In the inspection result column, put a √ in the corresponding box according to the actual situation (a √ in the left column is deemed to be qualified; a √ in the middle column is deemed to be basically qualified; a √ in the right column is deemed to be basically qualified) unqualified).

3 Inspection result statistics: KS (pass rate) = number of passes + number of basic passes × 0.6 / number of project reviews (the number of project reviews will not be included if there is no requirement or actual lack of inspection).

4 Inspection conclusion: KS (pass rate) ≥ 0.8, it is judged as passed; 0.8> KS ≥ 0.6, it is judged as basically passed; KS >

Question 9: Construction project quality is completed How to write the acceptance conclusion in the acceptance opinion letter - Inspection batch quality acceptance record

1. Supervision acceptance record - whether it is qualified.

2. Supervision acceptance conclusion - all main control projects are qualified, general projects meet the specification requirements, and this inspection batch is qualified.

2. Sub-project quality acceptance records

1. Supervision acceptance conclusion (Part 1) - whether it is qualified or not.

2. Acceptance conclusion (Part 2) - This sub-item is qualified.

3. Sub-division project quality acceptance record

Supervision acceptance opinion - all included items are not missing and all are qualified. This sub-division is qualified and acceptance is agreed.

4. Subdivision project quality acceptance record

Acceptance opinion of the acceptance team - all subdivisions are included and all are qualified. This subdivision is qualified and acceptance is agreed.

Question 10: How to write a project completion report? Project Completion Report

1. Construction Overview and Construction Process

1. The XXX Factory Building 1 project is located in XX City. It was invested and developed by XXX. The XXX City Architectural Design Institute is responsible for the geological survey. Designed by XXX City Architectural Design Co., Ltd. and constructed by XXX City Construction Engineering Co., Ltd. The project is a two-story factory building with a concrete frame structure, a construction area of ??2428O, and a total construction cost of 1.8116 million yuan. The foundation of this project adopts prestressed concrete pipe pile foundation. The foundation concrete is C25, and the foundation cushion C15 concrete is 150mm. The masonry is built with MU7.5 shale bricks and M7.5 mixed mortar. The interior decoration adopts general plastering and white gray water sweeping. Doors and windows adopt rolling shutters, anti-theft iron doors, fire doors and silver-white aluminum alloy windows. The exterior decoration uses glass mosaics on the walls. The roof is composed of a 20-thick leveling layer of 1:2.5 cement waterproof mortar; a 3mm polyurethane waterproof coating; a 100mm foam concrete insulation layer and a 2% slope.

2. The start date of this project is September 15, 2009. The project progress is as follows:

The pile foundation project of this project was completed in late September 2009 and was constructed by XXX City The Engineering Quality Inspection Center conducts single pile vertical compressive static load tests and foundation pile reflection wave method tests to meet the design requirements. Construction of pile caps, foundation beams and structures above ±0.00 began in mid-October 2009, and the structure was capped in late January 2010. During this period, construction projects such as internal and external wall masonry, exterior wall decoration, and door and window installation will be carried out. In early March 2010, the overall project was basically completed.

2. Project characteristics and main measures

1. Project characteristics

(1) The construction period of this project is short.

(2) High quality requirements.

2. Main measures

(1) In view of the short construction period, this project uses computers to compile and manage engineering data. The construction layout is convenient for construction and reduces secondary transportation; the procurement of engineering materials and the entry of construction machinery and tools are organized according to the construction progress to reduce idle time. In this way, the quality of the project is ensured, the construction progress is accelerated, and the construction cost is reduced.

(2) In view of the quality requirements of this project, the formwork support of portal scaffolding was selected to speed up the construction progress. Due to the high requirements for decoration quality, we dispatched highly professional and experienced technical personnel to be responsible for the construction management of this project and carry out comprehensive quality management activities. The project management personnel have a clear division of labor and clear rights and responsibilities. The construction team can only enter the site after passing the assessment. Rewards and penalties are clearly defined to encourage excellence, which greatly mobilizes the enthusiasm of the construction team and ensures the quality of the project.

During the construction process, we will implement the quality and technical disclosure work and the "three inspections" system; strengthen the control of common quality problems to reduce rework; and seize the acceptance of hidden projects and the visa work of the projects.

3. In terms of civilized construction and safe production, our company has invested a lot of money and safe production facilities. The project department has strengthened communication and implemented the job responsibility system. In accordance with the "Construction Safety Inspection Standards" (JGJ59-99 ) and the "Guangdong Provincial Civilized Construction Inspection and Scoring Rules" require that responsibilities be divided into people, strict management, reasonable stacking of materials and machinery, and the construction site ensures that the site is cleared after completion. In addition to daily inspections, relevant personnel are regularly organized to inspect production safety every month. , conduct civilized construction, and conduct safety evaluations at each stage. During the construction period, inspection and scoring were carried out in five stages, and each time the quality standards were met, the self-assessment grade was: qualified. There were no safety incidents during the entire construction process.

3. Project quality self-assessment results

This project has been completed in accordance with the content requirements of the construction contract and design drawings. During the entire construction process, relevant laws, regulations and mandatory engineering construction standards will be strictly implemented. Test blocks, specimens and related materials involving structural safety were all subject to witness sampling testing in accordance with regulations, and they met the requirements: Sampling testing was conducted on important sub-projects involving functional requirements, and the results met the specification requirements. All concealed projects during construction have been designed and accepted by Party A’s representatives and meet the requirements. During the construction process of this project, *** conducted 4 settlement observations. The maximum settlement was 7mm and the minimum settlement was 5mm. The observation data showed that the overall settlement of the building was even and the settlement difference between two adjacent points was within the allowable range. Within the scope, the building settlement complied with the regulatory requirements, and no sinking, cracking or leakage was found in the building.

The ***5 sub-projects of this project have qualified quality, and the quality control information is basically complete. The main engineering materials and components have certification documents. The visual quality is average, and the project quality is qualified. The project information is complete, meets the acceptance requirements of the specification, and can pass the acceptance.

Project Manager:

Technical Person in Charge:

XXX City Construction Engineering Co., Ltd.

April 20, 2010 Eighth...>>