Joke Collection Website - Blessing messages - On September 14, five lines of Shanghai Metro continued to be shut down.

On September 14, five lines of Shanghai Metro continued to be shut down.

Since the operation of 14 in September, the whole line of Guanglan Road Station (excluding) of Shanghai Metro Line 2 extending eastward to Pudong International Airport Station has been suspended, and the whole line of Line 5 16, Pujiang Line and Maglev Line has been suspended. At the same time, speed limit measures are taken for overhead and ground line sections in the operation of the whole road network. Please inform each other and adjust the travel route in advance!

In addition, according to the actual situation of typhoon wind, Shanghai Metro will take adjustment measures to expand or narrow the scope of road network operation outage until it gradually resumes normal operation.

The specific operation lines (segments) on September 14 are as follows:

Shanghai Subway

The section from Xujingdong to Blu-ray on Line 2 is operating normally.

(The section from Blu-ray Road (excluding) to Pudong International Airport is suspended)

Line 5 is out of service.

16 line suspended operation.

The entire Pujiang line was shut down.

The whole maglev line is suspended.

Other lines of the road network are operating normally, and trains take speed limit measures on elevated ground sections.

Special note: The opening section of Shanghai Metro is based on the turn-back condition, so some underground stations will be included in the stopping section. Thank you for your understanding and cooperation.